Tender For Link Road Manauri Power Chennai Taraf Se Pani Tanki Hote Hue Lahuri Charwa Tak Road Repair Work 05 Year Defect Lability Work, Kaushambi-Uttar Pradesh
TDR : 55123583
Tender Notice
BOQ
4 Days Left
Kaushambi
Uttar Pradesh
Tender For Link Road Manauri Power Chennai Taraf Se Pani Tanki Hote Hue Lahuri Charwa Tak Road Repair Work 05 Year Defect Lability Work
Name of Work:- lEidZ ekxZ eukSjh ikoj pubZ rkjk ls ikuh Vadh gksrs gq, ygqjh pjok rd dk [email protected] dk;Z okh; vuqj{k.k vof/k lfgr½
Sl. No.
Item Description
1
Earth work in cutting or in embankment in ordinary soil excavtion to be in the form of reqular pits not exceeding 1/2 metre in deptk and earthwork in embankment to be in 20 cm layers including ramming & dressing the surface to required levels and slopes and also inclduing 1.5 metre lifts and 30m lead the earth from cutting to be used in making embankement or to be deposites as directed as directed by EC
2
Excavation in foudation in ordinary soil inclduing lift upto 1.50 m and lead upto 30 m including filling watering and ramming of excavated earth into the trenches of in to the space between the building and the side of foundation trenches or into the plinth and removal and disposal of surplus earth as
3
W.B.M. Grading-3Providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Kn in stages to proper gra
4
P/l cement concrete in 1:6:12 in foundation and under floors (1 cement :6 sand :12 brick ballast 40 mm gauge) including all supply of all materials labour tools
5
cement concrete with 20/10 mm gauge approved stone grit coarse sand 2.5fm and cement proportion of M20 1:1.5:3 including supply of all materials of all materials
6
supply and laying of 125 micron pllythene sheet including supply of all material labour and t&P
7
M150 class brick work in 1:4 in cement and coarse sand in foundation and plinth including all supply of all materials
8
supply and laying of 6mm thick plain a.c sheet in joints of c.c road
9
Supply and fixing of 350mm dia hp Chapter 01 Page 15 sedule 2020
10
S/F of signboard as per direction of engineer in charge
11
The routine maintenance of above road work including earthen shoulder and c. c road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 1st year maintenance [email protected]%
12
The routine maintenance of above road work including earthen shoulder andc.c road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 2nd year maintenance [email protected]%
13
The routine maintenance of above road work including earthen shoulder c.c road pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 3rd year maintenance [email protected]%
14
The routine maintenance of above road work including earthen shoulder and ic.c road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 4th year maintenance [email protected]%
15
The routine maintenance of above road work including earthen shoulder and c.c etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 5th year maintenance [email protected]% Item No. 1 to 10 cost of work (item no 11 to 15 Maintenance work) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.