| 1 | Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause1903 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 Bituminous Courses |
| 3 | WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.By Mechanical Means |
| 4 | WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means |
| 5 | Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on preparedsurface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. |
| 6 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per TechnicalSpecification Clause 503. |
| 7 | Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binderand filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensr control to the required grade, level andalignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Grading I - 13mm using Bitumen VG - 10 (bituminous binder @ 4.5 %of mix) |
| 8 | Edging with 2nd class Bricks, laid dry lengthwise (Edging with 2nd class bricks, laid dry lengthwise, including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres) |
| 9 | Reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of class-B Type IV refel sheeting fixed over 3mm/4mm thick Aluminium composite material sheet vide clause 801.3, depending on the size of the sign fixed over back support frame of min 25 x 25 x 3mm Angle mounted on a mild steel a mild steel circular pipe 65 NB, 3.2 mm thickness, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level asper approved drawing. The sign shall be maintained as per section 12 of IRC 67. 600 mm equilateral triangle Please Enable Macros to View BoQ information |