| 1 | Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30 cms.measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. out side the removal of rubbish upto area cleared. SOR/259(i) Same as above but grass only SOR-20/259(a)/4.06 |
| 2 | Surface dressing of the ground including removing vegetation and in equalities not exceeding 15cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m (All kind of soil) DSR-18/2.28.1 |
| 3 | Tractor with trolley including POL driver (AR/GNIDA) SOR-20/SL.NO.19/ Chapter 2 |
| 4 | Supply of labour SOR-20/SI.NO.12/Chapter 2 |
| 5 | Excavation in foundation in ordinary soil (loam,clay or sand) including lift up to 1.50 m. and lead up to 30m. and including filling watering and ramming of excavated earth into the trenches or into the space of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m. from the foundation trenches ( where machine con not rech/move).SOR-251a |
| 6 | Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required. (DSR-2018/2.24.1/A.R.) |
| 7 | CARTAGE OF Earth of fly ash when added to schedule item no. 253 |
| 8 | lead upto 2 KM. (SOR-20/261C) |
| 9 | Excavating holes more than 0.1 cum & up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil; as directed within a lead of 50 m and lift up to 1.5 m. All kind of soil (DSR-18/2.30.1) |
| 10 | Repainting letters up to 2.5 cm. size including supply of all materials, labours & tools and plants etc. required for proper completion of the work. As in item 820 above but size above 8cm. but up to 15cm.SOR-20/822/21.07 |
| 11 | Cement concrete with 2cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (UPPWD/SOR-2020/279(a)) |
| 12 | Painting or varnishing with valsper or other approved high grade enamel or super par synthetic clean varnish complete one coat over previously painted surface including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm ISI no. 105/106/133-1950.As in item (647) above but for every subsequent coat on previously treated surface SOR-647+648 |
| 13 | Repainting letters up to 2.5 cm. size including supply of all materials, labours & tools and plants etc. required for proper completion of the work. As in item 817 above 8cm. but up to 15cm. SOR-20/819/21.04 |
| 14 | Tractor with water tanker with cost water including POL SOR-20/SI.NO.27/Chapter 2 |
| 15 | Supply of labour for water tanker (AR/GNIDA) |
| 16 | Providing JCB with driver and including POL (AR/GNIDA) (SOR-20/S/NO. 31/Chapter 2) |
| 17 | M-150 Brick Work1:4 one cement & four Coarse sand of 2.20 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work. SOR-2020, item-305(a) |
| 18 | 12 mm cement plaster of mix |
| 19 | 1:6 (1 cement: 6 coarse sand) DSR-18/13.4.2 |
| 20 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20, Item No. /9.06/E/case-II) |
| 21 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 22 | Thermo-Mechanically Treated bars of grade Fe-500D or more. (Sail Steel) (DSR-2018/5.22.6/AR) |
| 23 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 24 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (Sail Steel) (DSR-2018/10.25.2/AR) |
| 25 | Cement concrete with 2cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (UPPWD/SOR-2020/279(a)) |
| 26 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface: Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Rates are inclusive of all taxes, royalty etc. all T&P/machine material and labour required for proper completion of work. (SOR-20/New Item/Sr.No. 19.01) |
| 27 | Labour Cess and GST will be paid extra as per govt.orders Please Enable Macros to View BoQ information |