| 1 | Part-A (Bituminous Work)Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 2 | Construction of Granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compaction with virbratory roller to achieve the desired density, complete as per clause 401, S.L.- 4-II, of MORD specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregates, watering and compacting to the required density Grading 3 as per Technical clause 405(3), of MORD specification & as per direction of E/I. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 5 | Brick edging on both side of the road of M-150 bricks 8cm. (3\\") wide and 12cm (4½\\") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In-Charge. Ch-20, S.I. 765 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 6 | Providing and applying prime coat with Bitumen emulsion on prepared surface of granular base including cleaning of road surface etc and spraying primer at the rate of 0.70/Sqm. using mechnical means as per Technical Specification. Clause 502, S.L.-5.10, of MORD specification (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 7 | Providing and applying Tack coat with Bitminous VG-10 using bitumen distributor at the rate of 0.35 Kg. per Sqm. on the prepared granular surface cleaned with Hydraulic broom as per Technical Specification. Clause 503, of MORD specification including cost of Bitumen as per direction of E/I. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 8 | Providing,laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm. to 5.60 mm. aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN. static roller capacity, finished to required level and grades to be Seal coat as per Technical Specification. Clause 508, of MORD specification including cost of Bitumen as per direction of E/I. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 9 | Providing,laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification. Clause 510, of MORD specification including cost of Bitumen as per direction of E/I. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 10 | Part-B (Culvert) Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 11 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. (P.C.C 1:3:6) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 12 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 13 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 14 | Providing and laying reinforced cement concrete in sub-structure as per drawing and technical specifications Clauses 800 (R.C.C grade M 25) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 15 | Providing and laying reinforced cement concrete in Super structure as per drawing and technical specifications Clauses 800 (R.C.C grade M 25) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 16 | Supplying, fitting and placing HYSD bar reinforcement in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (For Bridge Work) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 17 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 18 | Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211. (As per Mord Sl. 13.12) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 19 | Providing and laying cement concrete wearing course M-30 grade including reinforcement complete as per drawing and technical specification clause 800 and 1206.3 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 20 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (As per Mord Sl.No. 12.10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 21 | Drainage spouts complete as per drawing and technical specifications Clause 1209 (As per Mord Sl.No. 13.10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 22 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 23 | Finishing walls (Two coats) with water proofing cement paint of approved make such as Super snowcem, Durocem, Robiance, Guttucem, Supercem quality and of required shade on undecorated wall surface over and including one coat white cement primer to give and even shade after thoroughly brushing the surface, including cost of all material, Labour, T&P etc. complete required for proper completion of the work. Ch-15. S.I. 660 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 24 | Part-A (Bituminous Work) 05 Year Maintenance Charge @ 7.50%)Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.)1-1st Year @ Nill |
| 25 | 2nd Year @ 0.75% |
| 26 | 3rd Year @ 1.50% |
| 27 | 4th Year @ 2.25% |
| 28 | 5th Year @ 3.00% Please Enable Macros to View BoQ information |