| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work. oridinary soil 30% |
| 2 | Soft Rock 70% |
| 3 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. |
| 4 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. PCC Grade M20 |
| 5 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. PCC Grade M20 |
| 6 | Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications. |
| 7 | Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications |
| 8 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification.RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump |
| 9 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications |
| 10 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. |
| 11 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications |
| 12 | Dry Rubble Flooring. (Construction of dry rubble flooring at cross drainage works for relatively less important works.) |
| 13 | Plastering with cement mortar (1:3) on brick work in substructure as per technical specifications |
| 14 | Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. |
| 15 | Dewatering During working period with 10H.P diesel set do-----do--------all complete job. |
| 16 | Carriage Of Materials Cement |
| 17 | steel |
| 18 | Boulder |
| 19 | stone Chips |
| 20 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 21 | Sand Filling in foundation trenches as per drawing & technical specification |
| 22 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 23 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. Grade-M15 |
| 24 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.Random Rubble Masonry (Coursed/uncoursed) |
| 25 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications Random Rubble Masonry (Coursed/uncoursed) |
| 26 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specificationsPCC Grade M15 using batching plant & concrete pump |
| 27 | Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications. |
| 28 | Tuck Pointing with cement mortar (1:3) on brick or stone masonary work as per drawing and technical specification Clauses 613.3 and 1204 |
| 29 | Carriage of material Cement |
| 30 | Ston Chips |
| 31 | Boulder |
| 32 | Bricks |
| 33 | Add 18% GST |
| 34 | Add 1% Labour Cess Please Enable Macros to View BoQ information |