|
| 1 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of ngineer-incharge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). |
| 2 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). All works upto plinth level |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings,balconies and access platform 5.9.3 |
| 4 | Centering and shuttering including strutting, propping etc.Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(5.9.2) |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500 D or more. |
| 6 | Brick work with Common Brunt clay F.P.S( Non-modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement :4 coarse sand) |
| 7 | 12 mm cement plaster of mix:1:4 (1 cement: 4 coarse sand) |
| 8 | Neat cement punning |
| 9 | Fabrication & Manufacturing of Prestressed hollow core slab (Hollow area 25 to 30%) of different thickness & modular width 1200mm in controlled factory environment with approved methodology confirming to IS 10297:1982 by using long line casting method having arrangement of proper steel bed. Concreting should be done by batch mixing planbt capable of producing zero slump concrete transported through automatic, shuttels of standard make & layed on bed with the help of extruder/slopformer, finishing curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in slab element after achieving required strength, Yard handling & stacking all complete as per approved shop drawings & design mix as per the direction of the engineer-in-charge.(cost of strands should be paid separately). Note Excess/less cement over the specified cement content used as per design mix is payable/recoverable separately) Including steel & transport charge 150mm thick hollow core slab. |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works Please Enable Macros to View BoQ information |