| 1 | R/B Walls:- Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 2 | Supply and filling of stone soling in foundation trenches tightly hand packed with hand ramming, dressing ,watering including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth, including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 5 | POINTING ON STONE WORKPointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) incl.cost and carriage of all materials from approved source to site of work with all leads, lifts, loading, unloading and octori.(Finished work to be measured, complete.) |
| 6 | Providing and laying PCC Coping 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4graded stone aggregate 20 mm nominal size)( with all leads, lifts, loading, unloading and octori.(Finished work to be measured, complete.) |
| 7 | Back filling with Boulder back sides of walls,Pipes etc complete as per drawing and technical specifications including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 8 | RCC Pipes:-Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 9 | Supply and filling of stone soling in foundation trenches tightly hand packed with hand ramming, dressing ,watering including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 10 | Providing and laying non-pressure of specified class 450 mm dia R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1cement: 2 fine sand) including testing of joints etc. complete. 20.6.1 Non-pressure NP-3 class (Medium duty) including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 11 | Back filling with Boulder back sides of walls,Pipes etc complete as per drawing and technical specifications including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 12 | CC DrainEarth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 13 | Supply and filling of stone soling in foundation trenches tightly hand packed with hand ramming, dressing ,watering including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 14 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 15 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, walls, bases for columns, including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 17 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 25mm thick with 12.5 mm nominal size stone aggregate., including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 18 | Pavement:-Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC,carriage of mixed material by tippers to work site, for all leads & lifts,spreading in uniform layers of specified thickness with motor grader onprepared surface and compacting with vibratory power roller to achievethe desired density, complete as per specifications and directions ofEngineer-in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 19 | Providing, laying, spreading and compacting graded stone aggregate (sizerange 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mixplant, carriage of mixed material by tipper to site, for all leads & lifts,laying in uniform layers with mechanical paver finisher in sub- base / basecourse on well prepared surface and compacting with vibratory roller of 8to 10 tonne capacity to achieve the desired density, complete as per\specifications and directions of Engineer-in-Charge. including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 20 | Providing and applying tack coat using hot straight run bitumen of grade –VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm.including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 21 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisherequipped with electronic sensor to the required grade, level and alignmentand rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete asper specifications and directions of Engineer-in-Charge.50 to 100 mm average compacted thickness with bitumenof grade VG-10 @ 3.5% (percentage by weight of total mix) preparedin Drum Type Hot Mix Plant of 60-90 TPH capacity including all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 22 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandemrollers to achieve the desired compaction and density as per specification,complete and as per directions of Engineer-in-Charge.16.64.1 25 mm compacted thickness with bitumen of grade VG- 30@5% (percentage by weight of total mix) and lime filler @ 2%(percentage by weight of Aggregate) prepared in Batch Type Hot MixPlant of 100-120 TPH capacity.ncluding all carriages and lifts, Complete job., with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) |
| 23 | Providing and laying seal coat of premixed fine aggregate (passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete.with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) Please Enable Macros to View BoQ information |