| 1 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads. Transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300-2: lead upto of 10.00KM (MORTH--20/305/3.18) |
| 2 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). (DSR-18/16.2) |
| 3 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.(DSR-18/11.2) |
| 4 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 5 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 6 | Providing and laying 80mm thick ISI mark Factory made cement concrete interlocking Paver block made by block making machine with strong vibratory compaction of approved size, Zig Zag shape, laid in grey colour of M-40 and pattern over and including average 50mm compacted bed and fine sand and filling the joints with fine sand all complete as per direction of engineer-in-charge with GNIDA/A.R. |
| 7 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR-20/251 (A)/4.1.1) |
| 8 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 9 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 10 | M-150 brick work in 1:4 cement & fine sand 2.20 FM mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of the work. (SOR-20/303) same as item no 303 but in 1:4 one cement & four fine sand of 1.25 F.M. mortar. (SOR-20/305)Same as item no 305 but in 1:4 one cement & four coarse sand of 2.20 F.M. mortar. (SOR-20/305(A)) |
| 11 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/279)Same as above item no 279 but with 2cm gauge stone grit instead of 4cm gauge stone ballast. (SOR-20/279(a) |
| 12 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) (DSR-18/13.4.2) |
| 13 | Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/E/Case-II) |
| 14 | RCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20/9.06/E/Case-II) |
| 15 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (DSR-18/5.22) |
| 16 | Thermo Mechanically treated bars of grade Fe-500D or more. (SAIL Steel) (DSR-18/5.22.6/AR) |
| 17 | 2 cm thick Damp proof Course with Cement and approved coarse sand 1:2 with and including water proofing as ordered by the Engineer in-charge in the proportion as by the manufacture including supply of all materials, labour, Tools & plants etc. required for proper completion of the work and including proper curing & Shutterings as necessary. (SOR-20/7.01/360) |
| 18 | Labour cess and GST will be paid extra as per Govt. orders. Please Enable Macros to View BoQ information |