|
| 1 | Providing and laying boulders apron in river bed for protection against Scour with stone boulders weighing not less then 40 kg each complete as per drawing and technical specification. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 2 | Providing & fixing empty cement bags filled with local earth, hand sewing with suja & sutli and placing in position within 60m. Including cost of E.C.Bags, all labour, material and T&P required for proper completion fo work. SR No. 5.10(b) Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 3 | Earth work in cutting in Embankment in ordinnary so il excavation to be in the form of requler pits not exceding 0.50m in depth and earth work in embankment to be in 20cm. Layer including 1.50cm lift 30.m lead with cortege 8km dis tance i/c royalty 0/-m3 etc Sl. No.253 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR (2023) 5.2.2 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 5 | Providing and laying 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level DSR (2023) 4.1.6 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 6 | Brick work with Common burnt clay F.P.S (non modular) bricks of class in 1:4 one cement & four Coarse sand of 2.20 F.M mortar in foundation and plinth DSR 6.1.1 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars DSR (2023) 5.22.1 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 8 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete DSR 2023 10.15.1 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 9 | Add 18% GST Please Enable Macros to View BoQ information |