|
| 1 | Erection Part of 11/0.4 KV, 63 KVA Transformer (T.S no334 /2025-26) |
| 2 | Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 63 KVA Transformer) |
| 3 | Transportation and Loading of materials sub-station materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage. |
| 4 | Erection Part of 11 KV HT Line T. Sno./2025-26 |
| 5 | Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 6 | Erection of Tapping Structure S.T Double Pole 9 Mtr. Long - Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 7 | Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 8 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 9 | Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect. |
| 10 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. |
| 11 | Fixing jumper complete in all respect. |
| 12 | Erection of GO switch complete in all respect. |
| 13 | Erection of DO Fuse complete in all respect. |
| 14 | Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage. |
| 15 | Erection Part of 3Ph LT Line (T.s NO :-/2025-26) |
| 16 | Erection of LT line.Digging of pit of stay, Erection of ST Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 17 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 18 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 19 | Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line complete in all respect. |
| 20 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 21 | Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work. |
| 22 | Supply Part of 11/0.4 KV, 63 KVA Transformer(T.S no334 /2025-26) |
| 23 | Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA(Supply by HPSEBL 1nos) |
| 24 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (Supply by HPSEBL 2nos) |
| 25 | Prov. RCC Muff |
| 26 | Prov. concrete filling in RCC muff |
| 27 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 28 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA. |
| 29 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 30 | Transformer Belting & Knee Bracing |
| 31 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed] |
| 32 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer] |
| 33 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 34 | Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 35 | Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing) |
| 36 | Transformer L.T Distribution Box and GO Switch fixing Assembly |
| 37 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 38 | Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No. |
| 39 | Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm |
| 40 | Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type |
| 41 | Prov. D.O Fuse Unit |
| 42 | Prov. Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 43 | Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm |
| 44 | Prov. Stay set complete |
| 45 | Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) |
| 46 | Prov. Pipe Earthing Set |
| 47 | Prov. 6 SWG GI wire For Earthing |
| 48 | Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 63 KVA DTR |
| 49 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
| 50 | Prov. Full Clamp (M.S. Flat 50X6 mm) |
| 51 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 52 | Prov. Aluminium Thimble |
| 53 | Prov. Copper Thimble 200 Amp |
| 54 | Prov. Danger Plate |
| 55 | Prov. Barbed Wire |
| 56 | Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured |
| 57 | Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri- Vector meter with Box (CT-100/5A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 63 KVA Transformer |
| 58 | Prov. Aluminium Paint. |
| 59 | Prov. Red Oxide |
| 60 | Capacitors Bank 415 V, 36+ KVAr for 63 KVA |
| 61 | Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect. |
| 62 | Supply Part of 11 KV HT Line T.S No/2025-26 |
| 63 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate)Provided by HPSEBL 2Nos) |
| 64 | Prov. RCC Muff |
| 65 | Prov. concrete filling in RCC muff |
| 66 | Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor(Prov.by HPSEBL0.600 Kms.) |
| 67 | Run Through Str. ( ∆) Formation on Singlr Pole Str. |
| 68 | Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole |
| 69 | Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure |
| 70 | Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm |
| 71 | Prov.11kv Pin Insulator with pin complete in all respect |
| 72 | HT Stay /Guy Arrangement |
| 73 | Prov.11kv Stay set complete in all respect |
| 74 | Prov. Stay Wire HT (10 kg. per Stay Set) |
| 75 | Prov.11kv Earthing set complete in all respect. |
| 76 | Prov.G.I.Wire No. 8 SWG in mtr. |
| 77 | Prov.Eye/Earth Hook |
| 78 | Prov.MS Half Clamp |
| 79 | Prov.MS Full Clamp/stay |
| 80 | Prov.11kv Danger Plate (250x200x1.6 mm) |
| 81 | Prov.Nuts and Bolts of Various Sizes |
| 82 | Prov.Barbed Wire |
| 83 | Prov. Red Oxide |
| 84 | Prov. Aluminium Paint. |
| 85 | Tapping Str. Supply Material |
| 86 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base PlateProvided by HPSEBL 2Nos) |
| 87 | Prov. RCC Muff |
| 88 | Prov. concrete filling in RCC muff |
| 89 | Prov.Belt set -MS Angle Iron 50x50x6,Length 1800mm x2No. |
| 90 | Prov.X-Bracing set -MS Angle iron 50x50x6,length 2125mmx2no |
| 91 | Prov.X-Arm (Horizontal )Ms Channel (100x50x6,Length 2340x2mm2no formation |
| 92 | Prov.11kv Earthing set complete in all respect. |
| 93 | Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm |
| 94 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 95 | Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type |
| 96 | Prov. D.O Fuse Unit |
| 97 | Prov. Stay set complete |
| 98 | Prov. Stay Wire HT (10.0 kg Per Stay Set) |
| 99 | Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN ) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect. |
| 100 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
| 101 | Prov. Full Clamp (M.S. Flat 50X6 mm) |
| 102 | Supply Part of 3-Phase LT Line(T.s NO :-/2025-26) |
| 103 | Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Prov.by HPSEBL 2.242kMS)Supply by HPSEBL 1.400) |
| 104 | Prov. ST Pole 9 mtr.long .Supply by HPSEBL 6NOS) |
| 105 | Prov. RCC Muff |
| 106 | Prov. concrete filling in RCC muff |
| 107 | Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr. |
| 108 | Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts. |
| 109 | Prov. Earth Hook |
| 110 | Prov. LT Stay Set Stay Wire(i/c Stay Clamp) |
| 111 | Prov. stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect. |
| 112 | Prov.Half Clamp |
| 113 | Prov. Full Clamps [ 1 No for Stay Set] |
| 114 | Prov. Earthing Set complete |
| 115 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 116 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 117 | Prov. Red Oxide |
| 118 | Prov. Aluminium Paint. |
| 119 | Prov. Spiral PVC Spacer Please Enable Macros to View BoQ information |