| 1 | Dismantling Old Dameaged brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). (SOR UP PWD Supply SI - 692) |
| 2 | Supply and Fixing of Nala Bandh by Ganny Bages |
| 3 | Dwatering wate upto deep groung level rate also i/c the hier fuel operater T&P for using 2 No of pumping set for disposal of water to the required points & other all arrengments for disposal of water complete For 30 day (8 houres only) |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M. and lead upto 30 M. and including filling watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches. |
| 5 | Extar Rate for Earth Work & Excavation under Water and under liquid mad 25 % of 90 Rupies |
| 6 | Disposal of Excavated Soil up to 5.00 KM distance complete with labour T&P ETC at site. S.I-231(a) 100% Disposal of Excavated Material (Average Diatance from all Sides of City) |
| 7 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 273) |
| 8 | R.C.C. Work with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SOR UP PWD SI - 284a) |
| 9 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape as necessary inclding bending for proper complition of the work and including supply of all steel & wastage, bend, hooks and authorised overlapping hall be measured.(As per analysis) in Pulia |
| 10 | Earth work in filling in ordinary soil by carted earth beyond 5.00 Km.extra lead from site(As per analysis) |
| 11 | M-150Brick work in one cement & Four course sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 305) |
| 12 | 12 mm thick plaster with cement and ccorse sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc. (SOR UP PWD SI -584a) |
| 13 | Cement Concrete with 2c.m.gauge approved slone balliast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI -501a) |
| 14 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work. Same as in item 502 above but in M.S. Grills / Stair case railing / gates / trusher / racks etc. (SOR UP PWD SI -279A) |
| 15 | Painting roofs or other iron work in large areas with one coat priming and one coat of approved (above one Sq. Metre) paint (British antesol or equivalent) including supply of all materials, labour, Tools&plants etc. required for proper completion of the work. Paint to be used IS SOR No 645 |
| 16 | Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour,Tools&plantetc. Required for proper completion of the work.New Item |
| 17 | Cement Concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.50:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in ncrete mixture /Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. (UP PWD SOR - New Item -9) |
| 18 | Deduction cost of old brick (SOR UP PWD Supply SI - 1A) |
| 19 | Deduction cost of old brick bat (SOR UP PWD Supply SI - 1F) |
| 20 | Add 18%GST Please Enable Macros to View BoQ information |