| 1 | A. Site Clearance & Formation Cutting |
| 2 | Clearing and grubbing road land including uprooting rank vegetation,grass,bushes,shrubs,saplings and trees girth up to 300 mm,etc all complete. |
| 3 | Cutting of trees,including cutting of trunks,branches and removal of stumps,roots,stacking of serviceable material with all lifts and upto a lead of 1000 metres and earth filling in the depression/pit. |
| 4 | i) Girth from 300 mm to 600 mm. |
| 5 | ii) Girth from 600 mm to 900 mm. |
| 6 | iii) Girth from 900 mm to 1800 mm. |
| 7 | Earth work in excavation in hilly area by manuals means |
| 8 | a) Ordinary Soil |
| 9 | b) Ordinary Rock |
| 10 | c) Marshy Soil |
| 11 | B. RCC Breast Wall at Ch. At 0.110 Km |
| 12 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingles or small size boulders upto 30 cm size,lift upto 1.50 m etc |
| 13 | Dry stone pitching including supply of stone and preparing surface complete . |
| 14 | Providing and laying C.C. 1:5:10 excluding the cost of centering and shuttering.For footing base |
| 15 | Centring and shuttering including struting, propping etc. and removal of formwork. a) For foundation ,footing and bases of column. |
| 16 | Reinforcement of RCC work including bending,binding and placing in position complete.b) Tar/TMT Steel. |
| 17 | Reinforced cement concrete work in foundation,footings bases of columns and mass concrete excluding the cost of centering,shuttering and reinforcement. A) M20 (1 Cement:1.5 Coarse sand:3 stone aggregate,20 mm nominal size) |
| 18 | C. RCC Breast Wall at Ch. At 0.618 Km |
| 19 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingles or small size boulders upto 30 cm size,lift upto 1.50 m etc |
| 20 | Dry stone pitching including supply of stone and preparing surface complete . |
| 21 | Providing and laying C.C. 1:5:10 excluding the cost of centering and shuttering.For footing base |
| 22 | Centring and shuttering including struting, propping etc. and removal of formwork. a) For foundation ,footing and bases of column. |
| 23 | Reinforcement of RCC work including bending,binding and placing in position complete.b) Tar/TMT Steel. |
| 24 | Reinforced cement concrete work in foundation,footings bases of columns and mass concrete excluding the cost of centering,shuttering and reinforcement. A) M20 (1 Cement:1.5 Coarse sand:3 stone aggregate,20 mm nominal size) |
| 25 | D. RCC Breast Wall at Ch. At 0.892 Km |
| 26 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingles or small size boulders upto 30 cm size,lift upto 1.50 m etc |
| 27 | Dry stone pitching including supply of stone and preparing surface complete . |
| 28 | Providing and laying C.C. 1:5:10 excluding the cost of centering and shuttering.For footing base |
| 29 | Centring and shuttering including struting, propping etc. and removal of formwork. a) For foundation ,footing and bases of column. |
| 30 | Reinforcement of RCC work including bending,binding and placing in position complete.b) Tar/TMT Steel. |
| 31 | Reinforced cement concrete work in foundation,footings bases of columns and mass concrete excluding the cost of centering,shuttering and reinforcement. A) M20 (1 Cement:1.5 Coarse sand:3 stone aggregate,20 mm nominal size) Please Enable Macros to View BoQ information |