| 1 | Supply and erection of steel tubular pole 410-SP-55, 11 Mtr long, 227 Kg complete with 1/6th of overall length of pole below ground level with 45 cm dia cement concrete with 45cm dia cement plinth around the pole and 45cm above the ground level.The foundation of underground will not be less than 20 cm thick layer of cement concrete in the ration of 1:3:6 ( cement : coarse sand : over burnt brick ballast/stone ballast). The brick ballast / stone ballast will be used of 1.25 cm size with stone pad of 30X30X7.5 cm at the base. The cost includes all men and materials forproper completion of work. (It should be galvanised in first section as per technical specfications of DVVNL) |
| 2 | Supply and fixing of 11 KV originating/terminating pole fitting including all T&P,men and material for proper completion of work as per UPSIDC schedule no E03.01; [ (a) MS Channel 100x50mm (7.9 kg/mtr), 1.15 mtr=1 No., (b) Straight MS channel 75X40 mm, 2.24 mtr long=1 No., (c) MS clamp made out of MS flat 50X6 mm including all bolts nuts washers=2 No., (d) Clamp for 11 kV Disc Fitting made out of MS flat 50X6 mm including all bolts nuts washers=1 No., (e) 11 KV Disc and fittings= 3 No. (f) Eye bolt 110X12 mm= 2 No.)] ( With recent specifications of DVVNL) |
| 3 | Supply and fixing of 11 KV ordinary pole fitting with guarding Channel 2.24 M long instaed of Z clamps including all T&P,men and material for proper completion of work as per UPSIDC schedule no E03.02 [(a) V shape MS chhanel 75X40 (6.8 kg/mtr)=1 No., (b) Straight MS channel 75X40 mm (7.5 kg/mtr), 2.24 mtr long=1 No., (c) MS clamp made out of MS flat 50X6 mm including all bolts nuts washers=2 No., (d) Top MS cap cum F clamp with 11 kV Pin Insulator = 1 No., (e) 11 kV Pin with Insulator= 2 No. , (f) Eye bolt 110X12 mm= 2 No.)] ( With recent specifications of DVVNL) ] |
| 4 | Supply and fixing of 11KV Disc fitting complete UPSIDC schedule no E03.08 |
| 5 | Supply and fixing of 11KV pin insulator complete UPSIDC schedule no E03.07 |
| 6 | Supply and burying of 40mm dia and 4.5M long GI pipe vertically for earthing having 12mm dia hole spaced 75mm apart drilled upto 2 mtr. From the bottom complete with earthing lead of no. 6 to 8 SWG GI wire in GI pipe upto appron upto switch board 30 CM square box with hinged cover masonary enclosure. Funnel of top, alternate layers of charcoal and salt at least 150 mm thick alround etc. as per direction E/I complete in all respect as per drawing as per UPPWD Sch. No. 701 |
| 7 | S/B of 600x600x6mm GI plate vertical for earthing with its top at least 3 M. below ground level complete with 20 mm dia. GI pipe and funnel for watering andone earthing leads of no. 8 to 10 SWG GI wire in 15 mm dia GI pipe upto switch board (from appron to switch board the cost of GI pipe snd GI wire be extra)30 CM square C.I. frame with hinged cover masonary housing alternate layers of charcoal /Coke and salt at least 150 mm thick alround etc. as per direction E/I complete in all respect as per drawing as per UPPWD Sch. No. 702 |
| 8 | Supply & erection of overhead line with ACSR conductor on poles / service bracket including binding etc. complete in all respects (UPPWD-2018-627) (For Dog Conductor Specifications as per DVVNL) |
| 9 | Supply,sagging,tensioning,jointing and binding of ACSR weasel conductor including cost of aluminium tape binding wire and jointing sleeves complete in all respects including materiaI,men an T&P for proper completion of work UPSIDC schedule No E10.(a) |
| 10 | Supply,sagging,tensioning,jointing and binding of ACSR Rabbit conductor including cost of aluminium tape binding wire and jointing sleeves complete in all respects including materiaI,men an T&P for proper completion of work as per UPSIDC schedule No E10.10 |
| 11 | Supply & sagging,tensioning,jointing,binding two parallel length of G.I. no. 6 SWG wire along the span and G.I. no. 6 SWG wire across the span each at an interval of 5m for cross lacing complete as per direction of engineer-in-charge as per SIDC schedule E12.01 |
| 12 | Supply and sagging , tensioning , jointing,andbinding of GI wire no 6 SWG on ST POLE /Service bracket complete in all respect including all men and materials T&P, require proper complition of work . |
| 13 | Supply & fixing LT ordinary pole fitting suitable for single ckt three phase Six wire line in vertical configruration of two numbers 50 x6 mm clamp of MS flate with two numbers 100x115mm shackle insulator and one number 50x6mm M.S clamp for earth wire. UPSIDC Sch 13.2 |
| 14 | Supply & fixing LT extra angle / Section pole fitting suitable for single ckt sthree phase six wire line of two numbers shackle insulator of 100x115 mm size and with four number 250x40x3 mm with 18mm dia hole including cost of nut & bolt, washers, men and T&P PWD SCH 16. 2 |
| 15 | Supply & fixing of 100 x 110 mm shackle insulator /100 x 80 mm pin insulator including G.I. Bolts/ spindle nuts etc.Complete in all respect.as pre UPPWD Sch. No. 621 |
| 16 | Painting of the electric pole with 2 coats of aluminium paint over red oxide primer complete in all respect UPPWD 634 |
| 17 | High Tension 11 KV Grade XLPESupply and laying of 3 core standered aluminium conductor XLPE (Cross linked polyethylene) insulated PVC bedded, Galvanised flat steel strip armoured cables confirming to I.S. 7098 (Part-II with latest amendments) 11 KV grade at a depth of 900 mm below ground level over a cushion of 100 mm thick fine river sand all around and protected with well burnt bricks on sides and on top put across. The armouring of cable shall be properly connected with earth conductor by clamps etc. (Havells/KEI/Grandly/gloster/polycab)(f) 120 sq. mm 3 core (UPPWD 506 (f)) |
| 18 | Supply and fixing of jointing kit suitable for 70-120 sq.mm 3 core H.T.cable outdoor type with kit no. OT-5 including all materials,labour and T&P required for proper completion of work as per specification |
| 19 | Supply and fixing of 100 mm dia G.l.pipes B,class for climbing up the cable from ground to over head line including all accessories,materiaIs,labours and T&P required for proper completion of work as per specification |
| 20 | Supply and fixing of anticlimbing device fabricated from G.I. flat of 25 mmX6 mm size in a shape of ring of the pole size,having G.l.flat pointed fins of length 225 mm in 8 nos and also barbed wire in 200 mm length above the said ring including all material labour T&P.etc complete. |
| 21 | Supply & fixing of danger board fabricated from 10 gauge MS sheet as approved by engineer in charge complete in all respect |
| 22 | Supply & erection of stay of Composite mains for ST pole with GI anchor plate (152X152X6mm) stay rod (16mm dia X 1.85 m Iong),GI stay bow (16 mm dia rod,thimble,double stay tightener,clamps & stay wire (GS 7/3.15 mm) including grouting in 1:4:8 ratio of cement concrete using coarse sand,over burnt brick ballast as per direction of engineer in charge complete in all respect |
| 23 | Supply & fixing of M.S Earthing Rod (2500x20mm) in vertically ground level and connecting the pole with help of 6 SWG GI wire including cost off all material , men and TNP. |
| 24 | Supply and fixing of 11KV TPMO Switch of 400 amps. Copmlete in all respect as per direction of Engineer in charge complete incuding all T&p, men and material required for proper completion. Stock Issue 2023-24, |
| 25 | S/F of 11 kV three phase D.O. fuse set complete with suitable clamps, nuts & bolts, fuse wire etc. |
| 26 | Supply, installation, testing & commissioning of outdoor type Copper wound oil cooled transformer of rating 400 KVA, 11/0.433 KV complete as per IS-1180-2014 Level-II as per approved list of UPPCL Stock Issue 2023-24, |
| 27 | Making plinth fof installation of 400 kva t/f installation of size 2x2x1.5 M PLINTH with all respect as per Technical specificationof Dvvnl |
| 28 | S/F welded wire mesh fencing of 5x3x2.4 mtr. And 2x2.4 M gate for transformer including excavation base concrete brick work back filling etc. complete in all respects |
| 29 | Supply & laying of 160 mm dia I/D HDPE DWC pipe ISI marked along with all accessories like socket, bend, couple etc. confirming to IS 14930 Part-II complete with fitting and cutting, jointing etc. direct in ground (75 cm delow ground level ) including through horizontal boring by making pit at regular interval and refiling the pits complete in all respects. |
| 30 | Supply & laying 400 sq mm 3.5 core Al. conductor PVC insulated armoured, served, sheathed cable 1100 V garade in The armouring of the cable shall be properly connected with earth conductor by clamp etc. as per PWD Sch. 501(t) & 507 (Havells/KEI/Grandly/Gloster/Polycab) |
| 31 | S/F of brass nickel Plated compression gland for PVC insulated and armoured served sheathed ,underground cable including rubber ring etc. comlete in all respects.the armouring of the cable shall be properly connected with the earth as per direction of Engineer - incharge as per UPPWD sch. no. 503 (t) 400 sq. mm 3.5 core |
| 32 | Supply, laying and fixing 150 mm dia GI pipe B class in ground complete with GI fittings including trenching 90 cm deep and refilling etc. complete in all respect |
| 33 | Supply & Erection of factory fabricated and wired metal clad dust and vermin proof floor mounting , MS Channel Base with bottom and top cable entreis Electrical control panel with TPN MCCB's ( four pole 36 KA with thermal magnatic release) switches copmlete and instrument chamber etc. complete in all respects. (Incoming 400 Amp.MCCB-1 No. & outgoing 200 Amp. MCCB's 2 Nos. & 63 Amp. MCCB-1 Nos. as per UPPWD Sch. No. 813B-II |
| 34 | High mast and street lights Supply & Fixing of 12.5 Mtr. High Mast shaft of approved make with rising system hot dip galvanized in side & out side dip, heaving pole sheet thickness 3 mm top dia minimum 150 mm bottom dia 310 mm base plate 25 mm thick suitable for wing velocity as per IS 875 part 3 & having no circumferential weld, with accessories for high mast such as had frame suitable for 6 luminaries & its control gear boxes 0.75 HP power tool moter, 3 point suspension system with steel wire rope 6 mm dia double drum winch, including making suitable foundation as per manufacture drawing, site regiment along with foundation bolts, nuts washers, anchor plates etc. complete in all respect.(Bajaj/Philips/Wipro, Crompton make) with UPSIDA prescribed Logo |
| 35 | Supply & Fixing of 16 Mtr. High Mast shaft of approved make with rising system hot dip galvanized in side & out side dip, heaving pole sheet thickness 3 mm top dia minimum 150 mm bottom dia 360 mm base plate 32 mm thick suitable for wing velocity as per IS 875 part 3 & having no circumferential weld, with accessories for high mast such as had frame suitable for 6 to 12 luminaries & its control gear boxes 1.5 HP power tool moter, 3 point suspension system with steel wire rope 6 mm dia double drum winch, including making suitable foundation as per manufacture drawing, site regiment along with foundation bolts, nuts washers, anchor plates etc. complete in all respect.(Bajaj/Philips/Wipro,Crompton make) with UPSIDA prescribed Logo |
| 36 | Supply & fixing of factory wired integral 150 W LED flood light luminaries with die cast aluminium housing built with driver set confirming to IP 66 protection (with 5 years of warranty) complete in all respect,Cat.-AA (Bajaj/Philips/Wipro,Crompton make) |
| 37 | Supply & fixing of factory wired integral 200 W LED flood light luminaries with die cast aluminium housing built with driver set confirming to IP 66 protection (with 5 years of warranty) complete in all respect,Cat.-AA(Bajaj/Philips/Wipro,Crompton make) |
| 38 | Supply and fixing 25A TPN capacity of automatic street light cubicle control panel painted with anticorrosive alkali and acid proof paint consisting of time switch TSO 100 series with ML-3 contactors, HRC fuses, isolating switch metering instrument & instrument box with CTs etc. complete in all respect. |
| 39 | Supplying and laying of 16 sq.mm 4 core aluminium conductor PVC insulated, armoured, served, sheathed cable 1100 V grade at a depth of 750 mm below ground level over a cushion of 75 mm thick sand alround and protected with burnt bricks on sides and on top complete in all respects. ((Havells/KEI/Grandly/gloster/polycab make) |
| 40 | Supply & Laying of 63 mm HDPE pipe ISI marked along with all accessories like socket,bend,couple etc. confirming to IS 14930 Part II complete with fitting and cutting,jointing etc in existing treanch. including cost of material,labour and T&P. |
| 41 | Supply & fixing of 16 sq. mm 4 core brass nickle plated compression gland for PVC insulated cable complete in all respect. |
| 42 | Supply & fixing of 16 sq. mm 4 core size pin or plan type copper tin plated socket/lug to cable leads with insulated tape and making connection to point complete in all respect. |
| 43 | Supply & fixing of 50 mm dia GI pipe B class for climbing up the cable from ground to over head line LT pole complete with GI fitting including material,labour and T&P as per SIDC Sch item No. 25A.1(LS 6.0 mtr for each HM) |
| 44 | Supply & fixing MS clamp made out from 50x6mm MS flat for securing GI Pipe/HDPE with ST pole. (06 Pole x 2 No.=12) |
| 45 | Providing & fixing 32mm x6mm G.I. earth strip on surface or in recess including cost of GI saddle/Al. Alloy/cadmium/PVC fastener etc.plated iron screw etc. as required for connections. (5M for each) |
| 46 | Supply and erection of Double Pole structure consisting of 410-SP-56,11m long 241 Kg complete steel tubular pole to be grouted as 1/6th of overall length below ground level with 45 cm dia cement concrete plinth around the pole & 45 cm above the ground level. The foundation of underground will not be less than 20 cm thick layer of cement concrete in the ration of 1:3:6 ( cement : coarse sand : over burnt brick ballast/stone ballast). The brick ballast / stone ballast will be used of 1.25 cm size with stone pad of 30X30X7.5 cm at the base. The cost includes all men and material.UPSIDC schedule No E04A.1.I |
| 47 | Supply & fixxing of M.S Top channel of 125x65x2240 mm including cost of holding clamps and materials for proper completion of work as per direction of Engineer in charge |
| 48 | Supply & fixxing of M.S droper channel of 100x50x2000 mm including cost of holding clamps and materials for proper completion of work as per direction of Engineer in charge |
| 49 | Supply & fixing of Straight M.S.channel 75X40 mm,2.24m long complete as per SIDC Sch.No.3(3)E36.01 |
| 50 | Supply & laying 70 sq mm 3 core Al. conductor XLPE insulated PVC bedded galvanised flat steel strip armoured, served, sheated cable 11 KV grade laid with existing DWC Pipe in ground. The armouring of the cable shall be properly connected with earth conductor by clamp etc. as per PWD Sch. 506(d)&507 (Polycab/Havells/Grandlay/Gloster/KEI Make) |
| 51 | Supply and installation,testing & commissioning of outdoor type aluminium wound oil cooled transformer of ratings 25 KVA, 11/.04 KV on double pole including cost of base channel & holding clamps.complete as per IS-1180-2014 (Discom Approved Make) proper completion of work as per direction of Engineer in charge |
| 52 | Supply & fixing 90W LED Street light having die cast aluminium body and diffuser with driver set suitable for 90 Watt confirming to IP 66 protection complete in all respect with surge protection device. Minimum CAT AA (Crompton/Philips with 5 year warrenty against defects,damaged & missing) Make: Crompton/Philips/Bajaj/Wipro |
| 53 | S/F of street light junction box made of SMC material complete with 4 way terminal block, cable gland etc. |
| 54 | S/F of 6 Amp to 32 Amp SP MCB (10KA) C curve |
| 55 | Supply & fixing 32mm dia,1.20M long GI bend pipe with 02 nos. clamp of 50x6mm MS Flat suitable for fixing street light on ST pole including cost of men and T&P. |
| 56 | Suppy,laying & drawing of 3x1.5 Sq mm PVC insulated copper cable for Street/flood lights connection in existing pipe/surface/air as required including cost of material, men and T&P.(Havells/Polycab/Grandlay/Gloster/KEI make) |
| 57 | Supplying and laying of 25 sq.mm 3.5 core aluminium conductor PVC insulated, armoured, served, sheathed cable 1100 V grade at a depth of 750 mm below ground level over a cushion of 75 mm thick sand alround and protected with burnt bricks on sides and on top complete in all respects. (Havells/Polycab/Grandley/Gloster/KEI) |
| 58 | Supply and laying of 16 sq mm 2 core aluminium conductor PVC insulated , armoured , served ,sheathed cable 1100 v grade in existing pipe/surface/pole etc.(Havells/Polycab/Grandley/Gloster/KEI) |
| 59 | Supply & fixing of 25 sq. mm 3.5 core cable socket/lug with insulated tape in cable termination complete in all respect. |
| 60 | Supply & fixing of 16 sq. mm 2 core cable socket/lug with insulated tape in cable termination complete in all respect. |
| 61 | Supply & fixing of 25 sq. mm 3.5 core brass nickle plated compression gland for PVC insulated cable complete in all respect. |
| 62 | Supply and fixing of brass nickle plated compression gland for PVC insulated & armoured served sheathed, underground cable including rubber ring etc. complete inall respect. The armouring of the cable shall be properly connected with the earth as per direction of EngineerIncharge. |
| 63 | Supply & fixing 40A TPN capacity of automatic street light cubical panel painted with anti corrosive alkali and acid proof paint consisting of digitel/time switch TSO 100 series with ML-3 contactors,HRC fuses/MCB/MCCB/ isolating switch metering instrument & instrument box with CT's etc or as directed . Design & material will be approved by Engineer in charge. |
| 64 | Supply and Laying of 63 mm HDPE/DWC pipe ( 750 mm below ) ISI marked through horizontal boring ( trenchless )by making pit at regular interval and refiling the pit after work as before on road crossing including cost of all material , men and T&P , confirming to IS 14930 Part II (Road Crossing ). |
| 65 | Supply & Laying of 90 mm dia (OD-90 mm & ID-76 mm nominal) DWC HDPE pipe ISI marked along with all accessories like socket, bend,couple etc. confirming to IS 14930 Part-II complete with fitting and cutting, jointing etc. direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc. complete in all respect |
| 66 | Painting letter ( Pole no. ) 2.5 cmm up to 8.0 cm size complete on street light pole/panel/other electrical properties under UPSIDA including cost of all material , men and T&P. UPPWD CIVILSOR Sch Item Mno.817, Ch-26 |
| 67 | Supply & fixing of LED light Strip with driver on street light pole at entrances including cost work T&P men and material complete in all respect. The LED strip should be in tri Colour as red, white and green (each colour 6 mtr.respectively.) With 01 Year warranty against defects/damage/missing.( Philips, Bajaj, Crompton Wipro make) |
| 68 | Supply and wiring of sub main with 02 nos.of 2.5 sq.mm FRLSH PVC insulated 1100 V grade single core multistrand copper conductor cable in existing conduit complete with supply of all material labour and T&P required for proper completion of work as directed E/I |
| 69 | Fabrication, supply and fixing of work information board in M.S. frame made by 50mm dia Square Pipe of Stainless steel grade SS-304 & 16 mm thick base plate with back supporting of bracing by MS flat of 25x6mm and 2.85 Mtr long supporting leg made from 65mm pipe SS-304 grade with proper grouting arrangement. The board should be Retro reflective type in green color with white letters as required and shall be fixed at a height of 1.2 Meter from ground by providing 0.45x0.45x0.60 Mtr cement concrete stone pad as per drawing enclosed.The Borad Should be installed within 07 day of signing of Contract Boand.) |
| 70 | AMC for entire street light network including high mast for 3 years in IA Orni S&F single unit Aviation obstruction blinking RED LED Light with making connection etc. complete in all respect on top of the as per direction of engineer incharge. (CAT AAA) as per UPPWD Sch item No. 409 |
| 71 | S&F junction box made from MS Sheet of 200x300x100mm duly painted, complete with cable glands, connector etc. suitable for 24 Nos. Flood lights connection. |
| 72 | S&F Annealed tinned Copper flexible soft PVC/Rubber insulated trailing cable of 4.0 sq.mm 5 core in full length suitable upto 30 Mtr height. |
| 73 | Supply and fixing of male-female plug socket for 16 meter high mast lighting system complete in all respects. |
| 74 | Rewinding/Repairing of 1.5 HP 3 Phase 415V Burnt AC Power Tool Motor with B-Class super enamel Copper wire including dismantling and re-fixing at Original place |
| 75 | Supply & top-up gear oil in winch machine by opening gear box including cost of material, men and T&P. |
| 76 | Oiling & greasing of SS wire rope set and other moving parts by lowering down.re-hoisting of lantarn carriage including cost of material, men and T&P |
| 77 | S&F double drum 750 Kg winch machine suiable for high Mast Light including making/modification proper arrangement for installation in existing shaft. |
| 78 | Supply & fixing Gl lantern carriage made from 50NB ERW Class B Pipe suitable for 16/20/30 mtr lighting fixing including lowering & hoisting of system and all other associated work along with cost of men, material and T&P. |
| 79 | S&F of stainless steel grade AIS1316 steel wire rope set 6-8 mm diameter in full length suitable for 12/16/20/30 Mtr height on existing winch machine including making/modification proper arrangement for installation in existing machine. |
| 80 | Supply & fixing 3-Phase, 63A 415V Power Contractor ML-3 type or equel for Automatic Street & High Mast Control Panel in cluding cost of Connection, men and T&P. |
| 81 | Supply & fixing Astronomical time switch L&T/Siemens/C&S or equel brand including cost of connection, material, men and T&P. |
| 82 | S&F of 63 amp. 4 pole MCB (10KA cat B) for control panel complete in all respects |
| 83 | S&F of 40 amp. double pole MCB (10KA cat B) for control panel complete in all respects |
| 84 | S&F of 100 Amp. T.P. Isolator CAT B |
| 85 | S&F of 80 to 100 Amp 4 pole MCCB (16 KA) ThermalMagnetic release |
| 86 | Supply and erection of steel tubular pole 410-SP-55, 11 Mtr long, 227 Kg complete with 1/6th of overall length of pole below ground level with 45 cm dia cement concrete with 45cm dia cement plinth around the pole and 45cm above the ground level.The foundation of underground will not be less than 20 cm thick layer of cement concrete in the ration of 1:3:6 ( cement : coarse sand : over burnt brick ballast/stone ballast). The brick ballast / stone ballast will be used of 1.25 cm size with stone pad of 30X30X7.5 cm at the base. The cost includes all men and materials forproper completion of work. (It should be galvanised in first section as per technical specfications of DVVNL) |
| 87 | Supply and making straight through joint with cast resin compound including ferrules and other joints materials for following size of PVC Insulated and PVC sheathed/XLPE aluminium conductor 25/35/50 sq.mm 3.5 core cable of 1100 v grade complete rates |
| 88 | Supplying and laying of 16 sq.mm 4 core aluminium conductor PVC insulated, armoured, served, sheathed cable 1100 V grade at a depth of 750 mm below ground level with existing G.I./M.S./DWC or Hume pipe in road crossing or along the wall complete in all respects.(Havells/Polycab/Grandley/Glosterr/KEI make) |
| 89 | Supply and wiring of submain with 2 number 2.5 sqmm FRLSH PVC insulated single core multistranded copper conductor cable in existing conduit complete in all respects complete. |
| 90 | Providing operating cum maintenance staff of the entire street light network for routine maintenance of street lighting system, administrative, site office and staff colony etc including dismantling & re fixing of other street lights of UPSIDA with travelling expenses etc. (Electrician cum supervisor 01 nos, electrician 01 nos, helper 03 nos) |
| 91 | S&F of 6-32 amp. double pole MCB (10KA cat B) for control panel complete in all respects. |
| 92 | Painting letters (Pole No.) 2.5cm up to 8.0 cm size complete on Street light Pole/Panel/Other electrical properties under UPSIDA including cost of all material, men and T&P (To be done after 1 year) |
| 93 | Painting of electric pole with 2 coats of Aluminuim paint over red oxide primer of approved make alongwith providing AMC QR code complete in all respect (to be done after 1 year) |
| 94 | Trimming of tree branch around the street light pole/ST pole/Central Varge for proper illumination & proper disposal of tree branch collecting on trolley or similar moving item including cost of men, trolley, T&P etc. (1000 x 3 Year) |
| 95 | Strengthen of Other ST pole foundation by providing new concerting including cost of all material men and T&P. |
| 96 | Dismantling & re-grouting of street light/Steel tubler (upto 12 Mtr long) Tilt/sick bend pole in 1:3:6 ratio cement concrete with stone pad including strengthening of pole by providing additional 04 Nos. support of 65x65x6mm or higher size MS angle in suitable length with the help of welding/cutting as per technical specification. |
| 97 | Hiring Charge of 80-100 feet expandable street light repairing hydraulic lift, capacity 300 Kg including cost of operator, mounting vehicle and fuel etc. (8 Hrs x 4 day x 36 Month) |
| 98 | Cost of material spares, wire, fuse, small accessories, alum. lug upto 16 sqmm, small cable gland, insulation tap, plastic tie, screw, nut & bolts,old cloth, cleaning spray and other small associated required for up gradation work etc., Please Enable Macros to View BoQ information |