| 1 | Erection of 250KVA,11/0.4KV S/Stn |
| 2 | Erection of 250 KVA 11/.4 KV Substation complete in all respects including erection of steel tubular pole 9 mtr long,(double pole structure),with RCC muff Including digging of pit for a pole, Drilling of Holes In X Arms,Preparation of Platform Structure,Members Ci, Ai I.E. X0Arm & Knee Bracing Set, Concreting 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm, Erection of Platform, X0Arms, Drop0Out, 2 Nos Stay Set, of Jumper,Earthing for 3 Nos Earths,Digging of pit,Fixing of earth rod, clamp, earth wire and connecting to the structure, Providing Charcoal and Salt for the earthing, Filling of the pit with material, Providing Earthing Conn. To G.O Switch, Lightning Arrestor Etc.& Poles, Erection of LT Box, MCCB Switch, Cable, service Cable and Energy Meter, Providing earthing to the Transformer, LT Box, Meter Box etc, Barbed Wire & Painting, complete in all respects. |
| 3 | Chain link fencing angle iron, gate etc. for transformer frncing. |
| 4 | (B) Supply Part of 250KVA,11/0.4KV S/Stn |
| 5 | Distribution Transformer (Ordinary), 11/0.4 kV, 250 KVA |
| 6 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 7 | Muffs (2000mm) with concerete filling |
| 8 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 9 | Surge Arrester,9KV Station class (Porcelain type) |
| 10 | Stay set complete |
| 11 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 12 | Pipe Earthing Set |
| 13 | 6 SWG GI wire For Earthing |
| 14 | LT Distribution Panel Box with copper thimbles of 200 Amp, Insulating sleeves etc. MCCB 400 amp 3P 50kA -1 No. ICS 100 % ICU & MCCB 250 Amp 36 kA =3 nos. MS Sheet of 1.6 mm ( 1100x800x275 mm ) cubide Box complete with stand etc and Al Busbar 40x6 mm( min. 100 Amp ) , AI 50X50X6 mm of length 2.2 Mtr inside .painted /powder coated after primar coating |
| 15 | Half-Clamps (MS Flat 50x6mm) |
| 16 | Full Clamps(MS Flat 50x6mm) |
| 17 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 18 | Aluminium Thimble` |
| 19 | Copper Thimble 200A |
| 20 | Danger Plate |
| 21 | Barbed Wire |
| 22 | LT Cable 3.5X 120mm2, 1.1KVK XLPE Cable unarmoured |
| 23 | Providing HP All-in-One Desktop Systen 27\\" complete (intel core i5 13th gen, with 16GB Ram & 512 GB SSD) with accessories along with 1000VA UPS & Canon Image Class LBPb0308 printer. |
| 24 | Aluminium Paint |
| 25 | Red Oxide |
| 26 | Erection of LT Line |
| 27 | Erection of S/T pole 9 mtr long,(single pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 28 | Erection of earthing set |
| 29 | Erection of Stay Set LT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 30 | Sagging of 50sqmm conductor, comprising laying of Conductor, stringing & sagging, binding with insulator complete in all respects. |
| 31 | Sagging of GI wire |
| 32 | Supply /Material Part of LT Line : |
| 33 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 34 | Muffs with concerete filling |
| 35 | Shackle Insulator (16 kN) |
| 36 | D-Iron (U- Clamps) with nut and bolts |
| 37 | Earth Knob |
| 38 | Stay set complete in all respect |
| 39 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 40 | Earthing Set complete |
| 41 | Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3% (Sag, Cross Lacing and wastage)} @ 0.102 kg/m |
| 42 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 43 | Aluminium Paint |
| 44 | Providing Metravi ERT-1502 Digital Earth Resistance Tester with testing Kit & Cables |
| 45 | Red Oxide |
| 46 | Spiral PVC Spacer Please Enable Macros to View BoQ information |