|
| 1 | Reconductoring LT line |
| 2 | Straightening one slanted 11kV pole after unbinding the line and binding the line after work. |
| 3 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through Vcross arm to the ground for earthing (excluding provision of earthing). |
| 4 | Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 5 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 6 | Dismantling (without damage) one km LT single phase 2 wire OH lineconductor by dismantling cross arms, insulators and stacking theconductors in rolls properly. |
| 7 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 8 | Dismantling (without damage) one km LT additional conductor line bydismantling cross arms, insulators and stacking the conductors in rollsproperly. |
| 9 | Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitting of all items and conveyance of all materials. |
| 10 | Renewal of existing damaged/broken old LT stay in existing stay rod. |
| 11 | Straightening one slanted LT pole after unbinding the line and binding theline after work. |
| 12 | Straightening one slanted LT Cut Pole after lowering down the existingline and stringing the line after work |
| 13 | Disconnecting and lowering down the single phase WP serviceconnection with guy wire from the OH line and reconnecting the sameafter completing the line work. |
| 14 | Disconnecting and lowering down the three phase WP service connectionwith guy wire from the OH line and reconnecting the same aftercompleting the line work. |
| 15 | Providing Stay for LT poles including digging & back filling pit inordinary soil. |
| 16 | Insertion of one LT PSC pole in existing single phase OH line includingdigging & back filling pit in ordinary soil, fitting cross arm, insulator,binding etc. excluding transportation of poles. |
| 17 | Dismantling one ordinary street light/CFL/LED fitting from existing poleand refitting the same on newly erected pole including disconnecting andreconnecting wires. |
| 18 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 19 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 20 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 21 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 22 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 23 | Erection of suspension clamp for LT ABC of any size |
| 24 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 25 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT three phase 4 wire line including cutting and removing treebranches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 26 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 3 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 27 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 28 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Rock. |
| 29 | Installing One No. Insulation piercing connector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 30 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 31 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinary soil & backfilling. |
| 32 | Additional rate for excavation of one Pit for Coil Earthing in Soft Rock. Please Enable Macros to View BoQ information |