| 1 | Dismentling of grids, trusses and other steel work including stacking of dismantled materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet). SI No. 702 |
| 2 | Dismentling of brick work in cement and sand mortar including stacking of dismantled materials as directed by Engineer-in-charge with in a distance of 60 mt. (200 feet). SI No. 692 |
| 3 | Excavation in foundations in soil mixed with moorum/shingle/kankar including lift upto 1.5m and lead upto 30 m. & including filling, watering and ramming of excavated Earth into the trenches or into the Space between the building and the sides of the foundation trenches or into plinth and removal and disposal of surplus earth as directed by the engineer-incharges upto a distance of 30m. from the foundation trenches.(S.I.No. 252) |
| 4 | Cement concrete with 4 cm gauge approved stone ballast, approved coarse sand and cement in proportion of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of the workS.I.No. 281. |
| 5 | R.C.C. work with cement approved coarse sand and 2cm (1.5'') gauge approved stone ballast in the proportion 1:2:4 Raft Foundation of reinforcement and its bending but including its fixing and binding the same necessary with 24BWG binding wire and including necessary centering and shuttering etc. and also including supply of materials labour and tools and plants etc. required for proper completion of the work, strength of the concrete shall not be less than M-150SI no 287 |
| 6 | Same as item no. 5 above but R.C.C. work in 1:1½:3 with 2 cm. stone grit in Column work.S.I.No. 289 |
| 7 | M-150 class brick work in 1:6 cement and Fine sand of 1.25 F.M. mortar in foundation Including cost all materials, labour & T&P, etc. required for proper completion of the work but for wall of one brick thick. Add for extra labour. S.I.No. 303 |
| 8 | M-150 class brick work in 1:4 cement and Fine sand of 1.25 F.M. mortar in super structure Including cost all materials, labour & T&P, etc. required for proper completion of the work but for wall of one brick thick. Add for extra labour. S.I.No. 305+309 |
| 9 | 12mm thick plaster in 1:4 cement and coarse sand mortar thickness not to be less then 10mm including supply of all materials ,labour and tools & plants etc. required for proper completion of work. (S.I.No. 17.58ii) |
| 10 | R.C.C. work with cement approved coarse sand and 4cm (1.5'') gauge approved srone ballast in the proportion 1:2:4 in lighter beam of doors and windows excluding supply of reinforcement and its bending but including its fixing and binding the same necessary with 24BWG binding wire and including necessary centering and shuttering etc. and also including supply of materials labour and tools and plants etc. required for proper completion of the work, strength of the concrete shall not be less than M-150SI no 285 |
| 11 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. (SI. No. 504) |
| 12 | Supply of M.S. Grill of approved quality and drawing made of flat iron not bigger then 20x4 mm size including supply of material, fabrication, labour & T&P and also one coat of red oxide paint complet in all respect as per direction of Engineer-in-charge for proper completion of work at site. S.I.No. 3 p 53 |
| 13 | Same as above item no. 12 but for labour work only |
| 14 | Finishing walls with water proofing cement paint of approved make and quality on new work with three coat to give to give an even shade. Including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No. 660+661 |
| 15 | Painting or varnishing on iron works in small areas or new wood work with one coat of ready mixed priming paint & one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthetic varnish etc. required for proper completion of work. Paint to be used should confirm to the ISI No 103 1950 SI. No. 641+642 |
| 16 | Deduct from dismentled of brick work as same item no. 2 total bricks Please Enable Macros to View BoQ information |