|
| 1 | Dismantling Brick work /stone work/cement mortar I/c all completion of work |
| 2 | Deduction of brick bat |
| 3 | Deduction of old brick bat |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift, lead, filling, watering, ramming, and disposal of surplus earth. |
| 5 | C.C 1:6:12 with in cement and fine sand and 4 cm gauge brick ballast in all work complete.(S.I. No. 273) |
| 6 | M-150 class brick work in 1:4 cement and fine sand mortar in all complete(S.I. No. 305) |
| 7 | 12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. SI No.584 (A) |
| 8 | Cement Concrete with 2.0 cm. gaug;e Approved stone grid coarse sand & cement in the proportion of 4:2:1 including , T&P etc. S.I. 279 (a) |
| 9 | R.C.C. work with cement, coarse sand, and 2cm gauge stone grit (1:1.5:3) in lintels, including bending, binding, centering, and shuttering. |
| 10 | M.S. (tor steel or plain) reinforcement work including bending, hooks, and binding wire. |
| 11 | M.S. or iron work. |
| 12 | MAKING OF BANDHA IN DRAIN BY FILLING SAND GUNNY BAGS |
| 13 | DEWATERING OF SLUDGE WATERING BY DIESEL PUMP SET, 8HRS IN DAY |
| 14 | Disposal of waste malba from site up to 5.0km. |
| 15 | Site Clearence |
| 16 | C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete (S.I. No. 279 (a)) |
| 17 | Relaying interlocking concrete Block pavement having thickness 80 mm as per drawings and technical specification Clause 1504.(Exclusive G.S.B) SI No.CH-20 NI-14 |
| 18 | Painting or varnishing work on new wood or small areas with priming coat and superior quality ready-mixed paint. |
| 19 | Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour,Tools&plantetc. Required for proper completion of the work. |
| 20 | Add 18%GST Please Enable Macros to View BoQ information |