|
| 1 | Removing & Renew of marine plywood flooring with FRP Lining. |
| 2 | PUF filling under the flooring. |
| 3 | Removing & renew of top & side panelling with aluminium composite panel. |
| 4 | Removing and renew of Sofa at meeting space with marine plywood and upholstery covered with heavy duty raxine. |
| 5 | Repair and replacement of 12 Nos. reclined chair cover. |
| 6 | Renew of Aft cock pit seat with marine plywood and Upholstery seat covered with heavy duty rexine. |
| 7 | Repairing of pantry table with new laminates. |
| 8 | Replacement of meeting space folding Table. |
| 9 | Renew of Toilet partition and door with new Laminates. |
| 10 | Replacement of anti Skid PVC Floor matting. |
| 11 | Replacement of Window channel with new rubber bidding. |
| 12 | Renew of Helm Console & AC cover. |
| 13 | Replacement of all Nav Lights as per present setup. |
| 14 | Replacement of Cabin Lights, Cockpit Lights and Engine room Lights with led Lights and Cabin and Cockpit Fans with Switches as per requirement. |
| 15 | Supply and Fitting of 2 Nos. heavy Duty marine wiper |
| 16 | 2 Nos. automative marine Bilge Pump with Pipe and all fittings. |
| 17 | Replacement of main Deck damaged Cleat/Fair Leads. |
| 18 | Replacement of Rubber D-Fender for all around Boat Hull with S.S. Bolts. |
| 19 | Repairing of Engine Room ventilation Blower and Supply and fitting of Exhaust Fan. |
| 20 | Painting of Hull, main deck, superstructure with Epoxy and PU Painting System With Marine Painting Scheme |
| 21 | Painting of under water Hull with marine antifouling painting scheme. |
| 22 | Painting of Boat & Department names, tally plates, labeling, logo at both sides etc. |
| 23 | Dry-Docking of Boat including supervision and taking on hard including labour. |
| 24 | Supervision of Boat launching into the water including Labour. |
| 25 | Boat leveling in workshop and convering for painting etc. |
| 26 | NOTE: Excluding GST, EPF & ESI and Labour cess Please Enable Macros to View BoQ information |