|
| 1 | Disconnecting the three phase power supply system from the starter of panel board and taking out defective submersible pump motor set 3 phase along with taking out / removing of column pipes and cable carefully and carryout with transporting to work shop for repairing purposed, after repairing/ rewinding of the submersible pump motor set, jointing of cableing work and re-assembling the pump motor sytem complete and relowering in the same position of well with the help of jointing / fixing of column pipe, cable and including providing of suitable size / type of rubber joint gasket along with replacement of defected nut & bolt etc after making submersible cabling joint connection and connected with three phase power supply starter system including checking and testing of fault and rectification of fault from existing starter system complete and testing the pump motor set on load complete all as specified & directed for the following capacity/rating :- |
| 2 | 7.5hp/10 hp |
| 3 | 15 hp |
| 4 | 20 hp - 22 hp |
| 5 | 25 hp - 30 hp |
| 6 | 41 hp |
| 7 | NOTE:- Replacement of unserviceable items/parts shall be measured & Paid for separately under respective items of BOQ. |
| 8 | Opening/ dismantling and taking out old unserviceable burnt out winding matrerial/ defected parts from the existing submersible electric motor system of suitable capacity including providing re-winding materials with water proof copper insulated wire all as existing gauge / size / type including it connecting winding jointing material and including repair / replacement of other connected minor defected burnt out parts of motor and after reassembling it testing of system and carryout with transporting from work shop to site complete all as specified & directed for the following capacity/rating :- |
| 9 | 7.5 hp/10 hp 3 phase 415 Volt |
| 10 | 15 hp, 3 phase,415 Volt |
| 11 | 20 hp - 22 hp, 3 phase, 415 Volt |
| 12 | 25 hp-30 hp, 3 phase, 415 Volt |
| 13 | 41 hp, 3 phase, 415 Volt |
| 14 | NOTE:- Replacement of unserviceable items/parts shall be measured & Paid for separately under respective items of BoQ. |
| 15 | Replacement of unserviceable spares parts with new parts as per existing sample/size/ make for the existing pumps/ motors complete for the following: - |
| 16 | Thrust plate with thrust bearing suitable using for 10/15hp 3 phase submersible pump motor system. |
| 17 | Thrust plate with thrust bearing suitable using for 20/22hp 3 phase submersible pump motor system. |
| 18 | Thrust plate with thrust bearing suitable using for 25/30hp 3 phase submersible pump motor system. |
| 19 | Thrust plate with thrust bearing suitable using for 41hp 3 phase submersible pump motor system. |
| 20 | Bush suitable using for 10hp / 15hp 3 phase submersible pump motor system. |
| 21 | Bush suitable using for 20hp/ 22hp 3 phase submersible pump motor system. |
| 22 | Bush suitable using for 25hp / 30hp 3 phase submersible pump motor system. |
| 23 | Bush suitable using for 41hp 3 phase submersible pump motor system. |
| 24 | SS Sleeve suitable using for 10/15hp 3 phase submersible pump motor system. |
| 25 | SS Sleeve suitable using for 20/22hp 3 phase submersible pump motor system. |
| 26 | SS Sleeve suitable using for 25/30hp 3 phase submersible pump motor system. |
| 27 | SS Sleeve suitable using for 41hp 3 phase submersible pump motor system. |
| 28 | Neck ring suitable using for 10/15hp 3 phase submersible pump motor system. |
| 29 | Neck ring suitable using for 20/22hp 3 phase submersible pump motor system. |
| 30 | Neck ring suitable using for 25/30hp 3 phase submersible pump motor system. |
| 31 | Neck ring suitable using for 41hp 3 phase submersible pump motor system. |
| 32 | Impeller suitable using for 10/15 hp 3 phase submersible pump motor system. |
| 33 | Impellersuitable using for 20/22 hp 3 phase submersible pump motor system. |
| 34 | Impeller suitable using for 25/30 hp 3 phase submersible pump motor system. |
| 35 | Impeller suitable using for 41 hp 3 phase submersible pump motor system. |
| 36 | SS Shaft suitable using for 10/15 hp 3 phase submersible pump motor system. |
| 37 | SS Shaft suitable using for 20/22 hp 3 phase submersible pump motor system. |
| 38 | SS Shaft suitable using for 25/30 hp 3 phase submersible pump motor system. |
| 39 | SS Shaft suitable using for 41 hp 3 phase submersible pump motor system. |
| 40 | Disconnecting the three phase power supply system from the starter of panel board and taking out defective non clog sewage/centrifugal type pump motor set of capacity 3hp to 5hp 3 phase carefully and carry out with transporting to work shop for repairing / rewinding purposed and taking out the burnt out winding from motor and rewinding with new one super enameled copper wire of existing size / gauge including provding with, insulation , varnishing, hardner etc material after re-assembling the centrifugal pump motor set complete and refixing in the same position of system and including providing of suitable size / type of of defected nut & bolt etc and making cabling connection with three phase power supply starter system including checking and testing of fault and rectification of fault from existing starter complete and testing the pump motor set on load complete as specified & directed. NOTE :- Replacement of unserviceable items/parts shall be measured & Paid for separately under respective items of BOQ. |
| 41 | Disconnecting the three phase power supply system from the starter of panel board and taking out defective non clog sewage/centrifugal type pump motor set of capacity 7.5hp to 10hp 3 phase carefully and carry out with transporting to work shop for repairing / rewinding purposed and taking out the burnt out winding from motor and rewinding with new one super enameled copper wire of existing size / gauge including provding with, insulation , varnishing, hardner etc material after re-assembling the centrifugal pump motor set complete and refixing in the same position of system and including providing of suitable size / type of of defected nut & bolt etc and making cabling connection with three phase power supply starter system including checking and testing of fault and rectification of fault from existing starter complete and testing the pump motor set on load complete as specified & directed. NOTE :- Replacement of unserviceable items/parts shall be measured & Paid for separately under respective items of BOQ. |
| 42 | Disconnecting the three phase power supply system from the starter of panel board and taking out defective centrifugal type pump motor set of capacity 20hp to 30hp 3 phase carefully and carry out with transporting to work shop for repairing / rewinding purposed and taking out the burnt out winding from motor and rewinding with new one super enameled copper wire of existing size / gauge including provding with, insulation , varnishing, hardner etc material after re-assembling the centrifugal pump motor set complete and refixing in the same position of system and including providing of suitable size / type of of defected nut & bolt etc and making cabling connection with three phase power supply starter system including checking and testing of fault and rectification of fault from existing starter complete and testing the pump motor set on load complete as specified & directed. NOTE:- Replacement of unserviceable items/parts shall be measured & Paid for separately under respective items of BoQ. |
| 43 | Disconnecting the three phase power supply system from the starter of panel board and taking out defective centrifugal type pump motor set of capacity 40hp to 50hp 3 phase carefully and carry out with transporting to work shop for repairing / rewinding purposed and taking out the burnt out winding from motor and rewinding with new one super enameled copper wire of existing size / gauge including provding with, insulation , varnishing, hardner etc material after re-assembling the centrifugal pump motor set complete and refixing in the same position of system and including providing of suitable size / type of of defected nut & bolt etc and making cabling connection with three phase power supply starter system including checking and testing of fault and rectification of fault from existing starter complete and testing the pump motor set on load complete as specified & directed. NOTE :- Replacement of unserviceable items/parts shall be measured & Paid for separately under respective items of BOQ. |
| 44 | Replacement of unserviceable spare parts with new parts as per existing sample/size/make for the existing motors/ pumps complete for the following :- |
| 45 | Ball bearing suitable for 3 hp/ 10 hp pump/motor |
| 46 | Ball bearing suitable for 20 hp/ 30 hp pump/motor |
| 47 | Ball bearing suitable for 40 hp/ 50 hp pump/motor |
| 48 | Coupling for 3.0 hp /10 hp pump/motor |
| 49 | Coupling for 20 hp /30 hp pump/motor |
| 50 | Coupling for 40 hp /50 hp pump/motor |
| 51 | Impeller suitable for 7.5 hp/10 hp pump/motor |
| 52 | Impeller suitable for 20 hp/30 hp pump/motor |
| 53 | Impeller suitable for 40 hp/50 hp pump/motor |
| 54 | M&L for Servicing of fire pump driven horizontal centrifugal pump set of capacity 49 Kw /65 hp, RPM-2000, 4 cylinder, type- 4R, rating 130-3046, head 70 metre, discharge 137 Cubic/ hour and size 125x 80mm including replacement of engine oil, fuel filtert, air filter and oil filter to the entire satisfaction of Engineer-in-Charge , completeNOTE :- Replacement of unserviceable items/parts shall be measured & Paid for separately under respective items of BOQ. |
| 55 | Replacement of unserviceable spare parts with new parts as per existing sample/ size/ make for the existing diesel pumps complete, for the following: |
| 56 | Engine oil servo premium 20W/40 |
| 57 | Diesel and lubricant oil fiter kit complete set with all accessories of capacity 62.5 KVA |
| 58 | Fuel filter pipe |
| 59 | Air filter |
| 60 | Opening up stuffing box of cast iron sluice valve in position and replacement of gland packing, nuts, bolts and washer etc complete for the following size :- |
| 61 | 80 mm bore |
| 62 | 100 mm bore |
| 63 | 150mm bore |
| 64 | 200mm bore |
| 65 | S&F, Maintnance free battery with initially charged 12 volt , 150 AH with 24 months warrenty IN REPLACEMENT complete all as specified and directed. |
| 66 | S&F, DOL motor starter in sheet steel enclosure 3 phase 415 V 50 HZ relay max range 9 Amp to 15 Amp, Max 15 Amp load, MN16 DOL type starter, IN REPLACEMENT, complete all as specified and directed.MAKE:- L&T Cat part No-SS94351 or equivalent as described in Appendix 'B'. |
| 67 | S&F, DOL motor starter in sheet steel enclosure 3 phase 415 V 50 HZ relay max range 20 Amp to 33 Amp, Max 15 Amp load, MN32 DOL type starter, IN REPLACEMENT, complete all as specified and directed.MAKE:- L&T Cat part No-SS94353 or equivalent as described in Appendix 'B'. |
| 68 | S&F, Fully automatic star delta motor starter in sheet steel enclosure 3 phase 415 V 50 HZ relay max range 45 Amp to 75 Amp, Max 100 Amp load, ML4 FASD type starter, IN REPLACEMENT, complete all as specified and directed.MAKE:- L&T Cat part No-SS90913 or equivalent as described in Appendix 'B'. |
| 69 | S&F, Fully automatic star delta motor starter in sheet steel enclosure 3 phase 415 V 50 HZ relay max range 28 Amp to 42 Amp Max 100 Amp load , ML3F FASD type starter IN REPLACEMENT, complete all as specified and directed.MAKE:- L&T Cat part No-SS90730 complete or equivalent as described in Appendix 'B'. |
| 70 | Dismantling and taking out existing non-clog sewage / under ground pump set/centrifugal pump from foundation including disconnecting all connections and transporting the same to workshop for purposed repairing, taking out the burnt out defected pump parts like, overhauling including shaft metaling, welding and grinding the shaft and replacing of all worn out/defective parts of pumps and making it in properly serviceable condition and re-assembling at site including refixing & reconnecting the same on original position complete all as specified & directed for the following capacity/rating :- |
| 71 | 2 hp, 3 phase |
| 72 | 5 hp, 3 phase |
| 73 | 7.5/ 10 hp, 3 phase |
| 74 | 20hp, 3 phase |
| 75 | 30hp, 3 phase |
| 76 | NOTE :- Replacement of unserviceable items/parts shall be measured & Paid for separately under respective items of BOQ. |
| 77 | Replacement of unserviceable items/parts with new items/parts as per existing sample size and make for the non clog sewage pumps as under: - |
| 78 | Ball bearing for 2 hp non - clog pumping set. |
| 79 | Ball bearing for 5 hp non - clog pumping set. |
| 80 | Ball bearing for 7.5/ 10 hp non - clog pumping set. |
| 81 | Ball bearing for 20 hp non - clog pumping set. |
| 82 | Mild steel coupling with nuts and bolts suitable for 2 hp non clog pumping set. |
| 83 | Mild steel coupling with nuts and bolts suitable for 5 hp non clog pumping set. |
| 84 | Mild steel coupling with nuts and bolts suitable for 7.5/ 10 hp non clog pumping set. |
| 85 | Mild steel coupling with nuts and bolts suitable for 20/30 hp non clog pumping set. |
| 86 | Disconnecting the power supply system and taking out defective burnt out mono block electric pump motor from the foundation carefully and carry out with transporting to work shop for repairing / rewinding of pump and motar purposed and taking out the burnt out winding from motor and rewinding with new one super enameled copper wire of existing size / guage including providing with, insulation , varnishing, hardner etc material including overhauling of shaft metaling grinding and replacing of worn out defected parts of pump set after re-assembling the monoblock pump & motor set complete and refixing in the same position of system and including providing of suitable size / type of defected nut & bolt etc and making cabling connection with power supply system complete and testing the pump motor set on load complete all as specified & directed for the following capacity/rating :- |
| 87 | 0.75hp/1 hp |
| 88 | 1.5hp/2 hp |
| 89 | NOTE :- The unit rate shall be include for minor spares parts such as bolts, nuts wahers, oil seal, gasket, oiling, greasing, fans etc as required seviceable for pump. |
| 90 | NOTE FOR SERAL ITEM 1 to 19 :- Not withstanding with the provision of \\"Compensation for Delay' envisaged under condition 50 of IAFW-2249, General Conditions of Contracts, additional compensation @ Rs. 500/- day will be charged from contractor in case he fails to make the functional to the entire satisfaction of Engineer-in-Charge within 24 hour of receiving of complaint from the MES regarding non working above items. |
| 91 | S&F, PVC insulated and PVC sheathed three core submersible flat cable multi stranded copper conductor wire 1100 volt grade suitable for operation of submersible pump motor set IN REPLACEMENT complete all as specified & directed for the following size:- |
| 92 | 4 Sq. mm |
| 93 | 6 Sq. mm |
| 94 | 10 Sq. mm |
| 95 | 16 Sq. mm |
| 96 | S&F, Power contactor, 3 pole, 415 volt AC ML2 type with NO & NC Aux contracts IN REPLACEMENT complete.MAKE :- L&T Cat part No-SS90701 or equivalent make as described in Appendix 'B'. |
| 97 | S&F, Power contactor, 3 pole, 415 volt AC ML3 type with NO&NC Aux contracts IN REPLACEMENT complete. MAKE:- L&T Cat part No-SS90721 or equivalent make as described in Appendix 'B'. |
| 98 | S&F, Power contactor, 3 pole, 415 volt AC ML4 type with NO&NC Aux contracts IN REPLACEMENT complete.MAKE:- L&T Cat part No-SS90910 or equivalent make as described in Appendix 'B'. |
| 99 | S&F, Directly operated over load relay of rating capacity 20 to 32 Amp IN REPLACEMENT complete.MAKE:- L&T Cat part No-SS9185900E0 or equivalent make as described in Appendix 'B'. |
| 100 | S&F, Directly operated over load relay of rating capacity 28 to 42 Amp IN REPLACEMENT complete.MAKE:- L&T Cat part No-SS9185900F0 or equivalent make as described in Appendix 'B'. |
| 101 | S&F, Directly operated over load relay of rating capacity 66 to 110 Amp IN REPLACEMENT complete.MAKE:- L&T Cat part No-SS9413700K0 or equivalent make as described in Appendix 'B'. |
| 102 | S&F, Star Delta electronic timer 3 to 30 second rating, IN REPLACEMENT complete.MAKE:- L&T Cat part No-ST803280000 or equivalent make as described in Appendix 'B'. |
| 103 | S&F, Single phase preventer VSP 2/ VSP 3 type, IN REPLACEMENT complete. |
| 104 | S&F, GI column pipe, heavy duty as per existing sample including duly fixed flanges with hole for both ends and slot made for submersible cable complete all as specified & directed for the following size :- |
| 105 | 40 mm bore, 10 feet long |
| 106 | 80 mm bore, 10 feet long |
| 107 | 100 mm bore, 10 feet long |
| 108 | S&F, MCCB TP 100 Amps, 415 Volts , 50 Hz , 16 KA adjustable thermal release range including all connections and testing IN REPAIRS, complate all as specified and directed. |
| 109 | S&F, MCCB TP 125 Amp, 415 Volts ,50 Hz , 16 KA adjustable thermal release range including all connections and testing IN REPAIRS, complate all as specified and directed. |
| 110 | S&F, MCCB TP 160 Amp, 415 Volts ,50 Hz , 36 KA adjustable thermal release range including all connections and testing IN REPAIRS, complate all as specified and directed |
| 111 | S&F, Digital Amp meter 0-200 amp, WL-1110, 3phase for existing panel, IN REPAIRS complete all as specied and directed. |
| 112 | S&F, Digital volt meter 0-500 Volts, WL-1120, 3phase for existing panel, IN REPAIRS complete all as specied and directed. |
| 113 | S&F, Indicating pilot lamp complete with base element with and lamp 240 V AC 50 C/s and connecting up IN REPLACEMENT complete all as specied and directed |
| 114 | M&L for Earthing IN REPLACEMENT complete with galvanised iron earth plate electrode of size 600 x 600 x 6 mm buried directly in ground (earth pit not less than 2.25 mtr deep below ground level ) with top edge of the plate not less than 1.5 metre below normal ground level, connected to and including GI strip 32x6 mm (upto the cross arms) by means of GI bolts/nuts/washers, protected by 40 mm bore GI medium grade pipe. Earth plate shall be surrounded by alternate layer of charcoal or coke and common salt 15 cm thick all around bottom and top. 20 mm bore GI light grade pipe for watering and including funnel, wire mesh, factory made PCC earthing pit chamber & cover including necessary excavation & earth work, all as specified & shown in electrical plate No. 3 of MES Schedule Part – I.NOTE:- (i) Factory made PCC pit chamber shall be provided at least 1.5 metre away from the earth electrode and pipe for watering shall be provided in slanting manner. (ii) The unit rate includes earthing lead & protection pipe upto 7.5 metre from top of earth plate. |
| 115 | Note : Amount of credit for retrieved materials is mentioned in Sch 'A' Section-II of tender documents in pdf form which will be deducted while acceptance of tender offline. Please Enable Macros to View BoQ information |