Name of Work:- Green City Colony Arjun ganj Lucknow me CC Road ka nirman karya
Sl. No.
Item Description
1
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil. DSR 2023- 2.8.1
2
Cartage of surplus earth/malva up to 5 Km distance including loading and unloading. - SOR-231(a)
3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). DSR 2023- 4.1.8
4
Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level - L.D.A APPRO.
5
Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1 DSR 2023- 5.9.1
6
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement, All works upto plinth level, Concrete of M25 grade with minimum cement content of 330 kg /cum DSR 2023- 5.33.1.1
7
trimixing of CC Surface with hardner 3.50 kg/sqm including proper completion of work - PSR 10
8
Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor graded on perpared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratoy roller to achieve the desired density complete as per clause 401. for grading I material (GSB-1) (Sanction rate) -1001 Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.