|
| 1 | Providing cost of dewatering including cost of boaring laying of 4\\" dia PVC pipe hire charges of 7.50 KV deisal pumping set hire charges of PVC pipe & cost of 4\\" dia plastic pipe for desposal of water as required distance also including wages of pumping set oprator its fuel etc. As per DSR 12.45.4 (a) |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MORTH specification No 12.01 & 304 |
| 3 | Construction of granular subbase by providing Well grade material, spreading in uniform layers with Motar grader/tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with rotarater at OMC and compacting with smooth wheel roller to achieve the desired density complete as per Technical Specification Clause 401. |
| 4 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per MORTH specification No 12.40 & 2100 M-10 |
| 5 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M25 using batching plant transit mixer & manual placing |
| 6 | providing and fixing of PVC pipe for raft, wall and slab etc. |
| 7 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications As per MORTH specification No12.41, 1600 & 2200 |
| 8 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces.As per MORTH specification No 14.16 & 800 |
| 9 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification As per MORTH specification 13.9, 710.1.4.of IRC:78 & 2200 |
| 10 | Providing for laying Boulder apran for bed protection with stone boulders of minimum size and weight as per table 1300.1 no fragment weighting not les than 25 kg. laid dry Complete as per drawing and technical Specification clause 1301 |
| 11 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 carted up to 1 km |
| 12 | Supply and Laying 1000 mm dia R.C.C. Hume pipe NP-3 Class for Water divert |
| 13 | Brick soling with straight over burnt bricks laid on edge and dry including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth, spreading blinding coat of 1 cm (3/8\\") depth of local earth of P.I. 5 to 7 or sand over the entire surface and including labour and T&P etc. required for proper completions of the work. |
| 14 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 carted up to 1 km |
| 15 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 16 | Providing laying and spreading material on a prepared sub grade adding cement@2% by weight to the spread material manually mixing in place with rotavator and compacting with rhe road foller at OMC to achieve the desired unconfined compressived strength and to from a layer of sub-base. MoRTH Spec 403 |
| 17 | Providing laying and spreading material on a prepared sub base cement @4% by ewight to rhe spread meterial manually mixing in place with rotavator and compacting with the road roller at OMC to achueve the desired unconfined compressive strength and to form a layer of base MoRTH Spec 405 |
| 18 | Providing and laying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.35 Kg. (as per UPPWD) Per sqm on the prepared primed granular surface cleaned with mechanical broom |
| 19 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type as per Technical Specification Clause 5.9-508 |
| 20 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 5.12-510. |
| 21 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 22 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. Grade M 10 |
| 23 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1200&1203 |
| 24 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications |
| 25 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. Grade M 20 |
| 26 | Providing and laying filter material undermeath pitching in slopes complete as per drawing and technical specification. |
| 27 | Providing and laying pitching on slopes laid over prepared filter media including boulder pron laid dry in front of toe of embankment complete as per drawing and technical specification Please Enable Macros to View BoQ information |