| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 2 | FittinganderectingoneHTPSCSinglePoleinposition,includingfitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 3 | Additionalrateforprovidingonediscset,PGclampetc.complete,onany type of HT pole for making cut point. |
| 4 | FittingoneAdditional75x40mm,1.8mChannelcrossarminexisting single pole including conveyance of materials. |
| 5 | LabourchargesforloadingHTPSCpolefromthestackingplaceand unloading the same at work site (transportation by any vehicle). |
| 6 | Fitting one set AB switch on existing DP, giving connection and drawing sufficientlengthofGIearthingleadstothegroundforearthing,excluding provision of earthing. |
| 7 | FittingoneAdditional2.4m/3mChannelcrossarm(100x50x6mm),in existing 11kV DP including conveyance of materials. |
| 8 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 9 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of1.5mawayfromthepole/structureandmaintainingstandarddistance between different earth pipes in ordinary soil &backfilling. |
| 10 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back fillingpit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 11 | FittingoneAdditionalVcrossarminexistingsinglepoleincluding conveyance of materials. |
| 12 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole includingdiggingandbackfillingpitsinordinarysoil,drawingsufficient lengthofGIearthleadstothegroundforearthing(excludingprovisionof earthing). |
| 13 | Fitting 6 channel cross arms, AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, drawing sufficientlengthofGIearthingleadstothegroundforearthing,excluding provision of earthing & mounting of Transformer on poles. |
| 14 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. |
| 15 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete1:2:4,footingofsize30cmx30cmx50cm,paintingwithsynthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 16 | Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 17 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units excluding loading& unloading charges. |
| 18 | Erectingone100kVATransformertoexistingDPandgivingconnections, includingloadingfromTMR/SRS/otherstackingplace&unloadingat site but excluding cost for transporting transformer. |
| 19 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 20 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 21 | FittingandprovidingoneStrutusingHTPSCpoleincludingdiggingand back filling pit in ordinary soil. |
| 22 | ProvidingoneCoilEarthusingNo.8GI-earthwire(50mmdia,115turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 23 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 24 | LabourchargesforloadingLTPSCpolefromthestackingplaceand unloading the same at work site (transportation by any vehicle). |
| 25 | Providingconcretemuffingofsize0.45x0.45x1.5m(0.5maboveGLand 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 26 | Dismantling(withoutdamage)oneLTPSC/RCCpoleafterdisconnecting stays, strut etc. attached thereon and stacking the same. |
| 27 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 28 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 29 | DisconnectingandloweringdownthethreephaseWPserviceconnection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 30 | ProvidingbridgingatCutpointsfor3PH11kVlinewithXLPEInsulated ACSR Raccoon or equivalent (1 conductors) using IPC and respective conductors |
| 31 | Transporting one HT PSC pole by Hand cart - normally limited to 4km(excluding loading and unloading). |
| 32 | Quoted Amount of BOQ1 in figures |
| 33 | GST Rate in percentage Please Enable Macros to View BoQ information |