|
| 1 | Supply of Minimum 8 Core Rack Mountable Server 32 GB DDR5 RAM and 64 Bit windown server os 1 TB SSD with required licences for DB and Application | Supply of Minimum 8 Core Rack Mountable Server 32 GB DDR5 RAM and 64 Bit windown server os 1 TB SSD with required licences for DB and Application |
| 2 | Supply of Industrial standard kiosk for mounting the Android tablet and flatbed Scanner | Supply of Industrial standard kiosk for mounting the Android tablet and flatbed Scanner |
| 3 | Supply of Industrial standard Wi-fi enabled Android or iOS tablet | Supply of Industrial standard Wi-fi enabled Android or iOS tablet |
| 4 | Supply of Barcode QR Code Scanner to scan the QR Code in the boarding pass or Air ticket | Supply of Barcode QR Code Scanner to scan the QR Code in the boarding pass or Air ticket |
| 5 | Manageable PoE Switch 24 Port | Manageable PoE Switch 24 Port |
| 6 | Wireless Access Point | Wireless Access Point |
| 7 | 9U Rack Rack Wall Mountable or Floor Standing with 650va Line Interactive UPS | 9U Rack Rack Wall Mountable or Floor Standing with 650va Line Interactive UPS |
| 8 | 4 Pair Cat6 Cable | 4 Pair Cat6 Cable |
| 9 | Armoured 6 Core OFC Cable | Armoured 6 Core OFC Cable |
| 10 | Installation and Configuration of Server | Installation and Configuration of Server |
| 11 | Installation and Configuration of Switch and Rack | Installation and Configuration of Switch and Rack |
| 12 | Installation of Integrated Kiosk and Tablet and Scanner with required Accessories | Installation of Integrated Kiosk and Tablet and Scanner with required Accessories |
| 13 | Installation and configuration of WAP | Installation and configuration of WAP |
| 14 | Laying of OFC Cable with proper Insulation Materials like GI PIPE or HDPE Pipe or Rubber Duct Covers as per site condition | Laying of OFC Cable with proper Insulation Materials like GI PIPE or HDPE Pipe or Rubber Duct Covers as per site condition |
| 15 | Laying of CAT6 Cable with proper Insulation Materials like HDPE Pipe or Rubber Duct Covers as per site condition | Laying of CAT6 Cable with proper Insulation Materials like HDPE Pipe or Rubber Duct Covers as per site condition |
| 16 | Installation and configuration of web application | Installation and configuration of web application |
| 17 | Integration of Airlines API with Server and application for the verifying the passenger details | Integration of Airlines API with Server and application for the verifying the passenger details |