|
| 1 | Supply Item |
| 2 | 33 KV VCB CLAMPSFOR PANTHER(As per Specification of RESPO & UPCL) |
| 3 | 33 KV L.A CLAMPSFOR PANTHER(As per Specification of RESPO & UPCL) |
| 4 | PT Clamp for Panther Conductor(As per Specification of RESPO & UPCL) |
| 5 | 33KV CT CLAMP FOR PANTHER WITH N&B(As per Specification of RESPO & UPCL) |
| 6 | PG CLAMP ALU ALLOY PANTHER TO PANTHER(As per Specification of RESPO & UPCL) |
| 7 | ISOLATOR CLAMP FOR ACSR PANTHER(As per Specification of RESPO & UPCL) |
| 8 | 70 WATT LED WITH ALL ACCESSORIES |
| 9 | Control Cables of size 4x2.5sq.mm.(As per Specification of RESPO & UPCL) |
| 10 | Control Cable 10x2.5 sqmm-D(As per Specification of RESPO & UPCL) |
| 11 | 24 V BATTERY SET |
| 12 | 24V BATTERY CHARGER |
| 13 | GI Strip size 35x6mm(As per Specification of RESPO & UPCL) |
| 14 | RUBBER MAT(INSULATED )1MX1MX3MM |
| 15 | Line Work |
| 16 | CLEANING, DRESSING & LABLINGSWITCH YARD |
| 17 | REPAIRING OF PLINTH |
| 18 | EXCAVATION OF TRENCH IN ALL SOIL |
| 19 | CEMENT PLASTER WORK |
| 20 | MAKING FOUND. & CABLE TRENCH990KVA CSS |
| 21 | SPREADING & LEVELLING OF GRITTFOR YARD |
| 22 | DPC WORK ON TOP SIDE |
| 23 | MAKING CABLE TRENCH |
| 24 | BRICK WORK 1:6 SUPER STRUCTURE |
| 25 | SPECIAL EARTHING |
| 26 | CHEMICAL EARTHING |
| 27 | DISMANTLING OF PANELS |
| 28 | CEMENT PLASTER ON DTR PLINTH |
| 29 | LAYING OF PANTHER CONDUCTOR INHT LINE |
| 30 | CONST.,INST.OF DANGER BOARD/NUMBER PLATE |
| 31 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 32 | CARTAGE OF 33KV PANELS, 151-200KM |
| 33 | MANUAL SHIFTING OF CONTROLPANEL |
| 34 | RE-ERECTION OF FENCING/GATE |
| 35 | FABRICATION OF STEEL FORSTRUCTURE |
| 36 | GROUTING OF STRUCTURE IN CC 1:3:6 |
| 37 | ERECTION CHARGES OF STRUCTURE |
| 38 | LAYING OF U/G 11 KVCABLE(TRENCHLESS) |
| 39 | BACK CARTAGE OF PETTYMATERIAL,0-20 KM |
| 40 | TESTING OF 33 KV VCB |
| 41 | CARTAGE OF 33 KV VCB |
| 42 | ERECTION OF 33 KV VCB |
| 43 | EARTH STRIP 50X6 FOR EARTHING OFPANNEL |
| 44 | LAYING OF (2.5*4) CONTROL CABLE |
| 45 | EARTHING OF STRUCTURE USING GISTRIP |
| 46 | REPAIRING & OVERHAULING C&RPANEL & VCB |
| 47 | ERECTION OF 33KV CONTROL PANEL |
| 48 | RCC FOUNDATION WORK FOR 16 MHIGH MAST |
| 49 | EXCAVATION OF PIT FOR EARTHING |
| 50 | SUPPLY & FABRICATION OF MS ANGLE50X50MM |
| 51 | FIXING OF 33 KV LIGHTNINGARRESTOR |
| 52 | MANNUAL SHIFTING 33KV CR-PTCOMB. UNIT |
| 53 | CUTTING OF WILD GRASS ANDBUSHES |
| 54 | PAINTING OF MS BAR |
| 55 | PAINTING OF ISOLATOR/LA/CT/STRUCTURE Please Enable Macros to View BoQ information |