Bids Are Invited For Repair/Modification Of Pressure Tank 50 Mm Thick And Diameter Of 926Mm Includes:- (A) Induction Of Pressure Relief Valve Of (10-150 Bar) Range (B) Replacement Of M25 130Mm Bolt, Washer And Nuts (40) (C) Induction Of Air And, Mumbai-Maharashtra
TDR : 55128074
Tender Notice
BOQ
9 Days Left
Mumbai
Maharashtra
Bids Are invited for Repair/Modification of pressure tank 50 mm thick and diameter of 926mm includes:- (a) Induction of pressure Relief valve of (10-150 Bar) Range (b) Replacement of M25 130mm bolt, washer and nuts (40) (c) Induction of Air and
Repair/Modification of pressure tank 50 mm thick and diameter of 926mm includes:- (a) Induction of pressure Relief valve of (10-150 Bar) Range (b) Replacement of M25 130mm bolt, washer and nuts (40) (c) Induction of Air and water inlet valve (10-150 Bar) (d) Renewal of Entire system HP Gasket (10-150)(e) Induction of 100 mm dia HP cable inlet and outlet manifolds (10-150Bar)
Repair/Modification of pressure tank 50 mm thick and diameter of 926mm includes:- (a) Induction of pressure Relief valve of (10-150 Bar) Range (b) Replacement of M25 130mm bolt, washer and nuts (40) (c) Induction of Air and water inlet valve (10-150 Bar) (d) Renewal of Entire system HP Gasket (10-150)(e) Induction of 100 mm dia HP cable inlet and outlet manifolds (10-150Bar)
2
Replacement of HP variable cables threaded adapters (10-150 Bar) of various diameter 6,10,14,20,24,30,36 and 42 mm x 2 sets.
Replacement of HP variable cables threaded adapters (10-150 Bar) of various diameter 6,10,14,20,24,30,36 and 42 mm x 2 sets.
3
Automation of testing facility includes:- (a) Auto START/STOP pump for building pressure up to 90 Bar with a 3 HP motor (b) Laying of high-pressure waterline, pressure Gauges and control valves to control and monitor flow(c) Entire DOL starter setup from remote to execute the testing process for operator safety.
Automation of testing facility includes:- (a) Auto START/STOP pump for building pressure up to 90 Bar with a 3 HP motor (b) Laying of high-pressure waterline, pressure Gauges and control valves to control and monitor flow(c) Entire DOL starter setup from remote to execute the testing process for operator safety.
4
Construction of safety enclosure for isolating high pressure test facility for safety purpose
Construction of safety enclosure for isolating high pressure test facility for safety purpose
5
Final fitment, Commissioning, testing and proving the facility to the required pressure insitu practical demonstration.
Final fitment, Commissioning, testing and proving the facility to the required pressure insitu practical demonstration.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.