| 1 | CARRIAGE OF 11/9 /8.5 MTR.PCC/ ST POLE FROM ESC HASARI TO DIFFERENT CONSUMER WORK SIDE. | CARRIAGE OF 11/9 /8.5 MTR.PCC/ ST POLE FROM ESC HASARI TO DIFFERENT CONSUMER WORK SIDE. |
| 2 | CARRIAGE OF LINE MATERIAL VIZ. CONDUCTOR ,11 KV XLPE CABLE,AB CABLE, STAY ROD, EARTHING ROD, G I WIRE, STAY WIRE AND OTHER LINE MATERIAL. | CARRIAGE OF LINE MATERIAL VIZ. CONDUCTOR ,11 KV XLPE CABLE,AB CABLE, STAY ROD, EARTHING ROD, G I WIRE, STAY WIRE AND OTHER LINE MATERIAL. |
| 3 | ERRECTION OF 11/9 MTR. PCC/ST POLE POLE WITH FIXING OF ALL ACCESSORIES INCLUDING IT'S GRAUTING | ERRECTION OF 11/9 MTR. PCC/ST POLE POLE WITH FIXING OF ALL ACCESSORIES INCLUDING IT'S GRAUTING |
| 4 | ERECTION AND GRAUTING OF DOUBLE POLE STRUCTURE WITH COMPLITE FITTING OF ALL ACCESSORIES. | ERECTION AND GRAUTING OF DOUBLE POLE STRUCTURE WITH COMPLITE FITTING OF ALL ACCESSORIES. |
| 5 | ERECTION OF TRI-POLE STRUCTURE WITH FIXING OF ALL ACCESSORIES INCLUDING CONCRETING OF POLES. | ERECTION OF TRI-POLE STRUCTURE WITH FIXING OF ALL ACCESSORIES INCLUDING CONCRETING OF POLES. |
| 6 | ERECTION OF FOUR -POLE STRUCTURE WITH FIXING OF ALL ACCESSORIES INCLUDING CONCRETING OF POLES. | ERECTION OF FOUR -POLE STRUCTURE WITH FIXING OF ALL ACCESSORIES INCLUDING CONCRETING OF POLES. |
| 7 | CONSTRUCTION OF 11/.04/1O/25/63/100 KVA SUB. STATION DOUBLE POLE STRUCTURE COMPLITE INCLUDING THE FITTING OF ALL ACCESSORIES. | CONSTRUCTION OF 11/.04/1O/25/63/100 KVA SUB. STATION DOUBLE POLE STRUCTURE COMPLITE INCLUDING THE FITTING OF ALL ACCESSORIES. |
| 8 | CARRIAGE OF 250/400 KVA TRASNFORMER FROM E.S.C.HASARI TO WORK SITE . | CARRIAGE OF 250/400 KVA TRASNFORMER FROM E.S.C.HASARI TO WORK SITE . |
| 9 | CARRIAGE OF 1O/16/25/63/100 KVA TRANSFORMER FROM E.S.C.HASARI TO WORK SITE . | CARRIAGE OF 1O/16/25/63/100 KVA TRANSFORMER FROM E.S.C.HASARI TO WORK SITE . |
| 10 | THE WORK OF PROPER PLACEMENT OF TRANSFORMER ON DOUBLE POLE / TRANSFORMER PLINTH. | THE WORK OF PROPER PLACEMENT OF TRANSFORMER ON DOUBLE POLE / TRANSFORMER PLINTH. |
| 11 | DRILLING OF HOLE ON 11 KV X - ARM , TOP CHANNLE ,T-OFF,DROPER CHANNLE AND OTHER ACCESSORIES INCLUDING THE WORK OF ITS CARRIGE . | DRILLING OF HOLE ON 11 KV X - ARM , TOP CHANNLE ,T-OFF,DROPER CHANNLE AND OTHER ACCESSORIES INCLUDING THE WORK OF ITS CARRIGE . |
| 12 | FIXING OF EARTHING ROD COMPLITE. | FIXING OF EARTHING ROD COMPLITE. |
| 13 | ERRECTION AND GRAUTING OF STEY SET COMPLITE AS PER RESPO'. | ERRECTION AND GRAUTING OF STEY SET COMPLITE AS PER RESPO'. |
| 14 | PIT DIGGING OF HARD ROCKY/ DAMMAR/ RCC SURFACE ETC. | PIT DIGGING OF HARD ROCKY/ DAMMAR/ RCC SURFACE ETC. |
| 15 | PAINTING OF 11 KV 11 MTR LONG STP WITH RED OXIDE/ SILVER OXIDE PAINT INCLUDING THE COST OF MATERIAL. | PAINTING OF 11 KV 11 MTR LONG STP WITH RED OXIDE/ SILVER OXIDE PAINT INCLUDING THE COST OF MATERIAL. |
| 16 | ERRECTION OF 11KV LINE FROM EXISTING 11KV LINE TO NEW CONSTRUCTED DOUBLE /SINGLE POLE STRUCTURE AT DIFFERENT PLACE'S. | ERRECTION OF 11KV LINE FROM EXISTING 11KV LINE TO NEW CONSTRUCTED DOUBLE /SINGLE POLE STRUCTURE AT DIFFERENT PLACE'S. |
| 17 | FIXING OF DANGER BOARD. | FIXING OF DANGER BOARD. |
| 18 | LAYING /FIXING OF LT P.V.C.CABLE INCLUDING THE WORK OF CRIMPING OF LUG'S AND CONNECTION TO TANSFORMER /LINE. | LAYING /FIXING OF LT P.V.C.CABLE INCLUDING THE WORK OF CRIMPING OF LUG'S AND CONNECTION TO TANSFORMER /LINE. |
| 19 | GUARDING OF 11KV LINE WITH G.I WIRE,ANGLE AND NUT BOLT ETC. AS PER RESPO. | GUARDING OF 11KV LINE WITH G.I WIRE,ANGLE AND NUT BOLT ETC. AS PER RESPO. |
| 20 | LAYING OF ACSR WEASEL / RABIT CONDUCTOR INCLUDING IT'S SAGGING, STRINGING , BINDING AND JUMPRING ETC. | LAYING OF ACSR WEASEL / RABIT CONDUCTOR INCLUDING IT'S SAGGING, STRINGING , BINDING AND JUMPRING ETC. |
| 21 | LAYING OF ACSR RECOON/ DOG CONDUCTOR INCLUDING IT'S SAGGING, STRINGING , BINDING AND JUMPRING ETC. | LAYING OF ACSR RECOON/ DOG CONDUCTOR INCLUDING IT'S SAGGING, STRINGING , BINDING AND JUMPRING ETC. |
| 22 | LAYING OF AB CABLE OF SIZE 3X50/95/120 SQMM ON POLE . | LAYING OF AB CABLE OF SIZE 3X50/95/120 SQMM ON POLE . |
| 23 | INSTALLATION OF LT DISTRIBUTION BOX 3PH.ON POLE. | INSTALLATION OF LT DISTRIBUTION BOX 3PH.ON POLE. |
| 24 | GIVING THE CONNECTION THROUGH INSTALLED DISTRIBUTION BOX . | GIVING THE CONNECTION THROUGH INSTALLED DISTRIBUTION BOX . |
| 25 | CARRIAGE OF 11 KV MEETRING CUBICAL 10/5A,15/5A,20/5A AND AVOBEFROM ESC HASARI TO DIFFERENT CONSUMER WORK SITE. | CARRIAGE OF 11 KV MEETRING CUBICAL 10/5A,15/5A,20/5A AND AVOBEFROM ESC HASARI TO DIFFERENT CONSUMER WORK SITE. |
| 26 | LAYING OF 11 KV XLPE CABLE OF SIZE 3X25/35/70/120 SQMM ON POLE WITH THE HELP OF GI WIRE &UNDER THE SURFACE /CABLE TRINCH. | LAYING OF 11 KV XLPE CABLE OF SIZE 3X25/35/70/120 SQMM ON POLE WITH THE HELP OF GI WIRE &UNDER THE SURFACE /CABLE TRINCH. |
| 27 | DIGGING OF CABLE TRENCH FOR LAYING OF 11 KV CABLE WITH FIXING OF HDPE/GI PIPE (AS PER NEED) AND CABLE ROUTE MARKER ALSO COMPLETE. | DIGGING OF CABLE TRENCH FOR LAYING OF 11 KV CABLE WITH FIXING OF HDPE/GI PIPE (AS PER NEED) AND CABLE ROUTE MARKER ALSO COMPLETE. |
| 28 | HORIZONTAL BORING WITH THE HELP HDD MACHINE FOR ROAD CROSSING ETC. | HORIZONTAL BORING WITH THE HELP HDD MACHINE FOR ROAD CROSSING ETC. |
| 29 | INSTALLATION OF 11 KV MEETRING CUBICAL 10/5A,15/5A,20/5A AND AVOBE TO DIFFERENT CONSUMER WORK SITE.INCLUDING IT'SGRAUTING. | INSTALLATION OF 11 KV MEETRING CUBICAL 10/5A,15/5A,20/5A AND AVOBE TO DIFFERENT CONSUMER WORK SITE.INCLUDING IT'SGRAUTING. |
| 30 | FIXING /MOUNTNING OF 11 KV TERMINATION KIT OF SIZE 3X25/35/70/120 SQMM . | FIXING /MOUNTNING OF 11 KV TERMINATION KIT OF SIZE 3X25/35/70/120 SQMM . |
| 31 | CONNECTION THE CABLE THROUGH MEETRING CUBICAL AND DOUBLE POLE. | CONNECTION THE CABLE THROUGH MEETRING CUBICAL AND DOUBLE POLE. |
| 32 | CONSTRUCTION OF TRANFORMER PLINTH OF SIZE-5X5X4 FEET AS PER DIRECTION OF THE ENGINEER. WITH THE HELP OF BRIC,RIVER SAND & STONE BLAST INCLUDES THE COST OF LABOUR ,T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. | CONSTRUCTION OF TRANFORMER PLINTH OF SIZE-5X5X4 FEET AS PER DIRECTION OF THE ENGINEER. WITH THE HELP OF BRIC,RIVER SAND & STONE BLAST INCLUDES THE COST OF LABOUR ,T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. |
| 33 | SUPLLY & FIXING OF WIRE MESS FENSHING (10X10 = 40 RFT.) | SUPLLY & FIXING OF WIRE MESS FENSHING (10X10 = 40 RFT.) |
| 34 | FABRICATION AND FIXING OF SPECIAL TYPE H BRACKET MADE OF 100X50X5 MS CHANLE AND 50X50X5 MS ANGLE WITH NUT BOLT & CLAMPS ETC. | FABRICATION AND FIXING OF SPECIAL TYPE H BRACKET MADE OF 100X50X5 MS CHANLE AND 50X50X5 MS ANGLE WITH NUT BOLT & CLAMPS ETC. |
| 35 | EARTHING OF DISTRIBUTION TRANSFORMER BY CAMICAL EARTHING G.I. ELECRODE OF B GRADE, COMPLETE TO THE REQUIRMENT OF I.S.SPECIFICATION . ITS INCLUDE THE COST OF ALL MATERIAL, LABOUR, T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. | EARTHING OF DISTRIBUTION TRANSFORMER BY CAMICAL EARTHING G.I. ELECRODE OF B GRADE, COMPLETE TO THE REQUIRMENT OF I.S.SPECIFICATION . ITS INCLUDE THE COST OF ALL MATERIAL, LABOUR, T&P PROVIDED BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK. |
| 36 | DISMENTLING OF OLD DAMAGE POLE DUE TO ERRECTED NEW POLE FROM DIFFRENT WORK SITE. | DISMENTLING OF OLD DAMAGE POLE DUE TO ERRECTED NEW POLE FROM DIFFRENT WORK SITE. |
| 37 | TREE CHOPING | TREE CHOPING |
| 38 | विधुत वितरण खंड झांसी के अंतर्गत बुंदेलखंड विकास निधि / सांसद निधि / विधायक निधि से पोषित बिधुतीकरण कार्यों की लागत एवं अन्य जानकारियों को प्रदर्शित करने हेतु लोहे की शीट से निर्मित साइन बोर्ड (3 x 2) को उपलब्ध कराने एवं बोर्ड की स्थापना करने हेतु कार्य | विधुत वितरण खंड झांसी के अंतर्गत बुंदेलखंड विकास निधि / सांसद निधि / विधायक निधि से पोषित बिधुतीकरण कार्यों की लागत एवं अन्य जानकारियों को प्रदर्शित करने हेतु लोहे की शीट से निर्मित साइन बोर्ड (3 x 2) को उपलब्ध कराने एवं बोर्ड की स्थापना करने हेतु कार्य |
| 39 | FIXING OF 11 KV HEAT SHIRINK CABLE JOINTING KIT OF SIZE 3X70/120SQMM | FIXING OF 11 KV HEAT SHIRINK CABLE JOINTING KIT OF SIZE 3X70/120SQMM |
| 40 | FIXING OF GI PIPE 6\\" DIA | FIXING OF GI PIPE 6\\" DIA |
| 41 | Fixing OF HDPE PIPE (PE63, 10KG/CM3, IS 4984:1995) 6\\" DIA OR EQUIVALENT | Fixing OF HDPE PIPE (PE63, 10KG/CM3, IS 4984:1995) 6\\" DIA OR EQUIVALENT |