| 1 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR-20/251 (A)/4.1.1) |
| 2 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 3 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 4 | Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/E/Case-II) |
| 5 | RCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20/9.06/E/Case-II) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (DSR-18/5.22) |
| 7 | Thermo Mechanically treated bars of grade Fe-500D or more. (SAIL Steel) (DSR-18/5.22.6/AR) |
| 8 | M-150 brick work in 1:4 cement & fine sand 2.20 FM mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of the work. (SOR-20/303) same as item no 303 but in 1:4 one cement & four fine sand of 1.25 F.M. mortar. (SOR-20/305)Same as item no 305 but in 1:4 one cement & four coarse sand of 2.20 F.M. mortar. (SOR-20/305(A)) |
| 9 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/279)Same as above item no 279 but with 2cm gauge stone grit instead of 4cm gauge stone ballast. (SOR-20/279(a) |
| 10 | M-150 brick work in 1:6 cement & fine sand 1.25 FM mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of the work. (SOR-20/303/6.02)Same as item no. 303 but in 1:4 one cement & four fine sand of 1.25 F.M. mortar. (SOR-305/6.04)Same as item no 305 but in 1:4 one cement & four coarse sand of 2.20 F.M. mortar. (SOR-20/305(a))As item 303 to 307 above but in superstructure including necessary Cutting & moulding of brick as required thickness of wall not to be less than 1½ brick. Add extra labour to above items. (SOR-20/309/6.07) |
| 11 | 15 mm cement plaster on rough side of single or half brick wall of mix: 1:6 (1 cement: 6 coarse sand) (DSR-18/13.5.2) |
| 12 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) (DSR-18/13.4.2) |
| 13 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar. (DSR-18/15.7.4) |
| 14 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.: For thickness of tiles 10 mm to 25 mm (DSR-18/15.23.1) |
| 15 | Providing wall putty on new surface with approved quality material of Berger/J.K./Birla or similar make 2 coats.(SOR-20/662 New Item) |
| 16 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. On concrete work (DSR-18/13.52.2) |
| 17 | Distempering with 1st quality acrylic distemper, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour.: Two coats. (DSR-18/13.81.2) |
| 18 | Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc. consisting of following operations:(a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. |
| 19 | (b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs.(c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge. |
| 20 | (d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep.(e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge : |
| 21 | With average thickness of 120 mm and minimum thickness at khurra as 65 mm. (DSR-18/22.7.1) |
| 22 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (DSR-18/10.25) |
| 23 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (DSR-18/10.25.2) |
| 24 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. (DSR-18/11.36/AR) |
| 25 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. : Size of Tile 600x600 mm (DSR-18/11.41.2) |
| 26 | Painting roofs or other iron work in large areas with one coat priming and one coat of approved (above one Sq. Metre) paint (British antesol or equivalent) including supply of all materials, labour, Tools & plants etc. required for proper complection of the work. paint to be used should confirm the ISI no 103-109. (SOR-2020/644)As in item (644) above but for every coat after the first coat. (SOR-20/644+645) |
| 27 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. (DSR-18/16.83) |
| 28 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 29 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 30 | Providing and laying 60mm Thick ISI mark factory made Cement Concrete interlocking paver block made by block making machine with strong vibratory compaction of approved size, design, shape, laid in required coloured of M-35 & pattern over and including averege 50mm Thick Compacted bed fine sand and filling the joints with fine sand all complete as per direction of engineer-in-charge with conforming to ISI-15658 & IRC:SP:63 (DSR-18/16.68/GNIDA/AR) |
| 31 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. (DSR-18/16.1) |
| 32 | Granular sub-base with graded material, plant mix method Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. MORTH/4.01/401(A) |
| 33 | Excavation in soil using hydraulic excavator and Tippers with disposal upto 1.0Km.Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and Cross section and transporting to the embankment location with all lefts and lead up to 4.0Km (MORTH-20/3.06/301) |
| 34 | Theme painting on primary school on wall with artistic acrylic colour with pu coating, Design/pattern approved by engineer-in-charge, including scaffolding etc. all complete, (AR/GNIDA) |
| 35 | Labour cess and GST will be paid extra as per Govt. orders. Please Enable Macros to View BoQ information |