| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 2 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 3 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 4 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 5 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 6 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 7 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 8 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 9 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 10 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 11 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 12 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 13 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 14 | Erection of suspension clamp for LT ABC of any size |
| 15 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 16 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 17 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25 + 1 x 25 sqmm with bare/insulated Messenger through existing poles |
| 18 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 19 | Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 20 | Renewal of existing damaged/broken old LT stay in existing stay rod. |
| 21 | Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitting of all items and conveyance of all materials. Please Enable Macros to View BoQ information |