| 1 | Construction of embankment in ordianry soil with approved material obtained from available land as permitted and approved by Engineer-in-charge and as per Technical Speciation clause 301.3.4.1 with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 as per Technical Specification clause 301.5 |
| 2 | Consturction of grangular sub base by providing well graded material mixing in uniform layers with motor grader on prepared surface mixing by mixeer in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density complete as per technical specification clause 401A |
| 3 | Providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kN static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 |
| 4 | Providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kN static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 |
| 5 | Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.7-1.0kg/sqm using mechanical means as per Technical specification clause 502 |
| 6 | Providing and applying tack coat with Bitumen VG-10 BULK using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 7 | Providing, laying and rolling of open graded mix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or imulsion to required line, grade and level to serve as wearing course on apreviously prepared base , including mixing in a suitable plant, laying and rolling with a three wheeled 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of type C as per Technical specification clause 508 (By Hot Mix Method) |
| 8 | Providing, and laying sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using type C as per Technical specification clause 510 |
| 9 | Providing and fixing of Recto reflective steel sign board as per drawing design including writing of details as specified by Engineer in charge. including supply of all materials, labour T&P, cartage upto site complete in all respect required for proper completion of the work and as per direction of E/I.(SOR Banda 2020-21) |
| 10 | Brick edging on both sides of the road with M7150 bricks 8 cm wide and 11.5 cm deep laid with mud mortar including cost of bricks all labour finished to be required template and in proper alignment T&P and also including dressing and ramming the excavated earth as per direction of engineer in charge (S.I. 765) |
| 11 | Providing and laying reinforced cement concrete pipe NP3 350 mm dia for culverts first class bedding of granular material including fixing with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonary works in head walls and paracets clause |
| 12 | Maintenance cost of 1st year @ 0% cost of work on item No.1 to 10 |
| 13 | Maintenance cost of 2ndyear @1.00% cost of work on item No.1 to 10 |
| 14 | Maintenance cost of 3rd year @1.50% cost f work on item No.1 to 10 |
| 15 | Maintenance cost of 4th year @2.00% cost of work on item No.1 to 10 |
| 16 | Maintenance cost of 5th year @3.00% cost of work on item No.1 to 10 |
| 17 | Providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kN static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 |
| 18 | Earth work in surface excavtion not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m ad directed by the E/I all kinds of soil (DAR 2.1.1) |
| 19 | Providing and laying of 1:6::12 (1 cement 6 fine sand 12 graded brick aggregte 40mm nominal size) including during supply of all material labour T&P etc complete in all respect required for proper completion of the work. (PWD 273) |
| 20 | Brick masonary work in cement mortar 1:6 in foundation and plinth complete excluding pointing and plastering as per drawing and technical specification clause (DAR 6.1.1) |
| 21 | Providing and laying of cement concrete of specified grade with approved stone grit in proportions of 1:1.5:3 in excluding supply of reinforcement and its bending but including its fixing and binding wire and including necessary centering and shuttering etc. (DAR 4.1.2) i |
| 22 | Maintenance cost of 1st year @ 0% cost of work on item No.16 to 21 |
| 23 | Maintenance cost of 2ndyear @1.00% cost of work on item No.16 to 21 |
| 24 | Maintenance cost of 3rd year @1.50% cost f work on item No.16 to 21 |
| 25 | Maintenance cost of 4th year @2.00% cost of work on item No.16 to 21 |
| 26 | Maintenance cost of 5th year @3.00% cost of work on item No.16 to 21 Please Enable Macros to View BoQ information |