| 1 | Earth work in oridinary soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods |
| 2 | Filling in Foundation and Plinth with with Sand including Cost of Conveying and Royalty Charges |
| 3 | Filling in Foundation and Plinth with with Murum including Cost of Conveying and Royalty Charges |
| 4 | Soling 40 mm stone & 20 mm stone Work Below Pcc work |
| 5 | Cement concrete (1:3:6)with 40 mm size hard granite metal including Cost of Conveying and Royalty Charges |
| 6 | R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and layingFooting |
| 7 | Plinth Beam |
| 8 | Column Below Ground level |
| 9 | Column above Ground level |
| 10 | S.Tank Slab |
| 11 | Brick work in Foundation and plinth With Flyash Brick of Size 25 x 12 x 8 mm CM (1:6) including Cost of Conveying of all material and Labour Charges. |
| 12 | Steel Rainforcement For Rcc Work including cutting,bending,binding,tying and placing in position including Cost of Conveying of all material and Labour,material Charges. |
| 13 | 12mm. thick cement plaster (1:6) for brick work over outer surface of brick work including Cost of Conveying of all m |
| 14 | Wall Vetrifyed Tiles including Cost of Conveying of all material and Labour,material Charges. |
| 15 | Floor Vetrifyed Tiles including Cost of Conveying of all material and Labour,material Charges. |
| 16 | Laminet Door including Cost of Conveying of all material and Labour,material Charges. |
| 17 | UPVC Ventilator Fixixng Work including Cost of Conveying of all material and Labour,material Charges. |
| 18 | Electrical Work including Cost of Conveying of all material and Labour,material Charges. |
| 19 | CP Fitting Work including Cost of Conveying of all material and Labour,material Charges. |
| 20 | Sanitary Fitting Work including Cost of Conveying of all material and Labour,material Charges. |
| 21 | Granite For Table Top Wash Basin |
| 22 | 1000 lit water Tank |
| 23 | 1000 lit water tank Structure |
| 24 | Plumbing Work including Cost of Conveying of all material and Labour,material Charges. |
| 25 | Foundation External Painting |
| 26 | Ms Shutter Please Enable Macros to View BoQ information |