| 1 | Item no:1 - Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for etc. complete Lift 0.00 M to 1.50 m |
| 2 | Itemno:2 - Excavation for foundation / pipe trenches in soft rock including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for |
| 3 | ItemNo.3- Dewatering the excavatyed trenches and pools of water by using pumps and other devices including disposing of the water to safe distance as directed by Engineer-in-Charge (including cost of machinery labour fuel )etc complete. |
| 4 | Item No.4-Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15cm to 20 cm thick including hand packing and compacting etc.complete. |
| 5 | Item No.5:- Providing and laying in situ Cement concrete in proporation .... of trap metal for foundation and bedding, including balling out water manually, formwork, compacting and curing etc. complete.P.C.C 1:2:4 |
| 6 | Item No. 6 :- Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth & even surface wherever necessary or roughening if spetial finish is to be provided & curing etc. complete. ( By weight batching & mix design for M-250 & M-300 only use of L&T, ACC Ambuja, Birla Gold, Manikgad, Rajashree etc. cement is permitted excluding M.S or Tor reinforcement in R.C.C. M-250grade 1) R.C.C. M-200 for vertical wall |
| 7 | Itemno: 7 - Providing & laying weep holes of 80mm AC/PVC pipe as per drawing for abutment returns, return walls etc. complete. |
| 8 | Item No.8:-Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes,caps,footing, foundation,slab, beams, columns,canopies, staircase, newels, chajjas, lintels,pardies,coping,fine arches etc. as per detailed designs, drawing & schedule s including cutting,bending,hooking the bars, binding with wires or tack welding & supporting as required etc. complete (including cost of binding wire). Tor steel |
| 9 | Item no:9-Providing, constructing coffer dam in river basin / dam storages as per type design including excavation, filling, the middle portion with B. C. soil (in gunny bags if requried). Providing impervious / semipervious materials on both side of B.C. soil (in gunny bags if required) including ramming, compacting to the satisfaction of Engineer-in-charge, till the complction of work includingdismantling coffer dam after completion of works and disposing off the material as directed by the Engineer-in-charge. |
| 10 | Item no:10-Providing and fixing 90 cm x 60 cm Marble plate engraving 10 cm. height letter , figures including paint ing the lefters/ figures with approved colour and shade complete |
| 11 | Item No 11-Testing Of Concrete |
| 12 | Basic Test of Cement |
| 13 | Basic Test of Aggregate |
| 14 | Add 18% GST Please Enable Macros to View BoQ information |