| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 14.90 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by Engineer-in-Charge. |
| 2 | Engaging Hydraulic excavator for various works at site including but not exclusive of clearing jungle, uprooting of rank and heavy vegetation, grass, brush wood, trees, saplings, removal of rubbish/ malba, dressing the ground, excavating earth, etc. complete as per direction of Engineer-in-charge. The rate is inclusive of driver, fuel, lubricants, etc. for 8 hours shift and noting extra shall be payable. |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.(a)Nominal concrete 1:3:6 or richer mix (including equivalent design mix) |
| 5 | Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : |
| 6 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead |
| 7 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 9 | Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. |
| 10 | Providing and laying 60 mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 11 | Providing and laying 60 mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 12 | Laying old cement cocrete interlocking paver blocks of any design/shape laid in required line, level, curvature, colour and pattern overand including 50 mm thick compacted bed of coarse sand, filling thejoints with fine sand etc. all complete as per the direction of Engineerin-charge. (Old CC paver blocks shall be supplied by the departmentfree of cost) |
| 13 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 14 | Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in:(a) Cement mortar 1:6 (1 cement : 6coarse sand) |
| 15 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 16 | 12 mm cement plaster of mix :(a)1:6 (1 cement: 6 coarse sand) |
| 17 | 15 mm cement plaster on rough side of single or half brick wall of mix:(a)1:6 (1 cement: 6 coarse sand) |
| 18 | providing and fixing SFRC fence V-type Railing of size 1000x1000x50mm of M-30 grade cement concrete suitably reinforced using vibrio compaction process using jointless FRP moulds and fixed in a block of mix 1:2:4(1 cement : 2 coarse sand :4 graded stone aggregates 20mm nominal size). Note:- cost of C.C. 1:2:4 will be paid separately. |
| 19 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 20 | Small lintels not exceeding 1.5 m clear span, moulding as incornices, window sills, string courses, bands, copings, bedplates, anchor blocks and the like |
| 21 | Edges of slabs and breaks in floors and wallsUnder 20 cm wide |
| 22 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 23 | Finishing walls with Acrylic Smooth exterior paint of required shade : (a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 24 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush.(a)Red sand stone |
| 25 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : (a) With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 |
| 26 | 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) |
| 27 | Neat cement punning |
| 28 | Pumping out water from the vacant DDA land, gram sabha land and overflowing water bodies caused by heavy rainfall, river seepage, broken water mains or drains and disposal to nearby s.w. drain or land as directed by Engineer-in-Charge. Note: In this item, The rate is inclusive of cost of services of operating staff, diesel/petrol/kerosene oil, lubricating oil, providing & fixing discharge hose pipe & foot valve hose pipe. |
| 29 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground/ approved muncipal C&D waste recycle plant or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 30 | Estimated Cost after applying GST Correction Factor @.973 RS=. 75,65,481.10 Please Enable Macros to View BoQ information |