| 1 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 2 | Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer in-charge. (Old CC paver blocks and coarse sand shall be supplied by the department free of cost). |
| 3 | Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. Note: Payment shall be made only after submission of C&D waste paver block vouchers. |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm |
| 5 | Chequerred precast cement concrete tiles 22 mm thick in footpath &courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Ordinary cement without any pigment. |
| 6 | Providing and laying tactile tile (for vision impaired persons as per standards) of yellow colour having size 300x300x25 mm in footpath & courtyard jointed with neat cement slurry mixed with pigment to match the shade of tile, including rubbing and cleaning etc. complete on 20mm thick base of cement mortar 1:4(1 cement : 4 coarse sand) as per direction of Engineer-in-charge. |
| 7 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 8 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost). |
| 9 | Providing and laying at or near ground level factory made kerb stone of C&D of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). Note: Payment shall be made only after submission of C&D waste kerb stone vouchers. |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. One or more coats on old work |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. |
| 12 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) ) |
| 13 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-iii) including manufactured sand derived from recycled concrete Aggregate (RCA) upto 25% : 4 graded stone aggregate 20 mm nominal size including recycled concrete Aggregate (RCA) upto 25%). |
| 14 | Cold milling of existing bituminous layer as per direction of Engineer-in-charge by milling machine to make uniform surface with required slope/camber without disturbing the base layer, cleaning the surface after cold milling, removable/cleaning/brooming of the surface and removing left out material, loading the milled material into tippers and removing/disposal to hot mix plant or any other approved dumping location including loading unloading, all leads lifts and etc. all completes as per directions Engineer in Charge. Manual milling will be permissible only with the approval of Engineer-in-Charge, where mechanical milling is not possible. Any camber correction, if required in the pavement should be taken care of during milling only and nothing extra will be payable on this account. Area and laid compacted thickness shall be measure for calculating volume of bituminous layer on the basis of level. |
| 15 | Credit for salvage value of the milled bituminous concrete material received from cold milling shall be taken over and will be the property of removed from the site by the contractor as per direction of Engineer-in-charge. Area and laid compacted thickness shall be measure for claculating volume of Bituminous layer on basis of level. |
| 16 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 17 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With rapid setting bitumen emulsion on W.B.M / W.M.M. @ 0.4kg/sqm |
| 18 | Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. |
| 19 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With rapid setting bitumen emulsion. On bituminous surface @ 0.25kg/sqm. |
| 20 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. a) 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. |
| 21 | Providing, laying and making kerb channel 30 cm wide and 50 mm thick with cement concrete 1:3:6 (1 cement: 3 coarse sand:6 graded stone aggregate 20 mm nominal size) over 75 mm bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth etc. complete and as per direction of Engineer-in-charge. |
| 22 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 250 mm dia. R.C.C. pipe |
| 23 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semiautomatic thermoplastic paint applicator machine fitted with profile shoe,glass beads dispenser, propane tank heater and profile shoe heater,driven by experienced operator on road surface including cost of material,labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer in-charge and accordance with applicable specifications. |
| 24 | Providing and fixing Glow studs of size 100x20 mm made of heavy duty body shall be moulded ASA (Acrylic styrene Acryloretrite ) or HIP (High impact polystyrene) or ABS having electronically welded micro- prismatic lens with abrasion resistant coating as approved by Engineer in charge. The glow stud shall support a load of 13635 kg tested in accordance with ASTM D4280. The slope of retro- reflective surface shall be 35 (+/-5) degress to base .The reflective panels on both sides with at least 12 cm of reflective area up each side. The luminance intensity should be as per the specification and shall be tested as described in ASTM I: 809 as recommended in BS: 873 part 4 : 1973. The studs shall be fixed to the Road surface using the adhesive conforming to IS, as per procedure recommended by the manufacturer complete and as per direction of Engineer-in-charge. |
| 25 | Providing and fixing of solar raised pavement markers i.e. solar studs made of aluminium molded body, solar powered, LED self illumination in active mode, 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode. the product shall support a load of 13635 kg tested in accordance to MORTH and ASTM D 4280 Type H. The product should be resistant to water ingress according to IP65 standards with IS 12063:1987 Category 2 and should withstand temperatures in the range of 07 C to 70c. Flashing rate and colour of lighting is to be provided as per requirement. There should be minimum current losses of less than 20 micro-amperes in sleep-charging mode to enhance product life and single charge should provide for a minimum autonomy of 50 hours. The height, width and length shall not be less than 10mm x 100mm x 100mm. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. Warranty certificate and test reports confirming to compressive strength as per MORTH circular shall be obtained from the manufacturer and submitted to the engineer-in-charge. Two years warranty certificate for solar RPM for the quantity installed and a certified copy of test reports from an independent test laboratory confirming to water ingress shall be obtained from the manfacturer by the contractor and submitted to the Engineer-in-charge. |
| 26 | Providing and placing in position 100 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 100 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. |
| 27 | Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality HD 20 Circular shape 560 mm internal dia. |
| 28 | Providing and fixing in position pre-cast R.C.C. manhole cover and without frame of required shape and approved quality HD 20 Circular shape 560 mm internal dia. |
| 29 | Providing and Fixing Cylindrical Bollard 200mm (Top Dia) x 200 mm (Bottom Dia) x 950 mm height manufactured by using M-30 grade of concrete, reinforced (5 nos longitudinal, 5 nos ring of 8 mm dia TOR steel) using vibro compaction process including necessary excavation and cement concrete as per direction of Engineer-in-charge. |
| 30 | Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in-charge. |
| 31 | Providing and laying design mix cement concrete of M-40 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants i/c P/L separation membrane of impermeable plastic sheet 125 micron thick, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Minimum Cement content considered in M-40 is @ 400 kg/cum. Extra cement used than specified minimum cement content is not payable whereas recovery shall be affected for less cement used than specified minimum cement content. Cement concrete manufactured in automatic batching plant (RMC plant) i/c transportation to site in transit mixer. |
| 32 | Providing and fixing pre-moulded joint filler in expansion joints of RCC roads / CC pavements after making the joints dust free with high pressure air jet cleaners, all complete as per direction of the Engineer-in-Charge. (Pre-moulded joint fillers shall be made of bitumen hot sealing compound impregnated fibre board having impregnation more than 35%, conforming to IS:1838 for fibre board and IS: 1834 for hot sealing bitumen compound grade A.) |
| 33 | Disposal of Excavated Earth/ building rubbish /malba / similar unserviceable, dismantled or waste materials by mechanical means i/c loading, transporting, unloading to C&D waste plant at Burari/shastri Park/Bakkarwala or any other approved municipal dumping ground or as approved by Engineer-in-charge beyond 50 m initial lead, for all leads including all lifts involved. Charges borne by agency on account of disposal at C& D waste plant shall be reimbursed by the department on actual basis after the submission of receipt of the municipal plant by the contractor etc. all complete as per direction of Engineer-in-charge. |
| 34 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 35 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per 1S: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note:- Minimum Cement content considered in M-30 is @ 350 kg/cum. Extra cement used than specified minimum cement content is not payable whereas recovery shall be affected for less cement used than specified minimum cement content. All works upto plinth level Concrete of M30 grade with minimum cement content of 350 kg /cum |
| 36 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 37 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform |
| 38 | Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls: Under 20 cm wide |
| 39 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 40 | Deduction for taken away the userviceable steel bars (Scraps) received from dismantling of RCC works all as per direction of Engineer-in-charge. |
| 41 | Total after GST Correction Factor @ 0.973= 105832716.11 |
| 42 | Cost Index @ -0.09% Please Enable Macros to View BoQ information |