| 1 | Supply of LT Bare N. Conn. PG Clamp for DB 50-50mm2 |
| 2 | Supply of Dead End Clamp with I Hook Abcable SP-21 |
| 3 | Supply of MS Nut & Bolt off size |
| 4 | Supply of Stay Clamp S/E SP-23 |
| 5 | Supply of Top Bracing Clamp Bottom for SP-33 with N&B |
| 6 | Supply of Holding Clamp for fuse set/TPMO for SP-23 with N&B |
| 7 | Supply of Top Channel Clamp for SP-23 with N&B |
| 8 | Supply of Suspension Clamp Eye Hook LT ABC Cable |
| 9 | Supply of Stay Clamp for SP-23 Double End |
| 10 | Supply of Earth Wire Clamp for SP-23 with N&B |
| 11 | Supply of HT Stay Insulator |
| 12 | Supply of LT Clamp for SP-21 with N&B |
| 13 | Supply of Stay Clamp for SP-21 with N&B |
| 14 | Supply of Stay Insulator |
| 15 | Supply of Bracing Clamp Top for SP-23 with N&B |
| 16 | Supply of LT Clamp for SP-23 with N&B |
| 17 | Supply of Shackle Insulator 100x115 mm with N&B |
| 18 | Installation of 25 KVADTR on Pole Structure |
| 19 | Headload Cartage of 25 KVA DTR, 21-50 KM |
| 20 | Cartage of 16/25 KVA DTR, 21-50 KM |
| 21 | Fixing of Fuse Set |
| 22 | Fixing of Lightning Arrestor |
| 23 | Erection of LT Stay Set |
| 24 | Headload Cartage of Material (0-1 KM) |
| 25 | Excavation of Pit for Stay Set |
| 26 | Erection of Single SP-23 Pole |
| 27 | Erection of Earthing Rod |
| 28 | Grouting of Pole |
| 29 | Excavation of Pit for Pole |
| 30 | Muffing of Pole |
| 31 | Erection of 11 KV Stay Set |
| 32 | Grouting of Stay Set |
| 33 | Fabrication of Steel |
| 34 | Chemical Earthing |
| 35 | Laying of Rabbit Conductor in HT Line |
| 36 | Erection of Double Poles of SP-23 |
| 37 | Cartage of SP-21/23 Pole, 21-50 KM |
| 38 | Headload Cartage SP-21/23 Pole (0-1 KM) |
| 39 | Erection of Single SP-21 Pole |
| 40 | Guarding of LT/11 KV Line |
| 41 | Cartage of Petty Material, 21-50 KM |
| 42 | Laying & Fixing LT XLPE Cable Please Enable Macros to View BoQ information |