Tender For Estimate For Re-Lining / Lining Of W/C By Laying Ugpl/Bm Of O/L Rd 51665-L Of Handiaya Mr Of Barnala Disty Village Sekha,Uppli Distt.Barnala (Laying And Jointing Of Reinforced Cement Concrete Ugpl System And Other Allied Works In Construct
Tender Overview
Project Description
Tender for Estimate For Re-Lining / Lining Of W/C By Laying Ugpl/Bm Of O/L Rd 51665-L Of Handiaya Mr Of Barnala Disty Village Sekha,Uppli Distt.Barnala (Laying And Jointing Of Reinforced Cement Concrete Ugpl System And Other Allied Works In Construction Of Watercourse)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-Apr-2026 | CORRIGENDUM03NIT072026 | Date | 28-Apr-2026 |
| 2 | 23-Apr-2026 | CORRIGENDUM01NIT072026 | Date | 24-Apr-2026 |
| 3 | 24-Apr-2026 | CORRIGENDUM02NIT072026 | Date | 27-Apr-2026 |
| 4 | 23-Apr-2026 | CORRIGENDUM01NIT072026 | Date | 24-Apr-2026 |
| 5 | 23-Apr-2026 | CORRIGENDUM01NIT072026 | Date | 24-Apr-2026 |
| 6 | 24-Apr-2026 | CORRIGENDUM02NIT072026 | Date | 27-Apr-2026 |
| 7 | 30-Apr-2026 | CORRIGENDUM06NIT072026 | Date | 04-May-2026 |
| 8 | 28-Apr-2026 | CORRIGENDUM04NIT072026 | Date | 29-Apr-2026 |
| 9 | 29-May-2026 | CORRIGENDUM23NIT072026 | Date | 01-Jun-2026 |
| 10 | 28-May-2026 | CORRIGENDUM22NIT072026 | Date | 29-May-2026 |
| 11 | 25-May-2026 | CORRIGENDUM21NIT072026 | Date | 28-May-2026 |
| 12 | 22-May-2026 | CORRIGENDUM20NIT072026 | Date | 25-May-2026 |
| 13 | 21-May-2026 | CORRIGENDUM19NIT072026 | Date | 22-May-2026 |
| 14 | 28-May-2026 | CORRIGENDUM22NIT072026 | Date | 29-May-2026 |
| 15 | 22-May-2026 | CORRIGENDUM20NIT072026 | Date | 25-May-2026 |
| 16 | 25-May-2026 | CORRIGENDUM21NIT072026 | Date | 28-May-2026 |
| 17 | 21-May-2026 | CORRIGENDUM19NIT072026 | Date | 22-May-2026 |
| 18 | 20-May-2026 | CORRIGENDUM18NIT072026 | Date | 21-May-2026 |
| 19 | 07-May-2026 | CORRIGENDUM10NIT072026 | Date | 08-May-2026 |
| 20 | 06-May-2026 | CORRIGENDUM09NIT072026 | Date | 07-May-2026 |
| 21 | 04-May-2026 | CORRIGENDUM07NIT072026 | Date | 05-May-2026 |
| 22 | 05-May-2026 | CORRIGENDUM08NIT072026 | Date | 06-May-2026 |
| 23 | 30-Apr-2026 | CORRIGENDUM06NIT072026 | Date | 04-May-2026 |
| 24 | 08-May-2026 | CORRIGENDUM11NIT072026 | Date | 09-May-2026 |
| 25 | 19-May-2026 | CORRIGENDUM17NIT072026 | Date | 20-May-2026 |
| 26 | 18-May-2026 | CORRIGENDUM16NIT072026 | Date | 19-May-2026 |
| 27 | 15-May-2026 | CORRIGENDUM15NIT072026 | Date | 18-May-2026 |
| 28 | 18-May-2026 | CORRIGENDUM16NIT072026 | Date | 19-May-2026 |
| 29 | 20-May-2026 | CORRIGENDUM18NIT072026 | Date | 21-May-2026 |
| 30 | 19-May-2026 | CORRIGENDUM17NIT072026 | Date | 20-May-2026 |
| 31 | 15-May-2026 | CORRIGENDUM15NIT072026 | Date | 18-May-2026 |
| 32 | 13-May-2026 | CORRIGENDUM14NIT072026 | Date | 15-May-2026 |
| 33 | 13-May-2026 | CORRIGENDUM14NIT072026 | Date | 15-May-2026 |
| 34 | 15-May-2026 | CORRIGENDUM15NIT072026 | Date | 18-May-2026 |
| 35 | 09-May-2026 | CORRIGENDUM12NIT072026 | Date | 11-May-2026 |
| 36 | 13-May-2026 | CORRIGENDUM14NIT072026 | Date | 15-May-2026 |
| 37 | 11-May-2026 | CORRIGENDUM13NIT072026 | Date | 13-May-2026 |
| 38 | 08-May-2026 | CORRIGENDUM11NIT072026 | Date | 09-May-2026 |
| 39 | 09-May-2026 | CORRIGENDUM12NIT072026 | Date | 11-May-2026 |
| 40 | 06-May-2026 | CORRIGENDUM09NIT072026 | Date | 07-May-2026 |
| 41 | 07-May-2026 | CORRIGENDUM10NIT072026 | Date | 08-May-2026 |
| 42 | 08-May-2026 | CORRIGENDUM11NIT072026 | Date | 09-May-2026 |
| 43 | 05-May-2026 | CORRIGENDUM08NIT072026 | Date | 06-May-2026 |
| 44 | 04-May-2026 | CORRIGENDUM07NIT072026 | Date | 05-May-2026 |
| 45 | 29-Apr-2026 | CORRIGENDUM05NIT072026 | Date | 30-Apr-2026 |
| 46 | 28-Apr-2026 | CORRIGENDUM04NIT072026 | Date | 29-Apr-2026 |
| 47 | 27-Apr-2026 | CORRIGENDUM03NIT072026 | Date | 28-Apr-2026 |
| 48 | 24-Apr-2026 | CORRIGENDUM02NIT072026 | Date | 27-Apr-2026 |
| 49 | 23-Apr-2026 | CORRIGENDUM01NIT072026 | Date | 24-Apr-2026 |
| 50 | 05-May-2026 | CORRIGENDUM08NIT072026 | Date | 06-May-2026 |
| 51 | 29-Apr-2026 | CORRIGENDUM05NIT072026 | Date | 30-Apr-2026 |
| 52 | 27-Apr-2026 | CORRIGENDUM03NIT072026 | Date | 28-Apr-2026 |
| 53 | 06-May-2026 | CORRIGENDUM09NIT072026 | Date | 07-May-2026 |
| 54 | 05-May-2026 | CORRIGENDUM08NIT072026 | Date | 06-May-2026 |
| 55 | 04-May-2026 | CORRIGENDUM07NIT072026 | Date | 05-May-2026 |
| 56 | 30-Apr-2026 | CORRIGENDUM06NIT072026 | Date | 04-May-2026 |
| 57 | 09-May-2026 | CORRIGENDUM12NIT072026 | Date | 11-May-2026 |
| 58 | 08-May-2026 | CORRIGENDUM11NIT072026 | Date | 09-May-2026 |
| 59 | 04-May-2026 | CORRIGENDUM07NIT072026 | Date | 05-May-2026 |
| 60 | 07-May-2026 | CORRIGENDUM10NIT072026 | Date | 08-May-2026 |
| 61 | 06-May-2026 | CORRIGENDUM09NIT072026 | Date | 07-May-2026 |
| 62 | 05-May-2026 | CORRIGENDUM08NIT072026 | Date | 06-May-2026 |
| 63 | 30-Apr-2026 | CORRIGENDUM06NIT072026 | Date | 04-May-2026 |
| 64 | 04-May-2026 | CORRIGENDUM07NIT072026 | Date | 05-May-2026 |
| 65 | 29-Apr-2026 | CORRIGENDUM05NIT072026 | Date | 30-Apr-2026 |
| 66 | 22-May-2026 | CORRIGENDUM20NIT072026 | Date | 25-May-2026 |
| 67 | 25-May-2026 | CORRIGENDUM21NIT072026 | Date | 28-May-2026 |
| 68 | 02-Jun-2026 | CORRIGENDUM25NIT072026 | Date | 09-Jun-2026 |
| 69 | 25-May-2026 | CORRIGENDUM21NIT072026 | Date | 28-May-2026 |
| 70 | 01-Jun-2026 | CORRIGENDUM24NIT072026 | Date | 02-Jun-2026 |
| 71 | 29-May-2026 | CORRIGENDUM23NIT072026 | Date | 01-Jun-2026 |
| 72 | 28-May-2026 | CORRIGENDUM22NIT072026 | Date | 29-May-2026 |
| 73 | 09-Jun-2026 | CORRIGENDUM26NIT072026 | Date | 15-Jun-2026 |
| 74 | 15-Jun-2026 | CORRIGENDUM27NIT072026 | Date | 17-Jun-2026 |
| 75 | 19-Jun-2026 | Corrigendum29ofNIT072026 | Date | 22-Jun-2026 |
| 76 | 17-Jun-2026 | Corrigendum28ofNIT072026 | Date | 19-Jun-2026 |
| 77 | 15-Jun-2026 | CORRIGENDUM27NIT072026 | Date | 17-Jun-2026 |
| 78 | 09-Jun-2026 | CORRIGENDUM26NIT072026 | Date | 15-Jun-2026 |
| 79 | 28-Apr-2026 | CORRIGENDUM04NIT072026 | Date | 29-Apr-2026 |
| 80 | 09-May-2026 | CORRIGENDUM12NIT072026 | Date | 11-May-2026 |
| 81 | 11-May-2026 | CORRIGENDUM13NIT072026 | Date | 13-May-2026 |
| 82 | 08-May-2026 | CORRIGENDUM11NIT072026 | Date | 09-May-2026 |
| 83 | 07-May-2026 | CORRIGENDUM10NIT072026 | Date | 08-May-2026 |
| 84 | 05-May-2026 | CORRIGENDUM08NIT072026 | Date | 06-May-2026 |
| 85 | 06-May-2026 | CORRIGENDUM09NIT072026 | Date | 07-May-2026 |
| 86 | 13-May-2026 | CORRIGENDUM14NIT072026 | Date | 15-May-2026 |
| 87 | 09-May-2026 | CORRIGENDUM12NIT072026 | Date | 11-May-2026 |
| 88 | 11-May-2026 | CORRIGENDUM13NIT072026 | Date | 13-May-2026 |
| 89 | 07-May-2026 | CORRIGENDUM10NIT072026 | Date | 08-May-2026 |
| 90 | 08-May-2026 | CORRIGENDUM11NIT072026 | Date | 09-May-2026 |
| 91 | 06-May-2026 | CORRIGENDUM09NIT072026 | Date | 07-May-2026 |
| 92 | 04-May-2026 | CORRIGENDUM07NIT072026 | Date | 05-May-2026 |
| 93 | 30-Apr-2026 | CORRIGENDUM06NIT072026 | Date | 04-May-2026 |
| 94 | 29-Apr-2026 | CORRIGENDUM05NIT072026 | Date | 30-Apr-2026 |
| 95 | 28-Apr-2026 | CORRIGENDUM04NIT072026 | Date | 29-Apr-2026 |
| 96 | 18-May-2026 | CORRIGENDUM16NIT072026 | Date | 19-May-2026 |
| 97 | 15-May-2026 | CORRIGENDUM15NIT072026 | Date | 18-May-2026 |
| 98 | 22-May-2026 | CORRIGENDUM20NIT072026 | Date | 25-May-2026 |
| 99 | 21-May-2026 | CORRIGENDUM19NIT072026 | Date | 22-May-2026 |
| 100 | 20-May-2026 | CORRIGENDUM18NIT072026 | Date | 21-May-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr. |
| 2 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr. |
| 3 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 2.25 to 3 mtr |
| 4 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. |
| 5 | First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)]. |
| 6 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. |
| 7 | 10mm thick cement plaster 1:4 on bed and top. |
| 8 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement (CSRItem No 10.13 (a) (i) |
| 9 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle |
| 10 | Cement concrete 1:4:8 with brick ballast 40mm gauge |
| 11 | Lowering, jointing and cutting of RCC pipes 500 mm dia into trenches & laying same to correct alignment complete |
| 12 | Lowering, jointing and cutting of RCC pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment ( @2.50 metre / No) |
| 13 | Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.(CSR 2020 Item No.18.4) |
| 14 | Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4 (CSR 2020 Item No.29.35 ) |
| 15 | Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-500 mm |
| 16 | Centreing & shuttering for Concerte faces |
| 17 | Providing and fixing of Steel Shutter Gates Assembly in Main Pipeline complete in all respects. |
| 18 | Dismantling of Brick work in Cement, CSR 2020 - item no- 8.5 (b) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-10 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-11 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-12 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-13 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-14 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-15 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-16 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-17 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-18 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-19 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-20 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-21 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-22 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-23 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-24 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-25 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-26 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-27 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-28 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-29 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-30 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-31 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-32 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-33 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-34 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-35 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-36 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-37 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-38 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-39 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-40 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-41 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-42 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-43 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-44 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-45 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-46 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-47 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-48 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-49 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-50 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-51 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-52 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-53 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-54 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-55 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-56 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-57 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-58 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-59 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-60 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-61 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-62 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-63 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-64 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-65 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-66 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-67 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-68 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-69 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-70 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-71 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-72 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-73 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-74 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-75 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-76 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-77 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-78 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-79 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-80 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-81 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-82 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-83 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-84 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-85 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-86 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-87 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-88 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-89 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-90 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-91 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-92 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-93 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-94 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-95 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-96 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-97 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-98 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-99 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-100 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 days