Bids Are invited for Structural Audit Of Building No P 187 Mast Dept At Naval Dockyard Mumbai
Tender Overview
Project Description
Bids Are invited for Visual Inspection - Visual inspection and photography performing a visual survey of the building and recording/maping on drawing to assess extent of spelled concrete, cracked concrete, honey combing, reinfocement corrosion, delaminated concrete etc, taking photographs and videos to collect evidence of damage to structure. , Ultrasonic pulse velocity test - Ultrasonic pulse velocity test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 1 by portable ultrasonic non destructive digital test equipment including chipping out plaster at strategic locations. , rebound hammer test - Rebound hammer test in accordance with IS 516 Part-5 2018 SECTION 4 by portable rebound hamme equipment at strategic locations. , Core test - Core cutting and compression test for RCC structure in accordance with IS 516 on RCC members. 70 mm core cutting in reinforcement concrete, core filling by speialized epoxy material/micro concrete with bond coat at strategic locations. , reinforcement mapping - Reinforcement mapping test on RCC members to assess covers, spacing of bars including approximate diameter at strategic locations. , chemical test - Chemical test for RCC structure in accordance with IS 456 2000 using ready made kits and reagents. Sample collected will be from half cell/carbonation powder. (i) Determination of PH value. (ii) Determination of water soluble sulphates. (iii) Determination of water soluble chlorides contents at strategic locations. , half cell potential test - Half cell potential test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 2 half cell potential to assess the probability of corrosion of reinforcement at strategic locations. , carbonation test - Carbonation test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 3 corbonation test to measure extent of carbonation from the concrete surface at strategic locations. , structure status - To check & confirm present status of structure on basis on NDT results & visual inspection. Note Consultant should mention effect if additional load for construction of framed structure on the roof can be applied on the structure while submitting the Report. , recommendation - To provide recommendation for structrue repairs and technical specification. Preparing bill of quantities for the repair etc. All as specified and directed. , Vetting - Vetting of report from IIT/ NIT/Govt college of Engg Total Quantity : 134
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Visual Inspection | Visual inspection and photography performing a visual survey of the building and recording/maping on drawing to assess extent of spelled concrete, cracked concrete, honey combing, reinfocement corrosion, delaminated concrete etc, taking photographs and videos to collect evidence of damage to structure. |
| 2 | Ultrasonic pulse velocity test | Ultrasonic pulse velocity test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 1 by portable ultrasonic non destructive digital test equipment including chipping out plaster at strategic locations. |
| 3 | rebound hammer test | Rebound hammer test in accordance with IS 516 Part-5 2018 SECTION 4 by portable rebound hamme equipment at strategic locations. |
| 4 | Core test | Core cutting and compression test for RCC structure in accordance with IS 516 on RCC members. 70 mm core cutting in reinforcement concrete, core filling by speialized epoxy material/micro concrete with bond coat at strategic locations. |
| 5 | reinforcement mapping | Reinforcement mapping test on RCC members to assess covers, spacing of bars including approximate diameter at strategic locations. |
| 6 | chemical test | Chemical test for RCC structure in accordance with IS 456 2000 using ready made kits and reagents. Sample collected will be from half cell/carbonation powder. (i) Determination of PH value. (ii) Determination of water soluble sulphates. (iii) Determination of water soluble chlorides contents at strategic locations. |
| 7 | half cell potential test | Half cell potential test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 2 half cell potential to assess the probability of corrosion of reinforcement at strategic locations. |
| 8 | carbonation test | Carbonation test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 3 corbonation test to measure extent of carbonation from the concrete surface at strategic locations. |
| 9 | structure status | To check & confirm present status of structure on basis on NDT results & visual inspection. Note Consultant should mention effect if additional load for construction of framed structure on the roof can be applied on the structure while submitting the Report. |
| 10 | recommendation | To provide recommendation for structrue repairs and technical specification. Preparing bill of quantities for the repair etc. All as specified and directed. |
| 11 | Vetting | Vetting of report from IIT/ NIT/Govt college of Engg |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender