|
| 1 | Lifting of breakdown submersible pump along with pipes,PVC cable, valves etc and stacking of pipes,cable etc at suitable as per the instruction of EIC |
| 2 | Lowering of repaired submersible pump motor set into borewell and pipe fitting, PVC cable connection and binding with pipe, fixing of valves etc |
| 3 | Providing & fixing 8 mm dia wire rope with PVC insulation complete as per the instruction of EIC |
| 4 | Rebinding of armature of submersible pump complete as per instruction of EIC |
| 5 | Repairing of submersible motor bush as per instruction of EIC |
| 6 | Fabrication of cable joint with water proofing insulation as per instruction of EIC |
| 7 | Providing erecting and giving test of 5 HP submersible pump set confirming to IS 8034 |
| 8 | Supplying and erection automatic control panel for centrifugal/5HPsubmersible pump set consisting of starter S.P.P. water level controller,armeter phase indicating lamp etc way for UG Tank. |
| 9 | providing 3 core flat submersible 6 sqmm cable |
| 10 | Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all complete for borewell of:200 mm dia |
| 11 | Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required size complete.200 mm clamp |
| 12 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work:25 mm nominal dia Pipes |
| 13 | Providing and fixing PTMT bib cock of approved quality and colour.:15mm nominal bore, 86 mm long, weighing not less than 88 gms |
| 14 | Providing and fixing PTMT pillar cock of approved quality and colour.:15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 gms |
| 15 | Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of useable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. bystep draw down method, collecting water samples & getting tested in approved laboratory, includingdisinfection of tubewell, all complete, including hire & labour charges of air compressor, tools &accessories etc., all as per requirement and direction of Engineer-in-charge. |
| 16 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |