|
| 1 | Clearing thick bushes and thorny jungle without uprooting. |
| 2 | Scraping old painted surface including disposal of all scrapped materials. (by mechanical means). |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 (with 45 mm - 63 mm size st. ballast) as per Technical Specification Clause 405 as per directed by Engineer-in-Charge with proper completion of the work. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 (with 22.4 - 53 mm size st. ballast) as per Technical Specification Clause 405 as per directed by Engineer-in-Charge with proper completion of the work. |
| 5 | Brick edging on both sides of the road of first class (M-150) brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge. |
| 6 | Brick soling with brick laid on edge straight over burnt dry bricks including prepration of sub-grade and filling joints with local Sand, including cost of all material, labour and T&P etc. as per directed by Engineer-in-Charge with proper completion of the work. |
| 7 | Providing and applying primer coat with Bitumen emulsion (SS0-1) on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70 Kg/Sqm using mechanical means as per Technical Specification Clause 502, as per directed by Engineer-in-Charge with proper completion of the work. |
| 8 | Providing and applying tack coat with Bitumen VG-10 using Bitumen distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. as per directed by Engineer-in-Charge with proper completion of the work. |
| 9 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using Viscocity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller, finished to required level and grades. as per directed by Engineer-in-Charge with proper completion of the work. |
| 10 | Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade. as per directed by Engineer-in-Charge with proper completion of the work. |
| 11 | Earth work in filling of road side in ordinary soil, including lead up to 30 meter and lift up to 1.50 meter with proper leveling, dressing and manual compaction also including carriage up to 1.0 km by power transport with all cost of labour, T&P with proper completion of work as directed by Engineer-in-charges. Please Enable Macros to View BoQ information |