| 1 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Providing one Driven Earth using earth pipe of size 38.1mm dia2.5m length including digging separate pit at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP incl. conveyance of materials. |
| 4 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading charges |
| 5 | Fitting one Additional V cross arm in existing angle pole incl. conveyance of materials. |
| 6 | Fitting 6 channel cross arms, AB switch,DO fuse,Station class LA,HT & LT connections upto OH lines etc on existing DP structure,Fixing distribution box/provision for one set (3 No) of LT fuses,drawing sufficient lemgth of GI earthing leadsto the groubd for earthing excluding provision for earthing and mounting of transformer on poles |
| 7 | Renewal of existing damaged/old 11 kV PSC/RCC pole with new A type pole in place including excavation ,erection of new pole ,backfilling pit and refitting of all items etc and conveyance of all materials except pole |
| 8 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials |
| 9 | Fitting and erecting one HT Double pole structure using A type pole in position incl. fitting 2 No channel cross arm,digging & back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing) |
| 10 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 11 | Fitting and erecting one HT A type pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil (as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 12 | Fitting and erecting one HT PSC type pole in position incl. fitting cross arm, digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing),drawing earth leads |
| 13 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 14 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit in ordinary soil |
| 15 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the ground for earthing excluding provision for earthing |
| 16 | Drilling hole of various sizes on existing Channel/Cross arm |
| 17 | Fitting and providing one HT Fly stay for 11KV Pole using HT PSC pole incl. digging and back filling pit in ordinary soil drawing sufficient length of GI earth leads to the ground for earthing (excluding provision for earthing) |
| 18 | Fitting and providing one strut using HT PSC pole incl. digging and back filling pit in ordinary soil |
| 19 | Disconnectling and lowering down the Single phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 20 | Disconnectling and lowering down the three phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 21 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole |
| 22 | Additional rate for providing one Disc set PG clamp etc complete on any type of HT pole for making cut point |
| 23 | Provding WP support with PSC pole including digging & backfilling pit in ordinary soil excluding transportation of poles |
| 24 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 25 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 26 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc and stacking the same |
| 27 | Dismantling one Transformer (upto and including 160 kVA) from existing structure to ground ,including disconnewcting HT/LT/Earth connections |
| 28 | Cleaning and levelling of transformer yard /RMU spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick6 mm broken stone after constructing a curb wall of height 20 cm above groung and 10 cm below level including the cost of all materials and chargesfor coveying , spreading, consolidating etc |
| 29 | Erecting one 100 kVA Transformer to existing DP and giving connections including loading from TMR/SRS/other atacking places & unloading at aite excluding cost of transformer |
| 30 | Providing transformer fencing using steel work using 40 mm Dia GI pipes for verticals & outer frame of gate,providing gate with locking arrangements with two horizondal bracings using 40 x 6 mm MS flat & grills with MS rods 8 mm Dia @ 10 cm c/c for verticals for the gate providing danger board & name board,fixing in position ,concreting the base with 1:2:4 CC ,applying one coat of zinc chromate primer and two coats of aluminium paint for fencing post and gate frame ,providing fencing with 4mm GI chain linkfixed to GI post,as per detailed specifications including all charges |
| 31 | Providing concrete muffing (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 32 | Stringing of one km 3 ph 11 kV line with XLPE insulated ACSR Racoon or equivalent ( 3 conductors) after fitting insulators ,binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree brancxhes whereever necessary excluding cut points |
| 33 | Transferring LT 3 ph 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 34 | Transferring LT single ph 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 35 | Fitting one additional fuse unit and giving connection from transformer to fuse and Distribution box to LT OH line Please Enable Macros to View BoQ information |