| 1 | Supply of LT Clamp SP-21 with N&B |
| 2 | Supply of Bracing Clamp Top SP-23 with N&B |
| 3 | Supply of Top Channel Holding Clamp for SP-23 |
| 4 | Supply of Shackle Insulator 100x115mm with N&B |
| 5 | Supply of HT Stay Insulator |
| 6 | Supply of Bottom Bracing set Clamp for SP-23 with N&B |
| 7 | Supply of Stay Clamp S/E for SP-23 with N&B |
| 8 | Supply of Earth Wire Clamp for SP-23 With N&B |
| 9 | Supply of Stay Clamp for SP-21 with Nut & Bolt |
| 10 | Supply of Stay Clamp for SP-23 Double End |
| 11 | Supply of Stay Insulator 100x115 |
| 12 | T-off connection complete 11 KV Line |
| 13 | Erection of LT Stay Set |
| 14 | Excavation of Pit for Stay Set |
| 15 | Erection of Earthing Rod |
| 16 | Grouting of Pole |
| 17 | Exacavation of pit for Pole |
| 18 | Muffing of Pole |
| 19 | Erection of 11 KV Stay Set |
| 20 | Grouting of Stay Set |
| 21 | Dismantling of AB Cable |
| 22 | Dismantling of SP-10 Single Pole |
| 23 | Fabrication of Steel |
| 24 | Laying of AB Cable 1x16+25 mm |
| 25 | Erection of SP 23 Double Pole |
| 26 | Cartage of SP-21/23 Pole, 21-50 Km |
| 27 | Erection of Single SP-21 Pole |
| 28 | Erection of Single SP-10 Pole |
| 29 | Laying of Weasel Comductor in HT Line |
| 30 | Cartage of Petty Material, 21-50 Km |
| 31 | Back Cartage of Petty Material, 51-70 Km |
| 32 | Headload Cartage SP-23 Pole 6KM |
| 33 | Headload Cartage SP-21 Pole 6KM |
| 34 | Headload Cartage of petty material, 6KM |
| 35 | Back Headload Cartage of Petty Material 1-3 KM |
| 36 | Lopping and Chopping of Tree Branches Please Enable Macros to View BoQ information |