| 1 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 2 | Water Bound Macadam Sub-base/Base (WBM Grading 2) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 (By Machinary Means) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 3 | Water Bound Macadam Sub-base/Base (WBM Grading 3) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 (By Machinary Means) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 4 | Providing and applying primer coat of Low Porosity with Bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70 Kg/Sqm using mechanical means as per Technical Specification Clause 502. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 5 | Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer/Bituminous surface as per Technical Specification Clause 503. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 6 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 ( By Manual Means) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 7 | Providing and laying seal coat by manual means with VG-10 sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 ( By Manual Means) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 8 | Brick Soling .Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 9 | First Year Maintainance (@0% of Total Work Amount of S.No. 1 to S.No.8) |
| 10 | Second Year Maintainance (@0.75% of Total Work Amount of S.No. 1 to S.No.8) |
| 11 | Third Year Maintainance (@1.5% of Total Work Amount of S.No. 1 to S.No.8) |
| 12 | Fourth Year Maintainance (@2.25% of Total Work Amount of S.No. 1 to S.No.8) |
| 13 | Fifth Year Maintainance (@3.0% of Total Work Amount of S.No. 1 to S.No.8) Please Enable Macros to View BoQ information |