| 1 | 3 H.P. Submersible set |
| 2 | Providing all labour, tools, tackles and technicians for taking out 3 H.P. submersible pump set with column pipe from bore well |
| 3 | Cost towards rewinding and repairing of 3 H.P submersible motor with S/F suitable winding wire, bronze bush etc. all complete after the deduction of cost of scrap materials. |
| 4 | Cost towards repairing of 3 H.P. submersible pump with S/F bronze impeller as per size and sample, bush, thrust plate, pump shaft etc. all complete after the deduction of cost of scrap materials. |
| 5 | Cost towards supplying fitting, changing 40 mm dia. UPVC Column pipe. |
| 6 | Cost towards supplying and fitting (1) 40 mm dia G.M. full way valve – 1 no (2) 40 mm dia NR valve – 1 no (3) 40 mm dia G.I. bend 2 Nos. (4) 40 mm dia M.S. clamp with nut bolt 2 pair after the deduction of cost of scrap materials. |
| 7 | Transportation charge of above p/set from work site to work shop and vice versa including loading and unloading charge. |
| 8 | Supplying and installation suitable size panel board for 3 H.P. submersible pump including fixing on wall comparising of following points such as (1) D.O.L starter – 1 no. (2) HRC fuse – 3 no. (3) volt meter with selector witch -1 set (4) Ammeter with selection switch – 1 set (5) indicating neon lamp – 3 no. Etc. All complete. |
| 9 | Providing all labour, tools tackles and technicians for lowering of 3 H.P Submersible pump set with all accessories in the bore well |
| 10 | 5 H.P. Submersible set |
| 11 | Providing all labour, tools, tackles and technicians for taking out 5 H.P. submersible pump set with column pipe from bore well . |
| 12 | Cost towards for rewinding and repairing of 5 HP submersible motor with S/F 1.0 SWG Round Copper winding wire 24 Slot, Gun Metal Bush, thrust plate, Thrust bearing, diapharm, oil seal, etc with lathe work. all complete. after the deduction of cost of scrap materials. |
| 13 | Cost towards repairing of 5 HP submersible pump with S/F noryl impeller as per size and sample, diffuser, S.S. shaft, S.S. coupling, S.S. sleeve, nut, C.I NRV etc. all complete after the deduction of cost of scrap materials. |
| 14 | Cost towards supplying fitting, changing 50 mm dia. UPVC Column pipe. |
| 15 | Supplying and installation suitable size panel board for 5 H.P. submersible pump including fixing on wall comparising of following points such as (1) D.O.L starter – 1 no. (2) HRC fuse – 3 no. (3) volt meter with selector witch -1 set (4) Ammeter with selection switch – 1 set (5) indicating neon lamp – 3 no. Etc. All complete. |
| 16 | Transportation charge of above p/set from work site to work shop and vice versa including loading and unloading charge. |
| 17 | Providing all labour, tools tackles and technicians for lowering of 5 H.P. Submersible pump set with all accessories in the bore well |
| 18 | 7.5 H.P. Submersible set - |
| 19 | Providing all labour, tools, tackles and technicians for taking out 7.5 H.P. submersible pump set with column pipe from bore well . |
| 20 | Cost towards for rewinding and repairing of 7.5 HP submersible motor with S/F 1.0 SWG Round Copper winding wire 24 Slot, Gun Metal Bush, thrust plate, Thrust bearing, diapharm, oil seal, etc with lathe work. all complete. after the deduction of cost of scrap materials. |
| 21 | Cost towards repairing of 7.5 HP submersible pump with S/F noryl impeller as per size and sample, diffuser, S.S. shaft, S.S. coupling, S.S. sleeve, nut, C.I NRV etc. all complete after the deduction of cost of scrap materials. |
| 22 | Providing all labour, tools tackles and technicians for lowering of 7.5 H.P. Submersible pump set with all accessories in the bore well |
| 23 | Transportation charge of above p/set from work site to work shop and vice versa including loading and unloading charge. |
| 24 | Provision for leakage repairing of different size of UPVC Sch- 80 pipe in place of existing / cracked and damaged pipe of ISI approved make or equivalent make damaged pipe in trenches and replacement of pipe and fitting so as to give 1 m average cover over the socket of pipes with disposal of excavated earth within initial lead and lift and necessary fitting and earth work in backfilling and cutting pipe to size etc. all complete as per specification and direction of E/I. |
| 25 | leakage in 65 mm dia UPVC pipe |
| 26 | leakage in 50 mm dia UPVC pipe |
| 27 | leakage in 40 mm dia UPVC pipe |
| 28 | leakage in 32 mm dia UPVC pipe |
| 29 | Provision for leakage repairing of different size of UPVC Sch- 80 pipe in place of existing / cracked and damaged pipe with red lead and yarn of following nominal bore screwed and socketed joints on wall, ceiling and floor including supplying and fitting on wall hooks or pipe clamp wooden plugs, cutting pipe to size and threading ends where necessary etc. all complete as per specification and direction of E/I. |
| 30 | leakage in 40 mm dia UPVC pipe |
| 31 | leakage in 32 mm dia UPVC pipe |
| 32 | leakage in 25 mm dia UPVC pipe |
| 33 | Supplying of materials for C.P. bathroom fitting for consumption day to day work. |
| 34 | 15mm dia C.P. bib cock (Long thread) |
| 35 | 15mm dia C.P. bib cock |
| 36 | 15mm dia C.P. Pillar cock (Long neck) |
| 37 | 15mm dia C.P. Angular stop cock (Long thread) |
| 38 | CP wall flange |
| 39 | 15mm dia CP Nipple with coupling(short pieces) |
| 40 | CP head shower |
| 41 | 32mm dia CP Waste |
| 42 | Commode Cover |
| 43 | Teflon tape |
| 44 | SWR S/S Pipe |
| 45 | 110mm dia PVC SWR S/S Pipe - |
| 46 | 75mm dia PVC SWR S/S Pipe - |
| 47 | Supplying all materials ,labours, tools and equipment for laying UPVC pipes of approved make in trenches with UPVC Solvent solution with socket and screw joints and cutting pipe as per size etc. all complete as per specification and direction of E/I. (In trenches) |
| 48 | 50mm dia. UPVC schedule 80 pipe-(In Trenches) [Make-Supreme/Ashirwad/PARAS] |
| 49 | 50mm dia. UPVC schedule 80 pipe-(In wall) [Make-Supreme/Ashirwad/PARAS] |
| 50 | 40mm dia. UPVC schedule 80 pipe- (In Trenches) [Make-Supreme/Ashirwad/PARAS] |
| 51 | 40mm dia. UPVC schedule 80 pipe- (In wall) [Make-Supreme/Ashirwad/PARAS] |
| 52 | 32mm dia. UPVC schedule 80 pipe- (In Trenches) [Make-Supreme/Ashirwad/PARAS] |
| 53 | 32mm dia. UPVC schedule 80 pipe- (In wall) [Make-Supreme/Ashirwad/PARAS] |
| 54 | 25mm dia. UPVC schedule 80 pipe-(In wall & overground) [Make-Supreme/Ashirwad/PARAS] |
| 55 | Supplying and fixing UPVC fittings of approved make all complete as per specification and direction of E/I. |
| 56 | a) UPVC Elbow (90 degree)50mm dia. UPVC |
| 57 | 40mm dia. UPVC |
| 58 | 32mm dia UPVC |
| 59 | 25mm dia. UPVC |
| 60 | b) Equal Tee 50mm dia. UPVC |
| 61 | 40mm dia. UPVC |
| 62 | 32mm dia UPVC |
| 63 | 25mm dia. UPVC |
| 64 | c) UPVC Socket 50mm dia. UPVC |
| 65 | 40mm dia. UPVC |
| 66 | 32mm dia UPVC |
| 67 | 25mm dia. UPVC |
| 68 | d) Union Socket50mm dia. UPVC |
| 69 | 40mm dia UPVC |
| 70 | 32mm dia UPVC |
| 71 | 25mm dia. UPVC |
| 72 | e) Reducing Bush50 mm x 40 mm dia. UPVC. |
| 73 | 50 mm x 32 mm dia. UPVC. |
| 74 | 40 mm x 32 mm dia. UPVC |
| 75 | 40 mm x 25 mm dia. UPVC |
| 76 | 32 mm x 25 mm dia. UPVC |
| 77 | e) Brass FTA 50mm dia. UPVC |
| 78 | 40 mm dia. UPVC |
| 79 | 32 mm dia. UPVC |
| 80 | 25mm dia. UPVC |
| 81 | 20mm dia. UPVC |
| 82 | f) Brass MTA 50mm dia. UPVC |
| 83 | 40 mm dia. UPVC |
| 84 | 32 mm dia. UPVC |
| 85 | 25mm dia. UPVC |
| 86 | 20mm dia. UPVC |
| 87 | 32mm dia. PVC waste pipe |
| 88 | PVC connection pipe |
| 89 | Supplying and fixing U-PVC Ball Valve of approved make all complete as per direction of E/I.. |
| 90 | 50 mm dia U-PVC Ball Valve |
| 91 | 40 mm dia U-PVC Ball Valve |
| 92 | 32 mm dia U-PVC Ball Valve |
| 93 | 25 mm dia U-PVC Ball Valve |
| 94 | 20 mm dia U-PVC Ball Valve |
| 95 | Supplying all materials tools and equipment for fixing HDPE water storage tank triple layer Gangotri/Himgiri/Hippo or any other approved equivalent make conforming to IS 12701, 1996 fixing on the above plateform including, cutting 3 Nos., hole in tank for rising, overflow, delivery and washout including supplying full thread nipple with jamnut and fixing connection etc. and supplying fitting & fixing brass ball cock of required size as per specification and direction of E/I. 2000 litrs capacity water tank. |
| 96 | Providing all labour tools and matenals to make platform for 2000 L HDPE water storage tank 4'10\\" dia x 6\\" height by doing sand filling, brick flat soiling, plaster & net cement of approved quality all complete as per direction of E/I. |
| 97 | Supply, installation testing & commissioning of water chiller with in-built 5-7 stage water purification system havingstainless steel storage tank, SS piping's and taps with 100 - 150 Liters. Storage capacity and 100-120 liters per hour chilled & purified water supply of reputed make like Voltas/Eureka Forbes/Blue star/USHA etc. With all accessories such as voltage stabilizer, piping, electrical wiring etc. and 1 year warranty included. |
| 98 | Providing all labour tools and materials to make platform for water chillers 3' x 2½' x 1½ by doing earth excavation, sand filling, brick flat solling, PCC plaster & fitting tiles of approved quality all complete as per direction of E/I |
| 99 | Supplying & laying 25 mm dia UPVC pipe ( Apprx - 10 m ) for connection of water chiller and drainage of wastage water with all fittings and fixing etc. all complete. |
| 100 | Supplying & fitting 32A main switch on the wall of A.D. wall with all materials, labour & tools required. |
| 101 | Supplying material and labour for construction of RCC(1:2:4) protection chamber for HYDT bore well having internal size 0.6x0.6 meter and wakk thicknessof 0.2 meter with required depth as per site condition including 12mm thick C.P(1:4) or exposed surface, RCC slab cover and fixing on RCC wall, apply two coats of anti-corrosion paint including the cost of reinforcement, carriage of materials all taxes earth work etc. |
| 102 | Supplying materials and construction single mounted RCC 1:2:4 stand post as per approved design drawing &specification including supplying & fixing 15mm dia brass bib cock of approved make and weight not less then 350gms. & 2 mtr. : 15mm dia GI pipe properly embedded including fixing & supplying of elbows, Nipple, Socket as required but excluding the cost of platform and as per specification and direction of E/I. |
| 103 | Cost towards supplying and installation of Three phase submersible pump having required stages with Noryl impeller operating on 415 V ±15%, 50 Hz, 2900 rpm having discharge 3000 to 4000 LPH against a total head of 120 meters coupled with water cooled motor including all accessories such as :- 50 mm dia PVC heavy duty pipe 120 meters (ii) 2.5 mm² x 3 core flat copper cable-120 meters up to the clamp (iii) G.M gate valve-1 no. , G.M. reflex valve-1 no. on delivery pipe line, including all fittings bend nipple having suitable panel board having suitable starter, main switch pilot lamp, voltmeter, ampere meter,including ½” dia rope for lifting and 2 pair MS clamp etc. allcomplete. Including digging earth and laying cable under 1.5”dia black PVC pipe for protection as per direction of E/I. |
| 104 | Cost towards supplying and installation of Three phase submersible pump having required stages with Noryl impeller operating on 415 V ±15%, 50 Hz, 2900 rpm having discharge 5000 to 7000 LPH against a total head of 120 meters coupled with water cooled motor including all accessories such as :- 50 mm dia PVC heavy duty pipe 120 meters (ii) 4.0 mm² x 3 core flat copper cable-120 meters up to the clamp (iii) G.M gate valve-1 no. , G.M. reflex valve-1 no. on delivery pipe line, including all fittings bend nipple having suitable panel board having suitable starter, main switch pilot lamp, voltmeter, ampere meter,including ½” dia rope for lifting and 2 pair MS clamp etc. all complete including digging earth and laying cable under 1.5”dia black PVC pipe for protection as per direction of E/I. |
| 105 | Providing all material, equipment and wash out and cleaning of 2000/1000 litre PVC water storage tank including rubbing the wall of tank by the help of coconut, rushi and bleaching powder and washing by clean water all complete as per direction of E/I. Please Enable Macros to View BoQ information |