|
| 1 | Erection Part of 11 KV HT Line |
| 2 | Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 3 | Erection of S.T Single Pole 11 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 4 | Erection of Double Pole 11 Mtr. Long Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 5 | Erection of Double Pole 9 Mtr. Long for Tapping Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 6 | Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 7 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 8 | Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect. |
| 9 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. |
| 10 | Fixing jumper complete in all respect. |
| 11 | Erection of GO switch complete in all respect. |
| 12 | Erection of DO Fuse complete in all respect. |
| 13 | Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage. |
| 14 | Erection Part of 11/0.4 KV, 100 KVA Transformer |
| 15 | Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 100 KVA Transformer) |
| 16 | Transportation and Loading of S/Stn. complete and allied materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of DTR and allied Material For Average Distance From Road To Site Of Work .(If required as per site). |
| 17 | Supply Part of 11 KV HT Line |
| 18 | Prov. Steel Tubular Poles (9m, Working Load > 227kgf/m²) with Steel cap & Base Plate |
| 19 | Prov. Steel Tubular Poles 11m, Long with Steel cap & Base Plate |
| 20 | Prov. RCC Muff |
| 21 | Prov. concrete filling in RCC muff |
| 22 | Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor |
| 23 | Run Through Str. ( ∆) Formation on Singlr Pole Str. |
| 24 | Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole |
| 25 | Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure |
| 26 | Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm |
| 27 | Prov.11kv Pin Insulator with pin complete in all respect |
| 28 | Dead end Structure: |
| 29 | Prov.Belt set -MS Angle Iron 50x50x6,Length 1800mm x2No. |
| 30 | Prov.X-Bracing set -MS Angle iron 50x50x6,length 2125mmx2no |
| 31 | Prov.X-Arm (Horizontal )Ms Channel (100x50x6,Length 2340x2mm2no formation |
| 32 | Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN ) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect. |
| 33 | Prov.11kv Pin Insulator with pin complete in all respect |
| 34 | HT Stay /guy Arrengement |
| 35 | Prov. Stay set complete |
| 36 | Prov. Stay Wire HT (10.0 kg Per Stay Set) |
| 37 | Earthing |
| 38 | Prov.11kv Earthing set complete in all respect. |
| 39 | Prov.G.I.Wire No. 8 SWG in mtr. |
| 40 | Prov.Eye/Earth Hook |
| 41 | Prov.MS Half Clamp |
| 42 | Prov.MS Full Clamp/stay |
| 43 | Prov.11kv Danger Plate (250x200x1.6 mm) Supply by HPSEBL (6No.) |
| 44 | Prov.Nuts and Bolts of Various Sizes |
| 45 | Prov.Barbed Wire |
| 46 | Prov. Aluminium Paint. |
| 47 | Prov. Red Oxide |
| 48 | Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type |
| 49 | Prov. D.O Fuse Unit |
| 50 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 51 | Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm |
| 52 | Tapping Str. Supply Material |
| 53 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate |
| 54 | Prov. RCC Muff |
| 55 | Prov. concrete filling in RCC muff |
| 56 | Prov.Belt set -MS Angle Iron 50x50x6,Length 1800mm x2No. |
| 57 | Prov.X-Bracing set -MS Angle iron 50x50x6,length 2125mmx2no |
| 58 | Prov.X-Arm (Horizontal )Ms Channel (100x50x6,Length 2340x2mm2no formation |
| 59 | Prov.11kv Earthing set complete in all respect. |
| 60 | Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm |
| 61 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 62 | Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type |
| 63 | Prov. D.O Fuse Unit |
| 64 | Prov. Stay set complete |
| 65 | Prov. Stay Wire HT (10.0 kg Per Stay Set) |
| 66 | Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN ) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect. |
| 67 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
| 68 | Prov. Full Clamp (M.S. Flat 50X6 mm) |
| 69 | Prov.11kv Danger Plate (250x200x1.6 mm) Supply by HPSEBL (1No.) |
| 70 | Supply Part of 11/0.4 KV, 100 KVA Transformer |
| 71 | Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 250 KVA |
| 72 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 73 | Prov. RCC Muff |
| 74 | Prov. concrete filling in RCC muff |
| 75 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 76 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA. |
| 77 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 78 | Transformer Belting & Knee Bracing |
| 79 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed] |
| 80 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer] |
| 81 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 82 | Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 83 | Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing) |
| 84 | Transformer L.T Distribution Box and GO Switch fixing Assembly |
| 85 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 86 | Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No. |
| 87 | Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm |
| 88 | Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type |
| 89 | Prov. D.O Fuse Unit |
| 90 | Prov. Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 91 | Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm |
| 92 | Prov. Stay set complete |
| 93 | Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) |
| 94 | Prov. Pipe Earthing Set |
| 95 | Prov. 6 SWG GI wire For Earthing |
| 96 | LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 100 KVA DTR |
| 97 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
| 98 | Prov. Full Clamp (M.S. Flat 50X6 mm) |
| 99 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 100 | Prov. Aluminium Thimble |
| 101 | Prov. Copper Thimble 200 Amp |
| 102 | Prov. Danger Plate |
| 103 | Prov. Barbed Wire |
| 104 | Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured |
| 105 | Prov. Aluminium Paint. |
| 106 | Prov. Red Oxide |
| 107 | Chain Link fencing , Angle Iron ,Gate etc for transformerfencingComplete in all respect. Please Enable Macros to View BoQ information |