| 1 | Brick work with Common burnt clay F.P.S (non modular) bricks of class in 1:4 one cement & four Coarse sand of 2.20 F.M mortar in foundation and plinth DSR 6.1.1 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 2 | 12mm cement Plaster of 1:4 (1 cement: 4 coarse sand) mix DSR (2023) 13.4.1 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 3 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) DSR (2023) 4.10 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 4 | S/F of 80mm thick ISI marked I-shaped mechanically compressed Interlocking cement concrete paver blocks, smooth high laoss finish, skid resistent, manufactured from rubber mouldes throuh vibrocompression mechanism , high pressure and control vibration machine having plan dimension 200x(160x120mm) with minimum 5mm thick topping.The compressive strength of concrete paver block shall not be less than 30 Mpa and weight 4.5 kg per No. confirming to IS 15658-2006 as per SI No. 5(a) Gray Base Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 5 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the Engineer-incharge within a distance of 60 metre (200 feet). Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 6 | Laying of Interlocking Tiles of 60 to 80 mm thick including levelling and dressing of surface up to required level and slopes over 30 mm thick bed and filling joints with fine sand including cost of fine sand, labour, T&P etc complete But excluding cost of Tile as directed by Engineer in charge. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 7 | Add 18% GST Please Enable Macros to View BoQ information |