| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil 80% + Ordinary rock 20% |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 4 : 8)1 cement 4 coasre sand 8 stone aggregate grade , with 40mm nominal size . crushed |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 3 : 6 ) with 20% boulders 1 cement 3 coasre sand 6 stone aggregate grade , with 20mm nominal size .crushed |
| 4 | Brick work with common burnt clay F.P.S (Non-modular) brick of class designation 75 in foundation and plinth in 1:6 (1 cement : 6 coarse sand) |
| 5 | Extra for brick work in Super structure above plinth level upto floor V level (By manual means) |
| 6 | Centering and shittering including strutting propping etc and removal of form work Foundation footing bases of columns etc |
| 7 | Providing nd laying Damp Proof course 50 mm thick cement concrete 1:2:4 and curing complete |
| 8 | 12 mm cement plaster on the rough side of single or half brick wall of mix 1:6 ( 1 cement 6 fine sand ) |
| 9 | Finishing walls with water proofing cement paint of requried shade New work(two or more coat )applied @384 kg /10 sqm |
| 10 | Steel work welded in built up section, trusses and framed works including cutting , hoising, fixing in position and applying a priming coat of approved steel primer and painting all complete |
| 11 | Providing and laying in position reinforced cement concrete of specified grade excluding the cost of centering and shuttering , finishing and reinforcement All work upto plinth level 1:2:4 |
| 12 | Reinforcement of RCC work in plinth band incl straightening, cutting, bending , placing in position and binding incl.all carriages complete. |
| 13 | Carriage 0f sand by mechanical transport including loading ,unloading and stacking completed lead up to 60 km and manual labour 150 mtr |
| 14 | Carriage 0f stone agg. below 4o mm size by mechanical transport including loading ,unloading and stacking completed stone aggregates below 40 mm size lead up to 60 km and manual labour 150 mtr |
| 15 | Carriage 0f bricks by mechanical transport including loading ,unloading and stacking completed lead up to 85 km and manual labour 150 mtr Please Enable Macros to View BoQ information |