| 1 | Erection Part of 3Ph LT Line 78/2024-25 |
| 2 | Erection of LT line.Digging of pit of stay, Erection of PCC Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 3 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 4 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 5 | Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line complete in all respect. |
| 6 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 7 | Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work. |
| 8 | Erection Part of 1Ph LT Line 48/2025-26 |
| 9 | Erection of LT line.Digging of pit of stay, Erection of PCC Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 10 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 11 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 12 | Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 1-Ph. L.T Line complete in all respect. |
| 13 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 14 | Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work. |
| 15 | Erection Part of 1Ph LT Line 266/2025-26 |
| 16 | Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 17 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 18 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. |
| 19 | Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 1-Ph. L.T Line complete in all respect. |
| 20 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 21 | Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work. |
| 22 | Supply Part of 3-Phase LT Line |
| 23 | Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Supply by HPSEBL(1.434 Kms) |
| 24 | Prov. PCC Pole 8 mtr.long complete in all respect.(Supply by HPSEB 7nos) |
| 25 | Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr. |
| 26 | Prov.Half Clamp |
| 27 | Prov. Full Clamps [ 1 No for Stay Set] |
| 28 | Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts. |
| 29 | Prov. Earth Hook |
| 30 | Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect. |
| 31 | Prov. Earthing Set complete |
| 32 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 33 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 34 | Prov. Spiral PVC Spacer |
| 35 | Supply Part of 1-Phase LT Line |
| 36 | Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Supply by HPSEBL(1.030 Kms) |
| 37 | Prov. PCC Pole 8 mtr.long complete in all respect.(Supply by HPSEBL(9nos) |
| 38 | Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr. |
| 39 | Prov.Half Clamp |
| 40 | Prov. Full Clamps [ 1 No for Stay Set] |
| 41 | Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts. |
| 42 | Prov. Earth Hook |
| 43 | Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect. |
| 44 | Prov. Earthing Set complete |
| 45 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 46 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 47 | Prov. Spiral PVC Spacer |
| 48 | Supply Part of 1-Phase LT Line (T.S No:-266/2025-26) |
| 49 | Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Supply by HPSEBL(1.340 Kms) |
| 50 | Prov. ST Pole 8 mtr.long alongwith baseplate complete in all respect.(Supply by HPSEBL(8nos) |
| 51 | Prov. RCC Muff (Supply by HPSEBL(8nos) |
| 52 | Filling of RCC Muffs with concrete complete in all respect. |
| 53 | Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr. |
| 54 | Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts. |
| 55 | Prov. Earth Hook |
| 56 | Prov. LT Stay Set Stay Wire(i/c Stay Clamp. |
| 57 | Prov. stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect. |
| 58 | Prov.Half Clamp |
| 59 | Prov. Full Clamps [ 1 No for Stay Set] |
| 60 | Prov. Earthing Set complete |
| 61 | Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 62 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 63 | Prov. Spiral PVC Spacer |
| 64 | Prov. Aluminium Paint |
| 65 | Prov. Red Oxide Please Enable Macros to View BoQ information |