|
| 1 | Desilting of road side Storm Water drains, seasonal flow open drains, covered drains, culverts, pipe drain etc. by excavation and taking out silt, sludge, building rubbish, earth mixed malba, plastic bags & all type of floating, solid and semi- solid malba/ rubbish by manual or any other suitable mechanical method and disposal of this desilted material, sludge, building rubbish, earth mixed malba, plastic bags & all type of floating, solid and semi- solid malba/ rubbish received after desilting of drains for all lifts & lead upto 50 meters as per the direction of Engineer-in-charge. The rate includes all the above operations. The payment of this item will be made on submission of weekly album 2nos of at least 20 coloured photographs (2 hard copies of each coloured photograph of postcard size) and a digital soft copy of the entire album Initial Cleaning/1st operation of desilting as per the instructions of Engineer-in-charge |
| 2 | Drains upto 600mm in width and all depths |
| 3 | Drains above 600mm upto 1200mm in width and all depths |
| 4 | Drains above 1200mm in width and all depths |
| 5 | Desilting of road side Storm Water drains, seasonal flow open drains, covered drains, culverts, pipe drain etc. by excavation and taking out silt, sludge, building rubbish, earth mixed malba, plastic bags & all type of floating, solid and semi- solid malba/ rubbish by manual or any other suitable mechanical method and disposal of this desilted material, sludge, building rubbish, earth mixed malba, plastic bags & all type of floating, solid and semi- solid malba/ rubbish received after desilting of drains for all lifts & lead upto 50 meters as per the direction of Engineerin-charge. The rate includes all the above operations. The payment of this item will be made on submission of weekly album 2nos of at least 20 coloured photographs (2 hard copies of each coloured photograph of postcard size) and a digital soft copy of the entire album 2nd operation to be carried out as per the instructions of Engineer-in-charge |
| 6 | Drains upto 600mm in width and all depths |
| 7 | Drains above 600mm upto 1200mm in width and all depths |
| 8 | Drains above 1200mm in width and all depths |
| 9 | Hiring & operation of Hydraulic Excavator JCB Machine capacity 3D for 8 hours a day inculding driver, diesel, mobile oil etc. all complete, as per direction of Engineer-in-charges. |
| 10 | Providing sand bags using old empty cement PVC bags filled with Jamuna Sand to stop flow of drain water in open & closed drain as per direction of Engineer-in-Charge. |
| 11 | Desilting and taking out of debris silt rubbish etc. from drain/ sump of all size and diameter (Rectangular/Circular), which are heavily surcharged, by super sucker machine which consist of ( one No. chassis mounted machine having suction capacity of minimum 4000 cum/hrs at 80% vacuum, 2 No. chassis mounted dump tanks having capacity of 10 cum i/c) safe disposal of silt with in municipal limits. The operations of desilting should be videographed at each location of super sucker for a period of minimum 10 minutes per day basis and providing three sets of CD/ pendrive as directed by Engineer in charge.The operation should also be photographed at each location, minimum ten photographs on per day basis and giving three sets of photographs. supply of all materials, labour, T & P, temporary power connection with stand by generation set of capacity at least 62.5 KVA gas detector, forced air ventilators wherever required etc. and provision of safety equipment as per guide line laid in ( IS-11972*1987), international standard, traffic control arrangement and proper lighting at night, barricading , display of signboard, insurance of worker ensuring all safety measures/precautions and cleaning of site. Removal of all hindrances obstructions, unforeseen items, permission from other deptt. (Deptt. will only assist in getting the permission etc.) cutting of bituminous road , excavation, demolishing of brick work/ CC/ RCC wherever required and restoring the same. All inclusive and nothing extra be payable. The super sucker machine shall be called as per requirement at various locations. |
| 12 | Added for Extra cartage of manure or sludge by Mechanical Transport including loading, unloading and stackin beyond 5 Km upto 10 km. Actual distance from IIT Roorkee . |
| 13 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 14 | Cleaning and desilting of gully trap chamber, including removal of rubbish mixed with earth etc. and disposal of same, all as per the direction of Engineer-in-charge. |
| 15 | Cleaning of chocked sewer line by diesel running vehicle mounting hydraulic operated high pressure suction cum jetting sewer cleaning machine fitted with pump having 4000 litres suction capacity and 6000 litres water jetting tank capacity including skilled operator, supervising engineer etc. for cleaning and partial desilting of manholes and dechocking of sewer lines. Dechocking and flushing of sewer line from one manhole to another by high pressure jetting system of 2200 PSI for sewer line from 150mm dia upto 300mm |
| 16 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved |
| 17 | For Calculation purpose Only |
| 18 | Sub Total (A) Please Enable Macros to View BoQ information |