| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 4 | Dumping stone including cost of stones. On Horizontal on level. |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work up to plinth level with :1:5:10 ( 1 cement :5 coarse sand :10 graded stone aggregate 40 mm nominal size ) |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete.50 mm thick with 20mm nominal size stone aggregate. |
| 10 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. |
| 11 | Steel work welded in built up sections/framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete. |
| 12 | Steel work welded in built up sections/framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete. |
| 13 | Supply and filling RBM in open area including levelling,watering and hand ramming and all carriages upto site of work complete |
| 14 | Engangement of Trained Labour/Waiter for Serving water |
| 15 | Providing of Mineral Water 250ML including Good Quality Disposal Glass |
| 16 | Providing of Mineral Water 1 Ltr including Borosill Glass(1 Ltr Bottel) |
| 17 | Supplying and stacking at site including royalty (Earth measured in stacks will be reduced by 20% for payment) |
| 18 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 19 | Foundations, footings, bases of columns etc. for mass concrete. |
| 20 | Suspended floors, roofs, landings, balconies and access platforms. |
| 21 | Carriage of material by M.T incl loading/unloading & stacking complete |
| 22 | Sand /Stone agg. below 40 mm nominal size avg. lead 11 km by MT Please Enable Macros to View BoQ information |