|
| 1 | R&M of Coal Mills at Durgapur PP-II (2x60MW) |
| 2 | Total of Schedule-2Plant and Equipment Including Typing Test Charges and mandatory spares parts to be supplied from Employer's Country |
| 3 | Total of Schedule-3Local Transportation including port Handling, Port Clearance , custom reconciliation & inland transit insurance and other local costs incidental to delivery of plant and Equipment including mandatory Spares. |
| 4 | Total of Schedule-4 Installation Services including erction Works,Insurance covers (other than inland transit Insurance) and other services as specified in the bidding documents including taxes as applicable |
| 5 | Total of Schedule-7Goods & services Tax (GST) R&M of Coal Mills at Durgapur PP-II (2x60MW)Referenc No/Bidding Document No:CMCC260017 | Tender ID - 2026_NSPCL_273894 SCHEDULE - 2 : PLANT AND EQUIPMENT INCLUDING TYPE TEST CHARGES AND MANDATORY SPARES TO BE SUPPLIED FROM WITHIN THE EMPLOYER'S COUNTRY Sl. No. Item Descrition Unit Of Measurement QTY. Rate Ex-works Price Amount Ex- Works Price Component |
| 6 | 2.0 A Supply of Main Equipment A.1 Mechanical items of Bowl Mills (8 Nos.) and Mill reject system Lot 1.0 0.0 A.2 Electrical items for both Bowl Mills (8Nos.) and Mill reject system Lot 1.0 0.0 A.3 Control and Instrumentation Items for both both Bowl Mills (8Nos.) and Mill reject system Lot 1.0 0.0 A.4 Misc. Equipments ( other than specified above ) Lot 1.0 0.0 TOTAL (A) 0.0 B Supply of Mandatory Spares |
| 7 | Grinding elements |
| 8 | Rollers |
| 9 | Bull ring segments/ bowl / rings |
| 10 | Gear box internals (except bearings & seals) |
| 11 | Complete Gear Box |
| 12 | Bearings for mills |
| 13 | Seals & rings for gear box |
| 14 | Seals & rings for mills |
| 15 | Liners with brackets & fasteners |
| 16 | Discharge valve assembly |
| 17 | Multiport outlet & liners |
| 18 | Mill main shaft/yoke |
| 19 | Journal & Spring |
| 20 | Hydraulic loading cylinder |
| 21 | Filter Cartridges |
| 22 | Actuators (pneumatic/hydraulic) (complete) 3 no. of each type |
| 23 | Actuators (pneumatic/hydraulic) spare kits 3 set of each type * |
| 24 | Mill Bottom |
| 25 | Bowl hub assembly/Ring seat |
| 26 | Lube Oil System |
| 27 | Pump & Motor coupling |
| 28 | Pump assembly |
| 29 | Filters |
| 30 | Pressure regulator |
| 31 | Oil cooler assembly for coal mills |
| 32 | Bearings for gear box |
| 33 | Coupling between mill and motor |
| 34 | Mill motor complete |
| 35 | Mill motor bearing |
| 36 | Mill lube oil motor |
| 37 | Electronic transmitters ( PT, FT, LT, DPT) 15 % or 3 nos of each type, whichever is more. |
| 38 | Temperature transmitters 15 % or 3 nos of each type, whichever is more. |
| 39 | Temperature elements 15 % or 3 nos of each type, whichever is more. |
| 40 | Local indicators ( PG, TG, LG, DPG) 15 % or 3 nos of each type, whichever is more. TOTAL (B) (MANDATORY SPARES) 0.0 GRAND TOTAL SCHEDULE-2 [ TOTAL- (A) + (B) ] ( Bidder should verify that this amount is being reflected in sheet 'BOQ1' Sl. no. 1.01 ) 0.0 Notes : |
| 41 | For Mandatory Spares Bidders are required to fill unit rates as well as the amount under cloum '5' & '6' respectively. |
| 42 | One set means complete replacement of one Mill. The assembly/sub-assembly which have different orientation (like left hand, top or bottom), different direction of rotation or mirror image positioning or any other reasons which result in maintaining two different sets of the spares to be used for the subject assembly/sub-assembly, these shall be considered as different types of assembly/sub-assembly. |
| 43 | Wherever quantity has been specified as percentage (%), the quantity of mandatory spares to be provided by the Bidder shall be the specified percentage (%) of the total population required to meet the specification requirements. In case the quantity of mandatory spares so calculated happens to be a fraction, the same shall be rounded off to next higher whole number. |
| 44 | Wherever the quantities have been indicated for each type, size, thickness, material, radius, range, rating etc., these shall cover all the items supplied and installed and the breakup for these shall be furnished in the bid. |
| 45 | In case spares indicated in the list are not applicable to the particular deisgn offered by the bidder, the bidder should offer spares applicable to offered design with quantities generally in line with the approach followed in the above list. |
| 46 | In case the description/quantity for any item mentioned in this Schedule is at variance from what has been stated in the Technical Specifications and its subsequent amendments and clarifications, the stipulations of the technical specifications and its subsequent amendment and clarifications shall prevail. |
| 47 | **Note: One set of grinding element at B(1.1) & B(1.2) above is defined as under : 1 Set = (Grinding elements needed for complete replacement of one mill) X A WhereA= [8000 x N)/GWL, rounded off to nearest higher whole number.]GWL = Guaranteed wear life of grinding element B(1.1) & B(1.2) as offered by the bidder.N = Number of mills installed for one Steam generator unit |
| 48 | * One set means one complete replacement of one mill R&M of Coal Mills at Durgapur PP-II (2x60MW)Referenc No/Bidding Document No:CMCC260017 | Tender ID - 2026_NSPCL_273894 SCHEDULE- 3 : Local Transportation including port Handling, Port Clearance , custom reconciliation & inland transit insurance and other local costs incidental to delivery of plant and Equipment including mandatory Spares. Item Description Qty Unit Total Price (Indian Rupees) |
| 49 | 2.0 I MAIN EQUIPMENT 1.0 LOT II MANDATORY SPARES 1.0 LOT TOTAL OF SCHEDULE-3 ( I +II )( Bidder should verify that this amount is being reflected in sheet 'BOQ1' Sl. no. 1.02 ) 0.0 R&M of Coal Mills at Durgapur PP-II (2x60MW)Referenc No/Bidding Document No:CMCC260017 | Tender ID - 2026_NSPCL_273894 SCHEDULE - 4 : Installation Services including erection Works,Insurance covers(other than inland transit Insurance ) and other services as specified in the bidding documents excluding taxes as applicable Item Sl. No. Description Unit Of Measurement QTY. Total Price (Indian Rupees) Unit Price in INR Amount in INR |
| 50 | 2.0 A Installation Services I Mechanical items of Bowl Mills (8 Nos.) and Mill reject system Lot 1.0 0.0 II Electrical items for both Bowl Mills (8Nos.) and Mill reject system Lot 1.0 0.0 III Control and Instrumentation Items for both both Bowl Mills (8Nos.) and Mill reject system Lot 1.0 0.0 IV Misc. works ( other than specified above ) Lot 1.0 0.0 Total Installation Services (A) 0.0 B Amount linked to Safety Aspects/ compliance to Safety Rules (This Price component should not be less than 2.5% of the cumulative total of Installation services of the Contract as per BDS item no. 4.3) Lot 1.0 0.0 TOTAL for Schedule-4 (A+B) (To Schedule 4 Grand Summary) ( Bidder should verify that this amount is being reflected in sheet 'BOQ1' Sl. no. 1.03 ) 0.0 |
| 51 | GRAND TOTAL R&M of Coal Mills at Durgapur PP-II (2x60MW)Referenc No/Bidding Document No:CMCC260017 | Tender ID - 2026_NSPCL_273894 Schedule No. 6 : Recommended Spare Parts Item Description Qty Unit Price Total Price Local transportation charges (including inland insurance) Total price (as delivered at Project) Ex-Works (India) (INR) Ex-Works (India) (INR) FOR Site (INR) |
| 52 | 2.0 Recommended spares for selected Option 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTAL PRICE 0.0 We also confirm that the items of Recommended spares with same specification having same identification number but with different item code have been quoted by us at the same price. Further all such items of spares have been clubbed together and enlosed separately at Annexure-............... to our offer R&M of Coal Mills at Durgapur PP-II (2x60MW)Referenc No/Bidding Document No:CMCC260017 | Tender ID - 2026_NSPCL_273894 Schedule No. 7: Goods and Services Tax (GST) The details of Goods and Services Tax (as on seven (07) days prior to the last date for submission of price bids) applicable on the price of goods and services quoted in Schedule-2, 3 & 4, not included in the Bid Price and which may be payable by the Employer in accordance with the provisions of Bidding Documents are as under : S.No. Bid Price Component Rate of GST (%) Amount on which GST applicable (in INR) Total GST payable (in INR) |
| 53 | Ex-Works-Main Equipment (Schedule-2) |
| 54 | Ex-Works-Mandatory Spares (Schedule-2) |
| 55 | F&I-Main Equipment (Schedule-3) |
| 56 | F&I-Mandatory Spares (Schedule-3) |
| 57 | Installation Services Services (Schedule-4) |
| 58 | Amount linked to Safety Aspects/ compliance to Safety Rules (Schedule-4) TOTAL Schedule-7(GST) ( Bidder should verify that this amount is being reflected in sheet 'BOQ1' Sl. no. 1.04 ) 0.0 NOTE: 1. In case rate of GST is different for various items, such different rates of GST along with the amount on which such GST is applicable shall be suitably indicated by the bidders in this schedule.2. Bidder may also insert additional rows to indicate different rates of GST, if applicable, R&M of Coal Mills at Durgapur PP-II (2x60MW)Referenc No/Bidding Document No:CMCC260017 | Tender ID - 2026_NSPCL_273894 Schedule No. 8B: BREAK-UP OF THE TYPE TESTS CHARGES QUOTED IN SCHEDULE-2. We confirm that in case for the type test certificates furnished by us during execution of Contract, in case of award, is (are) not acceptable to the Owner on the grounds indicated in the technical specifications, the relevant test(s) shall be conducted without any price repercussion to the Owner. R&M of Coal Mills at Durgapur PP-II (2x60MW)Referenc No/Bidding Document No:CMCC260017 | Tender ID - 2026_NSPCL_273894 SCHEDULE - 9 -Schedule of Unit Rate (The quantity indicated here at column no 6 are for all the two units) Item Description Unit Quantity Unit cost (INR) Amount (INR) |
| 59 | 2.0 NOT APPLICALBLE NOTES: 1) The Unit rates of various items which are break-up of items quoted in Schedule-1 and Shcedule-3 on 'Lot'/'Lumpsum'/'Set' basis are mentioned here under. We confirm that the prices of these items are as per the requirement of Techinical Specification are already included in the lump-sum prices quoted in Schedule-1 and/or Schedule-3. We further confirm that these unit rates shall be used for contract price adjustment on account of quantity variation, if any, during execution of work as per approved drawings. The rates for Transportation and Insuarnce component quoted in Schedule-2 shall be considered on prorata lumpsum basis, in case of any variations. 2) The bidder shall specify the item description , quantities , unit rates in this schedule as per his own break-up from which schedule 1 and 3 will be built up. 3) F&I and installation prices corresponding to above items shall be calculated proportionately on the basis of total quoted price of equipment(Ex-Works) under Schedule-2 and corressponding F&I and Installation price of these equipment quoted in Scedule 3 and Schedule-4 4) The items under unit rate portion mentioned in shcedule 1 & 3 need not be repeated here. In case of any repetition of items here, the rates quoted in Schedule 1 & 3 shall prevail . Please Enable Macros to View BoQ information |