| 1 | BoQ BOQ Represent (%) Percentage having Above/ Below ( + or - denomination) the Lump sum pre price inserted by MES BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority : GARRISON ENGINEER TEZPUR (NORTH) NAME OF WORK : REPAIR/REPLACEMENT OF AIR CONDITIOERS, REFRIGERATORS, WATER COOLERS, COLD STORAGE PLANT WITH CONNECTED WORKS AT NAA AND REPAIR/REPLACEMENT OF SOLAR WATER HEATERS, SUMMER APPLIANCES WITH CONNECTED WORKS AT AGE CHARDUAR UNDER GE (N) TEZPUR Contract No : GE(N)/TEZ/ OF 2026-2027 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Ser.No. Description of items of works Item Code / Make Approx No. of quentity required. Units Pre Priced Rate (in. Rs.) as Defined by MES Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures to be entered by the Bidder Rs. P. Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT (In INR) TOTAL AMOUNT With Taxes TOTAL AMOUNT (In Words) |
| 2 | S&F in repair compressor unit of water cooler, storage type 40/80 litres capacity including necessary cutting, welding complete with all fixing accessories as required and as directed. Note - Leakage testing, flushing of system and charging of gas shall be measured and paid separately under relevant items here in after complete all as specified and directed. |
| 3 | S&F in repair for flushing of the refrigerator system of water cooler 40/80 ltr capacity with dry nitrogen , replacement of capillary tube, strainer and drier of required size and , assembling the system, after applying appropiate vacuum upto (-) 75cm column of mercury, complete all as specified and as directed . |
| 4 | M&L for recharging of gas in compressor of water cooler 40/80 ltr capacity with refrigerant gas R- 22/134 (a) as required and testing the water cooler with satisfactory cooling effects after installing at indicated location complete all as specified and as directed . |
| 5 | S&F in repair thermostate ISI marked for water coolers of 40/80 ltrs capacity complete all as specified and directed. |
| 6 | S&F in repair Over load relay (OLR) for water coolers of 40/80 ltrs capacity complete complete all as specified and directed. |
| 7 | S&F in repair starting capacitor (SC) 40/60 Mfd for water cooler 40/80 ltr capacity complete all as specified and directed. |
| 8 | S&F in repair PVC float valve assembly 15mm dia for water cooler 40/80 ltrs capacity complete all as specified and directed. |
| 9 | S&F in repair push tap assembly 15 mm dia chromium plated for water cooler 40/80 ltr capacity complete all as specified and directed. |
| 10 | S&F in repair blower fan motor of water cooler of capacity 40/80 Litres complete all as specified and directed |
| 11 | M&L for Preparation of old painted surfaces of water cooler of 40/80 Litres capacity including compressor and applying one coat of approved synthetic enamel paint to body of water cooler and one coat of black paint to compressor, by using spray painting machine, complete all as specified and directed. |
| 12 | S&F in repair compressor unit of refrigerator 180 to 310 litres capacity including necessary cutting welding complete with all fixing accessories as required and as directed. Note - Leakage testing, flushing of system and charging of gas shall be measured and paid separately under relevant items here in after complete all as specified and directed. |
| 13 | M&L for recharging of gas in compresssor of refrigerator 180 to 310 litres capacity with refrigerant gas 134 (A) as required and testing the refrigerator with satisfactory cooling effects after installing complete all as specified and directed. |
| 14 | S&F in repair thermostate (defrost type), ISI marked for refrigerators 180 to 310 litres capacity complete all as specified and directed |
| 15 | S&F in repair Lamp, (screw/pin type) as required suitable for refrigerator of 180 to 310 litres capacity complete all as specified and directed |
| 16 | S&F in repair cooling chamber as per existing model for refrigerator of 165 to 310 litres capacity complete all as specified and directed |
| 17 | S&F in repair magnetic door Gasket suitable for refrigerator 180 to 310 litres capacity complete all as specified and directed |
| 18 | S&F in repair chiiler door suitable for regrigerator 180 to 310 litres capacity complete all as specified and directed |
| 19 | S&F in repair chiller tray suitable for regrigerator 180 to 310 litres capacity complete all as specified and directed |
| 20 | S&F in repair vegetable/fruit tray suitable for refrigerator 180 to 310 litres capacity complete all as specified and directed |
| 21 | S&F in repair Over load relay (OLR) for refrigerators 180 to 310 litres capacity complete all as specified and directed. |
| 22 | S&F in repair blower fan motor of 180 to 310 litres capacity Refrigerator complete all as specified and directed . |
| 23 | Servicing on site of complete out door /indoor unit of Split type AC 1.5 to 2 TR capacity after removing electric connection by cleaning of condensor coil, evaporator coil, blower & motor, air filter, louver, other connected accessories and replacemement of unserviceable screws, nuts,bolts, washers from the body of the ACs by providing new one and making the same perfectly tight and noiseless during operation complete all as specified and directed. Note. Spare/parts, components required will be measured and paid separately under relevant items here-in-after as supply only complete all as specified and directed. |
| 24 | Supply only room sensor suitable for Split type /Window type AC of capacity 1.5 TR to 2 TR ,complete all as specified. |
| 25 | Supply only coil sensor suitable for Split/window type AC of capacity 1.5 TR to 2 TR ,complete all as specified. |
| 26 | Supply only air filter suitable for split type AC of capacity 1.5 TR to 2 TR ,complete all as specified. |
| 27 | S&F in repair blower fan motor of Split type AC of capacity 1.5 TR to 2 TR complete all as specified and directed |
| 28 | S&F in repair Power Control board (PCB) Inverter type or as per site complete for 1.5 TR to 2 TR split type AC complete all as specified and directed. |
| 29 | S&F in repair Outdoor unit condenser coil (copper) complete for 1.5 TR split type AC complete all as specified and directed. |
| 30 | S&F in repair Indoor unit cooling coil (copper) complete for 1.5 TR split type AC complete all as specified and directed. |
| 31 | S&F in repair sealed compressor unit for Split type AC 1.5 TR capacity including necessary cutting, welding with all fixing accessories as required complete all as specified and directed. Note - Leakage testing, flushing of system and charging of gas shall be measured and paid separately under relevant items here in after complete all as specified and directed. |
| 32 | S&F in repair sealed compressor unit for Split type AC 2 TR capacity including necessary cutting, welding with all fixing accessories as required complete all as specified and directed. Note - Leakage testing , flushing of system and charging of gas shall be measured and paid separately under relevant items here in after complete all as specified and directed. |
| 33 | M&L Leakage testing of compressor of Split type AC 1.5 to 2 TR capacity by dry nitrogen complete all as specified and directed . |
| 34 | M&L for flushing of the refrigerator system ie refrigerant coil of evaporator, condensor and interconnecting copper tube of Split type AC 1.5 TR to 2 TR capacity with dry nitrogen flushing upto vacuum (- 75 cm) column of mercury & replacement of old strainer /drier by new one as per existing size, complete all as specified and directed . |
| 35 | M&L Re-Charging of gas refrigerant R-22 to split type AC of 1.5TR to 2.00 TR capacity on full load, checking automatic cut-out, setting of room temperature and testing complete all as specified and directed . |
| 36 | Servicing in situ of complete window type air conditioner 1.5 TR to 2 TR capacity after removing electric connection by cleaning of condensor coil, evaporator coil, blower & motor ,air filter , louver ,other connected accessories and replacemement of unserviceable screws, nuts,bolts, washers from the body of the ACs by providing new one and making the same perfectly tight and noiseless during operation complete all as specified and directed. Note - Spare/parts components required will be measured and paid separately under relevant items here-in-after as supply only complete all as specified and directed. |
| 37 | Supply only Multi Capacitor upto 65 Mfd for Split / window type AC capacity 1.5 TR to 2.00 TR, complete all as specified. |
| 38 | S&F in repair Power control board ( remote circuit)complete for 1.5 TR to 2 TR window type AC complete all as specified and directed. |
| 39 | Supply only thermostate ISI marked suitable for window type AC capacity 1.5 TR to 2 TR ,complete all as specified. |
| 40 | Supply only air filter suitable for window type AC of capacity 1.5 TR to 2 TR ,complete all as specified. |
| 41 | S&F in repair blower fan motor for window type AC of capacity 1.5 TR to 2 TR ,complete all as specified and directed. |
| 42 | S&F in repair condenser coil (copper) complete for 1.5 TR Window AC complete all as specified and directed. |
| 43 | S&F in repair Cooling coil (copper) complete for 1.5 TR Window type AC complete all as specified and directed. |
| 44 | S&F in repair sealed compressor unit for Window type AC 1.5 TR capacity including necessary cutting, welding with all fixing accessories as required complete all as specified and directed. Note - Leakage testing, flushing of refregerator system and charging of gas shall be measured and paid separately under relevant items here in after complete all as specified and directed. |
| 45 | S&F in repair sealed compressor unit for Window type AC 2 TR capacity including necessary cutting, welding with all fixing accessories as required complete all as specified and directed. Note - Leakage testing, flushing of refregerator system and charging of gas shall be measured and paid separately under relevant items here in after complete all as specified and directed. |
| 46 | M&L Leakage testing of compressor of Window type AC 1.5 to 2 TR capacity by dry nitrogen complete all as required and directed. |
| 47 | M&L for flushing of the refrigerator system ie refrigerant coil of evaporator, condensor and interconnecting copper tube of Window type AC 1.5 TR to2 TR capacity with dry nitrogen flushing upto vacuum (-) 75 cm column of mercury & replacement of old strainer or drier by new one as per existing size, complete all as specified and directed . |
| 48 | M&L for Preparation of old painted external surfaces of window type AC 1.5TR to 2 TR capacity including compressor and applying one coat of approved synthetic enamel paint to body of window AC and one coat of black paint to compressor, by using spray painting machine, complete all as specified and directed. |
| 49 | M&L Re-Charging of gas refrigerant R-22 to 1.5TR to 2.00 TR capacity Window type AC on full load, checking automatic cut-out and setting of room temp and testing complete all as specified and directed . |
| 50 | S&F in repair compressor unit for Deep Freezer capacity 320 Ltr including necessary cutting welding complete with all fixing accessories as required and as directed. Note. Leakage testing , flushing of refregerator system and charging of gas shall be measured and paid separately under relevant items here in after complete all as specified and directed. |
| 51 | M&L for Leakage testing of compressor of deep freezer 320 ltr capacity by dry nitrogen complete all as specified and directed. |
| 52 | M&L for flushing of the refrigerator system of deep freezer 320 ltr capacity with dry nitrogen and replacement of old capillary tube strainer and drier by new one of required size, assembling the system, after applying appropiate vacuum upto (-) 75cm column of mercury complete all as specified and as directed . |
| 53 | M&L for recharging of gas in compresssor of Deep freezer 320 litre capacity with refrigerant gas R-22 as required and testing the deep freezer with satisfactory cooling effects after installing at indicated location complete all as required and directed . |
| 54 | S&F in repair over load relay (OLR) for Deep Freezer of 320 Ltrs capacity complete all as specified and directed. |
| 55 | S&F in repair starting capacitor 100/120 Mfd for Deep Freezer of 320 Ltrs capacity complete all as specified and directed. |
| 56 | S&F in repair thermostate suitable for Deep Freezer of 320 Ltrs capacity, complete all as specified and directed. |
| 57 | S&F in repair blower fan motor of Deep Freezer of 320 Litres capacity complete all as specified and directed. |
| 58 | M&L for complete servicing of walk in freezer refrigeration unit air cooled with semi hermatic condensing units of capacity 25643 BTU/Hr of make blue star complete all as specified and directed. |
| 59 | Supply and filling of refrigerant gas R-404R for walk in freezer refrigeration unit air cooled with semi hermatic condensing unit complete all as specified and directed. |
| 60 | Supply and fixing in replacement three phase relay (as per existing model/make in control/display panel of walk in freezer) complete all as specified and directed. |
| 61 | Supply and fixing in replacement 3/4 phase power contactor (as per existing model/make L&T NC1 1801 in control/display panel of walk in freezer) complete all as specified and directed. |
| 62 | S&F in repair voltage stabilizer of capacity 4 KVA ,220 V for water coolers and deep freezers etc. complete all as specified and directed. |
| 63 | S&F in repair voltage stabilizer of capacity 5 KVA ,220 V for window ac and split ac complete all as specified and directed. |
| 64 | Taking out compressor from water cooler of capacity 40/40 litres/Hrs of any make by cutting of suction and discharge lines for carrying out necessary repairs to the water cooler base such as renewal of MS angle iron, base plate, nuts , washers, bolts,rubber grooves and refixing it including painting with two coats of synthetic enemeeled paint of existing shade complete complete all as specified and directed. |
| 65 | Taking out compressor from water cooler of capacity 40/80 litres/Hrs of any make by cutting of suction and discharge lines for carrying out necessary repairs to the water cooler base such as renewal of MS angle iron, base plate, nuts , washers, bolts,rubber grooves and refixing it including painting with two coats of synthetic enemeeled paint of existing shade complete complete all as specified and directed. |
| 66 | Taking out compressor from water cooler of capacity Upto 120 Lts capacity of any make by cutting of suction and discharge lines for carrying out necessary repairs to the water cooler base such as renewal of MS angle iron, base plate, nuts , washers, bolts,rubber grooves and refixing it including painting with two coats of synthetic enemeeled paint of existing shade complete complete all as specified and directed. |
| 67 | Dismantling of unserviceable compressor of any make/model from deep frezer including disconnecting suction / Discharge copper tubing and supply & fixing new compressor (sealed unit) with nuts, bolts, rubbers grommet and washer, connecting copper tubing by welding flare nuts, detecting leak and repairs if any flushing and pressure testing by nitrogen & etc. vacuumising, charging with non CFC refrigerant gas of 40/40 ltrs/Hrs capacity water cooler of any make & Model complete all as directed by Engineer-in-Charge. |
| 68 | Ditto all as above but of capacity 40/80 ltrs capacity. |
| 69 | Ditto all as above but of capacity 120 ltrs capacity. |
| 70 | Supply & fixing (in repairs) CP Brass push cock (inner or outer threaded) of 15 mm bore size complete all as directed by the Engineer-in-Charge. |
| 71 | Renewal of 32 mm PVC pipe with clip and strainer tee Elbow all as specified and directed by Engineer-in-Charge |
| 72 | Supply & fixing (in repairs) starting relay for 40 ltrs/hr water cooler complete all as specified and directed . |
| 73 | Supply & fixing starting relay for 80 ltrs/hr water cooler complete all as specified and directed . |
| 74 | Supply & fixing starting relay for 120 ltrs/hr water cooler complete all as specified and directed . |
| 75 | Supply & fixing running capacitor of capacity 10/15 mfd (conforming to IS:2993 - 1975) AC 240 volts in plastic container of following capacities complete all as specified and directed. |
| 76 | Supply & fixing running capacitor of capacity 25 mfd (conforming to IS:2993 - 1975) AC 240 volts in plastic container of following capacities complete all as specified and directed. |
| 77 | Supply & fixing overload protector for 40/80 ltrs water cooler complete all as specified and directed . |
| 78 | Taking out defective blower motor with blade and supply & fixing new blower motor with blade AC 240 volts, 50 HZ single phase, complete all as specified and directed. |
| 79 | S&F of condensing coil of any make all as specified and directed by Engineer-in-Charge. |
| 80 | Checking of leakage in refrigerant system of refrigerator of 165/170/180 litres capacities by putting nitrogen pressure, identifying the leak, rectifying the leak/defects by brazing and testing, vacuuming the system including charging refrigerant gas Non CFC in required quantity all as directed by Engineer-in-Charge. |
| 81 | Checking of leakage in refrigerant system of refrigerator of 286/300/310 litres capacities by putting nitrogen pressure, identifying the leak, rectifying the leak/defects by brazing and testing, vacuuming the system including charging refrigerant gas Non CFC in required quantity all as directed by Engineer-in-Charge. |
| 82 | S&F starting relay, open type for refrigerator of capacity 165/170/180/300/310 litres all as directed by Engineer-in-Charge. |
| 83 | S&F over load protector for 1/6 HP refrigerator of capacity 165/300 /310 litres all as directed by Engineer-in-Charge. |
| 84 | S&F thermostat defrost type for refrigerator complete all as specified and directed. |
| 85 | S&F thermostat non defrost type for refrigerator complete all as specified and directed. |
| 86 | Supply and fixing starting capacitor of 80-120 Mfd capacity in plastic /metal container complete all as specified and directed. |
| 87 | Supply and fixing starting capacitor of 120-150 Mfd capacity in plastic /metal container complete all as specified and directed. |
| 88 | Supply and fixing running capacitor 36 Mfd to 50 Mfd capacity in plastic container complete all as specified and directed. |
| 89 | Supply and fixing starting relay for 1.5TR/2 TR compressor complete all as specified and directed. |
| 90 | Supply and fixing over load protector for 1.5TR/2TR compressor complete all as specified and directed. |
| 91 | Supply and fixing thermostate switch for 1.5TR/2TR split AC complete all as specified and directed. |
| 92 | Supply and fixing swing motor for 1.5TR/2TR Indoor unit of any make of existing capacity complete all as specified and directed. |
| 93 | Supply and fixing Swing Motor for 1.5TR/2TR window type AC of any make/model complete all as specified and directed. |
| 94 | Supply and fixing reverse cycle solenoid valve in split/window type AC 1.5 /2 TR capacity with necessary extension to suction / discharge copper tubbing & toggle switch complete all as specified and directed. |
| 95 | Supply and fixing suction copper pipe line heavy duty 1/2'' dia with puff insulation and flair nuts from indoor to outdoor unit of split AC 1.5 /2 TR capacity complete all as specified and directed. |
| 96 | Supply and fixing suction copper pipe line heavy duty 1/4'' dia with puff insulation and flair nuts from indoor to outdoor unit of split AC 1.5TR/2TR capacity complete all as specified and directed. |
| 97 | Supply and fixing copper Gas filter for AC 1.5TR/2TR capacity complete all as specified and directed. |
| 98 | Supply and fixing PVC pipe nylon imbraided 15 mm dia for condenser water drain with clamps/ concealed in wall complete all as specified and directed. |
| 99 | Dismantling of defective indoor unit of 1.5 TR capacity split type AC and supply & fixing indoor unit of the same capacity with blower motor . Front grill and connecting the copper tubing by brazing detecting leak and rectifying the same and recharging with Non CFC refrigerant gas as required the unit in wall/ ceiling mounted complete all as specified and directed. |
| 100 | Dismantling of defective condensing unit of split type AC of 1.5 TR capacity and supply & fixing new condensing unit complete with condensing coil, coil frame , wiring kit and running capacity , relay condensing motor with blade complete all as directed. Make:AS per site requirement. |
| 101 | Material & labour for servicing of indoor and outdoor unit by means of electric blower and water under pressure cleaning & washing of condensing coil / cooling by soap solution or recommended chemical, oiling & greasing of moving parts such as blower motor etc. complete of 1.5 TR capacity window type AC complete all as specified and directed. |
| 102 | Material & labour for servicing of indoor and outdoor unit by means of electric blower and water under pressure cleaning & washing of condensing coil / cooling by soap solution or recommended chemical, oiling & greasing of moving parts such as blower motor etc. complete of 2 TR capacity window type AC complete all as specified and directed. |
| 103 | Dismantling of burnt blower motor of 1.5 TR split AC (indoor unit) and supply & fixing blower motor of same manufacturer of AC of make of AC Carrier/Voltas /Blue star as per sample complete all as specified and directed. |
| 104 | Supply and charging (Top up) the AC unit of 1.5 TR/ 2 TR split type AC unit with Refrigeration Gas non CFC compatible to R-22/R-32 in required Qty complete all as specified and directed. |
| 105 | Supply and fixing of suction valve size 1/2\\" complete all as specified and directed. |
| 106 | Supply and fixing of discharge valve size 1/4'' complete all as specified and directed. |
| 107 | Supply and fixing of rubber coupling mounting for blower motor of split type AC all as per directed by EIC |
| 108 | Supply and fixing of air filter made out Nylon suitable for 1.5 TR split/window AC capacity air conditioners of any Make and model all as directed. |
| 109 | Carrying out pressure leak test of split Acs 1.5 /2.0 TR by Nitrogen gas pressure for detecting leak in cooling unit refrigerant pipe and repairing the leak by wilding or brazing of cooling unit and refrigerant pipe , putting under pressure for leak checking after repairs of leak pipe including gas charging transporting & carrying out Tools and Plant required at site complete all as specified and directed. |
| 110 | Carrying out pressure leak test of 1.5 TR window AC by Nitrogen gas pressure for detecting leak in cooling unit refrigerent pipe and repairing the leak by welding or brazing of cooling unit and refrigerant pipe, putting under pressure for leak checking after repairs of leak pipe including gas charging transporting & carrying out Tools and Plant required at site complete all as specified and directed. |
| 111 | Dismantling of defective worn out wiring of indoor unit of window/split AC of capacity 1.5 TR/2TR, Supply and fixing PCB ( Printed circuit Board) & Visual Eye demo plate remote hand set to suit/match the existing system complete all as specified and directed. |
| 112 | Compressor reciprocating suitable for window type AC 1.5 TR (Original sealed unit is to supply) of specified make as approved by GE. |
| 113 | S&F in replacement sheet metal enclosure with metallic socket and MCB single pole 32 Amp and metallic plug top connected from mains to AC all as specified and directed . |
| 114 | S&F repairs metallic plug top of 16 Amps connected from mains to AC complete all as specified and directed. |
| 115 | Dismantling of defective cooling coil of 1.5 TR window type AC of any make and S&F cooling coil for AC, detecting the leakage with N2 Gas , reconnecting in to the system complete all as specified and directed. |
| 116 | Dismantling of defective condensing coil of 1.5 TR window type AC of any make and S&F condensing coil for AC, detecting the leakage with N2 Gas, reconnecting in to the system complete all as specified and directed. |
| 117 | Dismantling of burnt blower motor of 1.5 TR /2 TR window AC and supply & fixing new blower motor, double shaft, 1/6 or 1/8 HP as per sample complete including making necessory electrical connection with suitable size copper conductor wire complete all as specified and directed. |
| 118 | Dismantling of burnt blower motor of 1.5 TR/ 2 TR split AC ( outdoor unit) and supply & fixing new blower motor, as per sample complete including making necessory electrical connection with suitable size cooper conductor cable complete all as specified and directed. |
| 119 | Supply and fixing of aluminium blower / fan blade with alminium alloy bush, screw for window Acs complete as required at site all as specified and directed. |
| 120 | Supply and fixing PVC Knob of window type AC complete all as specified and directed. |
| 121 | Supply and fixing of Selector Switch of window type AC complete all as specified and directed. |
| 122 | Supply and fixing repairs front grill quantity for window AC of 1.5 TR /2TR of Make National / Cosmo complete all as specified and directed. |
| 123 | Supply and fixing of PVC insulated three core stranded copper cable of size 80/20 complete all as specified and directed. |
| 124 | M&L for servicing of window type AC 1.5 TR/2.0 TR capacity by means of electric blower and water under pressure cleaning & washing of condensing coil/cooling coil by soap solution or recommended chemical, coiling & greasing of moving parts such as blower motor etc complete of following capacity complete all as specified and directed. |
| 125 | Supply and fix refrigerant gas Non CFC equivalent to R-22/R-32 a in returnable sealed cylinder all specified and directed. |
| 126 | Supply and fixing indication lamp in voltage stabilizers of any capacity complete all as specified and directed. |
| 127 | S&F 2 Meter long conductor cable 3 core PVC insulated and sheathed 80/0.20 (2.5 sqmm) size duly fitted with 3 pin top, 20 Amps all as specified.Note: The servicing/repair of Water cooler,refrigerator ,deep freezer,AC of any make and size may required item as per existing ground size and executed at all sector under AGE charduar area. |
| 128 | Taking dwon and re fixing as per side requirement for 1.5/2 ton Window AC after minor repair complete all as specificfied and directed by Engr-in Charge |
| 129 | Taking dwon and refixing as per side requirement for 1.5/2 ton Spilit AC after minor repair complete all as specificfied and directed by Engr-in Charge |
| 130 | Repair /maint for servicing of soler water heater including heating elements and other conneted items complete all as specified and directed by Engr in Charge . Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |